Council planning record

Two storey side extension, porch extension to front, one dormer to front, two dormers to rear and a roof light to the rear.

1, Bridgewater Court, MIDDLESBROUGH, TS4 2GE

This application was Determined on 21 Dec 2021.Reference: 21/1017FULMiddlesbrough Borough Council

Last published check: 28 Sept 2026, 22:31. Check the council record for more recent changes.

Application location

1, Bridgewater Court, MIDDLESBROUGH, TS4 2GE

This record has no verified map location.

Application summary

Status
This application was Determined on 21 Dec 2021.
Application type
Full Planning
Received
28 Oct 2021
Validated
16 Nov 2021
Determination deadline
10 Jan 2022
Local authority
Middlesbrough Borough Council

Application overview

Two storey side extension, porch extension to front, one dormer to front, two dormers to rear and a roof light to the rear.

Proposal details

Reference
21/1017FUL
Agent
Patrick Conlin
UPRN
10023177585

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 4 of 4

DocumentPublishedAction
ApplicationFormRedacted.pdfApplication Form4 Nov 2021View
1_Bridge_Water_Court_OS.jpgDrawing16 Nov 2021View
Existing & Proposed plans Rev 2Drawing1 Dec 2021View
DELEGATED REPORTDelegated Report22 Dec 2021View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Registration date

    Published milestoneCouncil source
  3. Valid date

    Published milestoneCouncil source
  4. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Dispatch date

    Published milestoneCouncil source
  7. Decision date

    Published milestoneCouncil source
  8. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve with Conditions
Planning conditions
  1. The development to which this permission relates must be begun not later than the expiration of three years beginning with the date on which this permission is granted. Reason: The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990.
  2. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building. Reason: To ensure the use of satisfactory materials.
  3. The development hereby approved shall be carried out in complete accordance with the plans and specifications detailed below and shall relate to no other plans: a) Proposed site plan 001 Rev 1, received 1 December 2021 b) Location plan, received 16 November 2021 Reason: To ensure a satisfactory form of development and for the avoidance of doubt.
  4. This planning approval does not permit any person to access another person's land/property to enable the works to be completed, without their consent. Any encroachment into another person's land/property above or below ground is a civil matter to be resolved between the relevant parties.
  5. The applicant is reminded that building materials shall not be deposited on the highway without the specific consent of the Highway Authority.
  6. It should be ensured that, during construction, deliveries to the site do not obstruct the highway. If deliveries are to be made which may cause an obstruction then early discussion should be had with the Highway Authority on the timing of these deliveries and measures that may be required so as to mitigate the effect of the obstruction to the general public.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.