Council planning record

Discharge condition 6 (Tree Protection), condition 10 (Surface Water Drainage Scheme), condition 11 (Land Contamination Phase 2 Site Investigation and Risk Assessment), and condition 12 (Remediation Method Statement) attached to planning permission ref.20/00470/OUT for the erection of up to 90 dwellings.

Land Adj Crompton Road Crompton Road Asfordby Hill

DecidedReference: 23/01082/DISMelton Borough Council

Last published check: 28 Sept 2026, 15:55. Check the council record for more recent changes.

Application location

Land Adj Crompton Road Crompton Road Asfordby Hill

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Discharge of Conditions
Received
20 Nov 2023
Validated
23 Nov 2023
Determination deadline
18 Jan 2024
Local authority
Melton Borough Council

Application overview

Discharge condition 6 (Tree Protection), condition 10 (Surface Water Drainage Scheme), condition 11 (Land Contamination Phase 2 Site Investigation and Risk Assessment), and condition 12 (Remediation Method Statement) attached to planning permission ref.20/00470/OUT for the erection of up to 90 dwellings.

Proposal details

Reference
23/01082/DIS
Alternative references
PP-12594607
Ward
Asfordby
Parish
Asfordby
Agent
Avant Homes Midlands

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 48 of 48

DocumentPublishedAction
Decision notice 17.09.2024Decision · PDF17 Sept 2024View
Mbc environmental health officer comments, 30.07.2024Consultation replies · PDF30 Jul 2024View
Decision 12.07.2024Decision · PDF12 Jul 2024View
Llfa comments, 21.06.2024Consultation replies · PDF21 Jun 2024View
decision noticeDecision · PDF6 Jun 2024View
Amended - drainage area plan storm 03.06.24Forms and plans · PDF3 Jun 2024View
Amended sw calculations v11- 2 and 30 year + 105 uc storm events 03.06.24Forms and plans · PDF3 Jun 2024View
Amended sw calculations v11 - 100 year +40% cc uc storm events 03.06.24Forms and plans · PDF3 Jun 2024View
Llfa comments, 15.05.2024Consultation replies · PDF15 May 2024View
Section 104 plan e282-70-01 rev f 30.04.2024Forms and plans · PDF30 Apr 2024View
Surface water maintenance plan 30.04.2024Application Documents · PDF30 Apr 2024View
Surface water management and construction strategy 30.04.2024Application Documents · PDF30 Apr 2024View
Hydro brake optimum she-0081-4000-2100-4000 30.04.2024Forms and plans · PDF30 Apr 2024View
Llfa comments 30.04.2024Application Documents · PDF30 Apr 2024View
Design settings 30.04.2024Application Documents · PDF30 Apr 2024View
Design settings 30.04.2024Application Documents · PDF30 Apr 2024View
Hydro brake optimum she-0121-7800-1600-7800 30.04.2024Forms and plans · PDF30 Apr 2024View
Llfa comments, 03.04.2024Consultation replies · PDF3 Apr 2024View
Control chamber details 21.03.2024Forms and plans · PDF21 Mar 2024View
Control chamber details 21.03.2024Forms and plans · PDF21 Mar 2024View
Hydro brake detail 21.03.2024Forms and plans · PDF21 Mar 2024View
Basin sections 21.03.2024Forms and plans · PDF21 Mar 2024View
Llfa response 21.03.2024Application Documents · PDF21 Mar 2024View
Manhole schedule 21.03.2024Forms and plans · PDF21 Mar 2024View
Headwall details 21.03.2024Forms and plans · PDF21 Mar 2024View
Manhole schedule 21.03.2024Forms and plans · PDF21 Mar 2024View
Headwall details 21.03.2024Forms and plans · PDF21 Mar 2024View
Headwall details 21.03.2024Forms and plans · PDF21 Mar 2024View
Landscape management plan 21.03.2024Application Documents · PDF21 Mar 2024View
Hydro brake tech spec 21.03.2024Forms and plans · PDF21 Mar 2024View
Hydro brake tech spec 21.03.2024Forms and plans · PDF21 Mar 2024View
Engineering layout 21.03.2024Forms and plans · PDF21 Mar 2024View
Hydro brake tech spec 21.03.2024Forms and plans · PDF21 Mar 2024View
Hydro brake tech spec 21.03.2024Forms and plans · PDF21 Mar 2024View
Construction management plan 26.02.2024Forms and plans · PDF26 Feb 2024View
Lcc forestry comments 12.02.2024Consultation replies · PDF12 Feb 2024View
Lead flood officer comments 08.02.2024Consultation replies · PDF8 Feb 2024View
Application form - without personal dataForms and plans · PDF20 Nov 2023View
Remediation strategy 20.11.23Application Documents · PDF20 Nov 2023View
Phase 2 geo-environmental site assessment 20.11.23Application Documents · PDF20 Nov 2023View
Drainage area plan storm 20.11.23Forms and plans · PDF20 Nov 2023View
Drainage area plan gully 20.11.23Forms and plans · PDF20 Nov 2023View
Overland floor routing 20.11.23Forms and plans · PDF20 Nov 2023View
Surface water management and construction strategy 20.11.23Application Documents · PDF20 Nov 2023View
Arboricultural impact assessment 20.11.23Application Documents · PDF20 Nov 2023View
Tree protection plan 20.11.23Forms and plans · PDF20 Nov 2023View
Tree survey 20.11.23Application Documents · PDF20 Nov 2023View
Covering letter 20.11.23Application Documents · PDF20 Nov 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Standard Consultation Date

    Published milestoneCouncil source
  5. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Decision Issued Date

    Published milestoneCouncil source
  8. Decision Made Date

    Published milestoneCouncil source
  9. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
Decision notice 17.09.2024 Decision 12.07.2024 decision notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.