Approval of Details reserved by Requirement 22 (Amendments to Approved Details) of the pursuant to The Progress Power (Gas Fired Power Station) Order 2015 -The submission concerns six requested alterations:1. Gas Receiving and Metering Station (GRMS); increase in height from 5m to 6m (with a single item up to 7m) and minor increase in length;2. Exhaust Stack; increase in width and length for lower section of stack (up to 16.5m above datum);3. Portable Control Container (PCC); increase in width and length;4. Fin/Fan cooler; increase in width and length;5. Combined Water Storage tank and Fire Water Storage Tank; increase in diameter and height;6 Modifications to the cross-section of the landscaping earth berms and addition of a berm on the Eastern side of the site
Progress Power Ltd Potash Lane Eye Suffolk IP23 7HE
Approval of Details reserved by Requirement 22 (Amendments to Approved Details) of the pursuant to The Progress Power (Gas Fired Power Station) Order 2015 -The submission concerns six requested alterations:1. Gas Receiving and Metering Station (GRMS); increase in height from 5m to 6m (with a single item up to 7m) and minor increase in length;2. Exhaust Stack; increase in width and length for lower section of stack (up to 16.5m above datum);3. Portable Control Container (PCC); increase in width and length;4. Fin/Fan cooler; increase in width and length;5. Combined Water Storage tank and Fire Water Storage Tank; increase in diameter and height;6 Modifications to the cross-section of the landscaping earth berms and addition of a berm on the Eastern side of the site
Reference
DC/23/03439
Ward
Eye
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.