Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Strood Civic Centre Rochester ME2 4AU
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceDemolition of the existing CCTV Building and other ancillary buildings on site and construction of residential units inclusive of a live/work unit (Use Class F1 or Class E) , cafe/bar (Use Class Eb), public open space, earthworks including flood defences, landscaping, drainage and associated infrastructure.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsStrood Civic Centre Rochester ME2 4AU
This record has no verified map location.
View council map| Document | Published | Action |
|---|---|---|
| Committee ReportCommittee Report | 23 Oct 2025 | View |
| FULL APPROVAL WITH CONDITIONSDecision Notice · PDF | 23 Oct 2025 | View |
| BLOCK 3 - ELEVATIONS (SHEET 1 OF 2)Drawings · PDF | 3 Dec 2024 | View |
| BLOCK 3 - ELEVATIONS (SHEET 2 OF 2)Drawings · PDF | 3 Dec 2024 | View |
| BLOCK 4 - ELEVATIONS (SHEET 1 OF 2)Drawings · PDF | 3 Dec 2024 | View |
| BLOCK 4 - ELEVATIONS (SHEET 2 OF 2)Drawings · PDF | 3 Dec 2024 | View |
| BLOCK 3 - GROUND FLOOR PLANDrawings · PDF | 3 Dec 2024 | View |
| BLOCK 3 - ROOF PLANDrawings · PDF | 3 Dec 2024 | View |
| BLOCK 3 - FIRST & TYPICAL FLOOR PLANSDrawings · PDF | 3 Dec 2024 | View |
| BLOCK 4 - GROUND & TYPICAL FLOOR PLANSDrawings · PDF | 3 Dec 2024 | View |
| BLOCK 4 - THIRD & ROOF FLOOR PLANSDrawings · PDF | 3 Dec 2024 | View |
| LANDSCAPE GENERAL ARRANGEMENT PLAN (SHEET 1 OF 4)Drawings · PDF | 3 Dec 2024 | View |
| LANDSCAPE LEVELS STRATEGY PLANDrawings · PDF | 3 Dec 2024 | View |
| PROPOSED LEVELSDrawings · PDF | 3 Dec 2024 | View |
| ACCOMMODATION SCHEDULESupporting Documents · PDF | 3 Dec 2024 | View |
| PLOT SCHEDULESupporting Documents · PDF | 3 Dec 2024 | View |
| GROUND FLOOR - SITE LAYOUTDrawings · PDF | 3 Dec 2024 | View |
| FIRST FLOOR - SITE LAYOUTDrawings · PDF | 3 Dec 2024 | View |
| SECOND FLOOR - SITE LAYOUTDrawings · PDF | 3 Dec 2024 | View |
| THIRD FLOOR - SITE LAYOUTDrawings · PDF | 3 Dec 2024 | View |
| ROOF PLAN - SITE LAYOUTDrawings · PDF | 3 Dec 2024 | View |
| SITE LAYOUT USESDrawings · PDF | 3 Dec 2024 | View |
| UNIT TYPEDrawings · PDF | 3 Dec 2024 | View |
| ACCESSIBILITYDrawings · PDF | 3 Dec 2024 | View |
| TENUREDrawings · PDF | 3 Dec 2024 | View |
| BUILDING HEIGHTDrawings · PDF | 3 Dec 2024 | View |
| MATERIALITYDrawings · PDF | 3 Dec 2024 | View |
| PARKINGDrawings · PDF | 3 Dec 2024 | View |
| CYCLE PARKINGDrawings · PDF | 3 Dec 2024 | View |
| REFUSEDrawings · PDF | 3 Dec 2024 | View |
| STREET ELEVATIONS (SHEET 1 OF 4)Drawings · PDF | 3 Dec 2024 | View |
| LETTER FROM MDC ON AFFORDABLE HOUSINGSupporting Documents | 20 Nov 2024 | View |
| AFFORDABLE HOUSING LETTER FROM AGENTSupporting Documents | 12 Nov 2024 | View |
| PROPOSED SITE PLANDrawings · PDF | 4 Nov 2024 | View |
| PROPOSED DRAINAGEDrawings · PDF | 4 Nov 2024 | View |
| CARPORT PLANS & ELEVATIONSDrawings · PDF | 31 Oct 2024 | View |
| LANDSCAPE GENERAL ARRANGEMENT PLANDrawings · PDF | 31 Oct 2024 | View |
| PUMP HOUSE FLOOR PLANSDrawings · PDF | 31 Oct 2024 | View |
