Time Limit The development to which this permission relates must be begun not later than the expiration of three years beginning with the date on which this permission is granted. Reason: In order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended).
Approved Plans The development hereby approved shall be carried out in complete accordance with the plans and specifications detailed below and shall relate to no other plans: a) Revised Plans and Elevations Rev A - Drawing no.2024.084.PP01. A - Received 17 June 2025 Reason: For the avoidance of doubt and to ensure that the development is carried out as approved.
Materials - Matching The materials to be used in the construction of the external surfaces (including walls, roof & windows) of the development hereby permitted shall match those used in the existing building, or shall be in accordance with details which have first been submitted to and approved in writing by the Local Planning Authority. Thereafter the development shall be carried out in accordance with the approved details. Reason: To ensure the use of appropriate materials in the interests of the visual amenities of the area having regard for policies DC1, CS4 and CS5 of the Local Plan and section 12 of the NPPF.
Reason for Approval This application is satisfactory in that the design of the proposed single storey extensions to rear accord with the principles of the National Planning Policy Framework (NPPF) and, where appropriate, the Council has worked with the applicant in a positive and proactive way in line with the NPPF. In addition the single storey extensions to rear accords with the local policy requirements (Policies CS4, CS5, DC1 of the Council's Local Development Framework). In particular the single storey extensions to rear are designed so that their appearance is complementary to the existing dwellinghouse and so that they will not have a detrimental impact on the amenity of any adjoining or nearby resident. The single storey extensions to rear will not prejudice the character and appearance of the area and will not significantly affect any landscaping nor prevent adequate and safe access to the dwelling. The application is therefore considered to be an acceptable form of development, fully in accordance with the relevant policy guidance and there are no material considerations which would indicate that the development should be refused.
Deliveries to Site It should be ensured that, during construction, deliveries to the site do not obstruct the highway. If deliveries are to be made which may cause an obstruction then early discussion should be had with the Highway Authority on the timing of these deliveries and measures that may be required so as to mitigate the effect of the obstruction to the general public.
Rights of Access/Encroachment This planning approval does not permit any person to access another person’s land/property to enable the works to be completed, without their consent. Any encroachment into another person’s land/property above or below ground is a civil matter to be resolved between the relevant parties.
Building Materials on the Highway The applicant is reminded that building materials shall not be deposited on the highway without the specific consent of the Highways Authority.
Windows - Opaque The two high windows in west elavation of west extension hereby approved must be opaque glazed to a minimum of level 3. The opaque glazing must be implemented on installation and retained for the life of the building. Reason: In the interests of the amenities of residents and to ensure a satisfactory form of development having regard for policy DC1 of the Local Plan
Materials specified Materials used will match the existing red brick wall base of approx. 0.80cm with white render above, and include horizontal brick course detailing between the two. Reason: To ensure consistency of design with the host property.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.