Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
The Brook Theatre Old Town Hall The Brook Chatham Medway ME4 4SE
Last published check: 14 Oct 2026, 23:05. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceDetails pursuant to conditions 4d (alterations to existing decorative metalwork), 4e (alterations to windows), 4f (new or replacement pavement lights), 4h (details for the extension to proposed fire escape at roof level), 11 (basement repairs to brickwork) and 28d (Details of the alterations to form the new fire exits to the Main Auditorium and Studio Theatre) on planning permission MC/24/0336 - Listed Building Consent for the refurbishment and upgrading of Brook Theatre, including structural repairs and fire safety works
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsThe Brook Theatre Old Town Hall The Brook Chatham Medway ME4 4SE
This record has no verified map location.
View council map| Document | Published | Action |
|---|---|---|
| DECISION NOTICEDecision Notice · PDF | 14 Jul 2025 | View |
| REDACTEDApplication Form · PDF | 13 Jun 2025 | View |
| CAST IRON PAVEMENT LIGHT SECTIONS DETAILS AND PLANDrawings · PDF | 13 Jun 2025 | View |
| THEATRE STUDIO NEW ROOM SECTIONS AND PLAN VIEWSDrawings · PDF | 13 Jun 2025 | View |
| MAIN THEATRE NEW STAIR LOBBY ROOM SECTIONS AND PLAN VIEWSDrawings · PDF | 13 Jun 2025 | View |
| MAIN THEATRE NEW STAIR LOBBY ROOM 2 SECTIONS AND PLAN VIEWDrawings · PDF | 13 Jun 2025 | View |
| TYPICAL OPENABLE METAL GATE DETAILSDrawings · PDF | 13 Jun 2025 | View |
| STUDIO THEATRE NEW BACK ROOM DETAILS OF EXITING CORRIDOR AND INTERNAL WALL HEADDrawings · PDF | 13 Jun 2025 | View |
| MAIN THEATRE NEW STAIR LOBBY ROOM SECTIONS AND PLANS VIEWDrawings · PDF | 13 Jun 2025 | View |
| 34012 - BASEMENT REPOINTING WORKS METHOD STATEMENTSupporting Documents · PDF | 12 Jun 2025 | View |
| BRK-BPC-01-02-D-A-2101 LEVEL 2 LINK CORRIDOR SECTIONDrawings · PDF | 12 Jun 2025 | View |
| BRK-BPC-01-02-D-A-2102 LEVEL 2 LINK CORRIDOR DETAILSDrawings · PDF | 12 Jun 2025 | View |
| BRK-BPC-01-02-D-A-2104 DOOR HEAD DETAIL NEW DOOR EXISTING STAIR CORE TO LINK CORDrawings · PDF | 12 Jun 2025 | View |
| BRK-BPC-01-02-D-A-2108 PROPOSED LIFT SHAFT ROOF - 2F EXISTING ROOF CONNECTION TODrawings · PDF | 12 Jun 2025 | View |
| BRK-BPC-01-02-D-A-2111 LEVEL 2 LINK CORRIDOR DETAILDrawings · PDF | 12 Jun 2025 | View |
| BRK-BPC-01-B1-D-A-3250 TYPICAL BASEMENT WINDOW WITH PROTECTIVE ORNATE METAL GRILDrawings · PDF | 12 Jun 2025 | View |
| BRK-BPC-01-B1-D-A-3251 TYPICAL BASEMENT VENT WINDOWDrawings · PDF | 12 Jun 2025 | View |
| BRK-BPC-01-ZZ-D-A-2150 EXTERNAL WALL DETAILS 01Drawings · PDF | 12 Jun 2025 | View |
| BRK-BPC-01-02-D-A-2103 CORRIDOR SECTION DETAILS OF FLOOR BUILD UPDrawings · PDF | 12 Jun 2025 | View |
| 34012-BPC-XX-XX-LE-T-0001-COVER LETTER - 2025.06.12Supporting Documents · PDF | 12 Jun 2025 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.