The proposed connection will consist of a single 110kV underground cable measuring approx. 430m between Tamnamore main 110kV substation and an approved Battery Energy Storage System. The underground cable is rated 110kV and comprising 3x160mm single core XLPE cables installed in 1600mm diameter ducts with an additional 100mm diameter duct laid as a spare duct for communication links. The cable trench will be no more than 600mm wide by 1300mm deep. The underground cable will pass through lands that are under the ownership of third parties for which an easement will be obtained by NIE Networks (who will be responsible for the construction and operation of the cable). The underground cable will connect into the existing Main substation with no new buildings or structures.

Lands immediately East of Tamnamore Substation and C.260m SW of 167 Ballynakilly Road Coalisland

Permission GrantedReference: LA09/2024/0525/LDPMid Ulster District Council

Last published check: 29 Sept 2026, 14:50. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Made Date

    Published milestoneCouncil source
  4. Decision Issued Date

    Published milestoneCouncil source
  5. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Permission Granted
Application type
LD Certificate Proposed
Received
3 May 2024
Validated
3 May 2024
Determination deadline
Not published
Local authority
Mid Ulster District Council

Application overview

The proposed connection will consist of a single 110kV underground cable measuring approx. 430m between Tamnamore main 110kV substation and an approved Battery Energy Storage System. The underground cable is rated 110kV and comprising 3x160mm single core XLPE cables installed in 1600mm diameter ducts with an additional 100mm diameter duct laid as a spare duct for communication links. The cable trench will be no more than 600mm wide by 1300mm deep. The underground cable will pass through lands that are under the ownership of third parties for which an easement will be obtained by NIE Networks (who will be responsible for the construction and operation of the cable). The underground cable will connect into the existing Main substation with no new buildings or structures.

Proposal details

Reference
LA09/2024/0525/LDP
Alternative references
DSFX1714733164479
Ward
Killyman
Parish
Dungannon
Agent
RPS

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Lands immediately East of Tamnamore Substation and C.260m SW of 167 Ballynakilly Road Coalisland

This record has no verified map location.

View council map

Documents 4 of 4

DocumentPublishedAction
STAMPED APPROVED PLANSDrawings accompanying a Decision · PDF1 Jul 2024View
APPROVAL - CLUD PROPOSEDDecision- CLUD Proposed · PDF1 Jul 2024View
DELEGATED REPORT (DEL)Report · PDF1 Jul 2024View
APPLICATION FORMApplication Form · PDF3 May 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permission Granted
STAMPED APPROVED PLANS APPROVAL - CLUD PROPOSED
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.