Council planning record

Two storey extension to side and single storey extension to rear

5 Abdale Avenue Middlesbrough TS5 5JL

Application Approve with ConditionsReference: 24/0194/FULMiddlesbrough Borough Council

Last published check: 28 Sept 2026, 10:07. Check the council record for more recent changes.

Application location

5 Abdale Avenue Middlesbrough TS5 5JL

This record has no verified map location.

Application summary

Status
Application Approve with Conditions
Application type
Full Planning
Received
17 May 2024
Validated
20 May 2024
Determination deadline
20 Aug 2024
Local authority
Middlesbrough Borough Council

Application overview

Two storey extension to side and single storey extension to rear

Proposal details

Reference
24/0194/FUL
Alternative references
PP-13074575
Ward
Linthorpe
Agent
Pyramid Architectural Design
UPRN
100110088952

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 15 of 15

DocumentPublishedAction
Application Form - Without Personal DataApplication Form17 May 2024View
Officer ReportReport20 Aug 2024View
Proposed floor plans - 03Drawing17 May 2024View
Proposed elevations - 04Drawing17 May 2024View
Existing and proposed site plan - 05Drawing17 May 2024View
Existing floor & roof plan - 01Drawing17 May 2024View
Existing elevations - 02Drawing17 May 2024View
The location planDrawing17 May 2024View
Decision NoticeDecision20 Aug 2024View
Existing & Proposed Site Plans 05 Rev 03Revised Drawing6 Aug 2024View
Proposed Elevations 04 Rev 3Revised Drawing6 Aug 2024View
Proposed Plans 03 Rev 3Revised Drawing6 Aug 2024View
Existing Elevations 02 Rev 3Revised Drawing6 Aug 2024View
Existing Plans 01 Rev 3Revised Drawing6 Aug 2024View
Neighbour Notification ListNeighbour Notification List20 May 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Dispatch date

    Published milestoneCouncil source
  9. Decision date

    Published milestoneCouncil source
  10. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve with Conditions
Decision Notice
Planning conditions
  1. Time Limit The development to which this permission relates must be begun not later than the expiration of three years beginning with the date on which this permission is granted. Reason: In order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended).
  2. Approved Plans The development hereby approved shall be carried out in complete accordance with the plans and specifications detailed below and shall relate to no other plans: a) Location Plan - Date produced 17 May 2024 b) Proposed Plans - Drawing no. Page 03, rev 3 - received 06 August 2024 c) Proposed Elevations - Drawing no. Page 04, rev 3 - received 06 August 2024 d) Existing and Proposed Site Plans - Drawing no. Page 05, rev 3 - received 06 August 2024 Reason: For the avoidance of doubt and to ensure that the development is carried out as approved.
  3. Materials - Matching The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building, or shall be in accordance with details to be submitted to and approved in writing by the Local Planning Authority. Thereafter the development shall be carried out in accordance with the approved details. Reason: To ensure the use of appropriate materials in the interests of the visual amenities of the area having regard for policies DC1, CS4 and CS5 of the Local Plan and section 12 of the NPPF.
  4. Reason for Approval It is considered that the proposal is in accordance with the Policies within the Local Development Framework Core Strategy and Development Policies document in that the scale, design and materials proposed are appropriate to the site location and there will be no demonstrable adverse impact on adjacent residential amenity. The Local Planning Authority has acted positively and proactively in determining this application by assessing the proposal against all material considerations, including LDF Policies and any representations that may have been received and subsequently determining to grant planning permission in accordance with the presumption in favour of sustainable development, as set out in the National Planning Policy Framework.
  5. Civil Ownership Matters This permission refers only to that required under the Town and Country Planning Act 1990 (as amended) and does not include any other consent or approval under any enactments, byelaw, order or regulation. The grant of planning permission does not override any third party rights which may exist over the application site. In addition, you are advised that any works affecting party walls or involving excavations for foundations adjacent to a party wall you will be required to serve notice on all adjoining owners before work commences and adhere to the requirements of the Party Wall Act 1996.
  6. Rights of Access/Encroachment This planning approval does not permit any person to access another person’s land/property to enable the works to be completed, without their consent. Any encroachment into another person’s land/property above or below ground is a civil matter to be resolved between the relevant parties.
  7. Building Regulations Compliance with Building Regulations will be required. Before commencing works it is recommended that discussions take place with the Building Control section of this Council. You can contact Building Control on 01642 729375 or by email at buildingcontrol@middlesbrough.gov.uk. Where a building regulations approval is obtained which differs from your planning permission, you should discuss this matter with the Local Planning Authority to determine if the changes require further consent under planning legislation.
  8. Deliveries to Site It should be ensured that, during construction, deliveries to the site do not obstruct the highway. If deliveries are to be made which may cause an obstruction then early discussion should be had with the Highway Authority on the timing of these deliveries and measures that may be required so as to mitigate the effect of the obstruction to the general public.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.