Council planning record

Discharge of Conditions Application for DC/24/04045 - Conditions 6 (Sustainability Measures), 10 (Access Surfacing), 13 (EV Charging), 14 (Cycle Storage), 15 (Access Surface Water), 16 (Refuse and Recycling Bins), 17 (Foul Drainage Scheme), 20 (Biodiversity Enhancement Layout) and 21 (Wildlife Sensitive Design Scheme).

Two Fields Farm Low Road Debenham Stowmarket Suffolk IP14 6BJ

DecidedReference: DC/26/00760Mid Suffolk District Council

Last published check: 8 Oct 2026, 21:01. Check the council record for more recent changes.

Application location

Two Fields Farm Low Road Debenham Stowmarket Suffolk IP14 6BJ

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Discharge of Condition(s)
Received
25 Feb 2026
Validated
27 Feb 2026
Determination deadline
24 Apr 2026
Local authority
Mid Suffolk District Council

Application overview

Discharge of Conditions Application for DC/24/04045 - Conditions 6 (Sustainability Measures), 10 (Access Surfacing), 13 (EV Charging), 14 (Cycle Storage), 15 (Access Surface Water), 16 (Refuse and Recycling Bins), 17 (Foul Drainage Scheme), 20 (Biodiversity Enhancement Layout) and 21 (Wildlife Sensitive Design Scheme).

Proposal details

Reference
DC/26/00760
Alternative references
PP-14711999
Ward
Debenham
Parish
Debenham
Agent
Wellspring Architecture Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 25 of 25

DocumentPublishedAction
DISCHARGE OF CONDITION(S) - SPLITDecision · PDF24 Apr 2026View
HIGHWAYS RESPONSEConsultee Comment · PDF16 Apr 2026View
ECOLOGY COMMENTSConsultee Comment · PDF15 Apr 2026View
LIGHTING DESIGN STRATEGY AND BIODIVERSITY ENHANCEMENT REPORTReport · PDF31 Mar 2026View
EMAIL FROM AGENT ADDRESSING CONSULTEE CONCERNSCorrespondence · PDF31 Mar 2026View
CLIMATE CHANGE AND SUSTAINABILTY TEAM (ECOLYTIK) RESPONSEConsultee Comment · PDF31 Mar 2026View
ECOLOGY COMMENTSConsultee Comment · PDF30 Mar 2026View
21001-005-H SITE PLAN AS PROPOSEDDrawing Amended · PDF30 Mar 2026View
THE WATER EFFICIENCY CALCULATOR FOR NEW DWELLINGSAdditional Information · PDF30 Mar 2026View
RAINWATER HARVESTING CALCULATION 1Additional Information30 Mar 2026View
RAINWATER HARVESTING CALCULATION 2Additional Information30 Mar 2026View
BUILDING REGULATIONS COMPLIANCE REPORTReport · PDF30 Mar 2026View
EMAIL FROM AGENTCorrespondence · PDF30 Mar 2026View
CLIMATE CHANGE AND SUSTAINABILITY (ECOLYTIK) RESPONSEConsultee Comment · PDF30 Mar 2026View
CLIMATE CHANGE AND SUSTAINABILITY (ECOLYTIK) RESPONSEConsultee Comment · PDF16 Mar 2026View
ENV RESPONSE NOISE ODOUR LIGHT AND SMOKEConsultee Comment · PDF2 Mar 2026View
DC/24/04045 DECISION NOTICEAdditional Information · PDF27 Feb 2026View
APPLICATION FORMApplication Form · PDF25 Feb 2026View
LIGHTING DESIGN STRATEGY AND BIODIVERSITY ENHANCEMENT FEB 2026Additional Information · PDF25 Feb 2026View
WATER EFFICIENCY CALCULATION 260202Additional Information · PDF25 Feb 2026View
21001-102-K GROUND FLOOR PLANDrawing · PDF25 Feb 2026View
21001-105-B ACCESS PLANDrawing · PDF25 Feb 2026View
SUDS DRAINAGE STATEMENT WITH APPENDICESReport · PDF25 Feb 2026View
25341-001B DRAINAGE LAYOUTDrawing · PDF25 Feb 2026View
BREL COMPLIANCE REPORTSAdditional Information · PDF25 Feb 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Decision Made Date

    Published milestoneCouncil source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Part Granted/Part Refused
DISCHARGE OF CONDITION(S) - SPLIT DC/24/04045 DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.