| PUMP HOUSE ELEVATIONSDrawings · PDF | 31 Oct 2024 | View |
| STREET ELEVATIONS SHEET 1Drawings · PDF | 31 Oct 2024 | View |
| STREET ELEVATIONS SHEET 2Drawings · PDF | 31 Oct 2024 | View |
| STREET ELEVATIONS SHEET 3Drawings · PDF | 31 Oct 2024 | View |
| STREET ELEVATIONS SHEET 4Drawings · PDF | 31 Oct 2024 | View |
| GROUND FLOOR SITE LAYOUTDrawings · PDF | 31 Oct 2024 | View |
| SITE LOCATION PLANDrawings · PDF | 31 Oct 2024 | View |
| EXISTING SITE PLANDrawings · PDF | 31 Oct 2024 | View |
| SITE LAYOUT USESDrawings · PDF | 31 Oct 2024 | View |
| BLOCK 1 - ELEVATIONS (SHEET 1 OF 2Drawings · PDF | 31 Oct 2024 | View |
| BLOCK 1 - ELEVATIONS (SHEET 2 OF 2)Drawings · PDF | 31 Oct 2024 | View |
| BLOCK 2 - ELEVATIONS (SHEET 1 OF 2)Drawings · PDF | 31 Oct 2024 | View |
| BLOCK 2 - ELEVATIONS (SHEET 2 OF 2)Drawings · PDF | 31 Oct 2024 | View |
| BLOCK 5 - ELEVATIONS (SHEET 1 OF 2Drawings · PDF | 31 Oct 2024 | View |
| BLOCK 5 - ELEVATIONS (SHEET 2 OF 2)Drawings · PDF | 31 Oct 2024 | View |
| BLOCK 6 - ELEVATIONS (SHEET 1 OF 2)Drawings · PDF | 31 Oct 2024 | View |
| BLOCK 6 - ELEVATIONS (SHEET 2 OF 2)Drawings · PDF | 31 Oct 2024 | View |
| BLOCK 7 - ELEVATIONS (SHEET 1 OF 3)Drawings · PDF | 31 Oct 2024 | View |
| (SHEET 2 OF 3)Drawings · PDF | 31 Oct 2024 | View |
| BLOCK 7 - ELEVATIONS (SHEET 3 OF 3)Drawings · PDF | 31 Oct 2024 | View |
| BLOCK 14 - ELEVATIONS (SHEET 1 OF 2)Drawings · PDF | 31 Oct 2024 | View |
| BLOCK 14 - ELEVATIONS (SHEET 2 OF 2)Drawings · PDF | 31 Oct 2024 | View |
| BLOCK 8-12 - ELEVATIONS (SHEET 1 OF 4)Drawings · PDF | 31 Oct 2024 | View |
| BLOCK 8-12 - ELEVATIONS (SHEET 2 OF 4)Drawings · PDF | 31 Oct 2024 | View |
| BLOCK 8-12 - ELEVATIONS (SHEET 3 OF 4)Drawings · PDF | 31 Oct 2024 | View |
| BLOCK 8-12 - ELEVATIONS (SHEET 4 OF 4)Drawings · PDF | 31 Oct 2024 | View |
| BLOCK 13 - ELEVATIONSDrawings · PDF | 31 Oct 2024 | View |
| BLOCK 1 - GROUND & TYPICAL FLOOR PLANSDrawings · PDF | 31 Oct 2024 | View |
| BLOCK 1 - THIRD & ROOF FLOOR PLANS.Drawings · PDF | 31 Oct 2024 | View |
| BLOCK 2 - GROUND FLOOR PLANDrawings · PDF | 31 Oct 2024 | View |
| BLOCK 2 - TYPICAL FLOOR PLANDrawings · PDF | 31 Oct 2024 | View |
| BLOCK 2 - ROOF PLANDrawings · PDF | 31 Oct 2024 | View |
| BLOCK 5 - GROUND & TYPICAL FLOOR PLANDrawings · PDF | 31 Oct 2024 | View |
| BLOCK 5 - THIRD & ROOF PLANDrawings · PDF | 31 Oct 2024 | View |
| BLOCK 6 - GROUND & TYPICAL FLOOR PLANSDrawings · PDF | 31 Oct 2024 | View |
| BLOCK 6 - THIRD & ROOF FLOOR PLANSDrawings · PDF | 31 Oct 2024 | View |
| BLOCK 7 - GROUND FLOOR PLANDrawings · PDF | 31 Oct 2024 | View |
| BLOCK 7 - THIRD FLOOR PLANDrawings · PDF | 31 Oct 2024 | View |
| BLOCK 7 - ROOF PLANDrawings · PDF | 31 Oct 2024 | View |
| BLOCK 7 - TYPICAL FLOOR PLADrawings · PDF | 31 Oct 2024 | View |
| BLOCK 13 - FLOOR PLANSDrawings · PDF | 31 Oct 2024 | View |
| BLOCK 14 - GROUND & TYPICAL FLOOR PLANDrawings · PDF | 31 Oct 2024 | View |
| BLOCK 14 - ROOF PLANDrawings · PDF | 31 Oct 2024 | View |
| BLOCK 8-12 - GROUND FLOOR PLANDrawings · PDF | 31 Oct 2024 | View |
| STCC-BPTW-ZZ-01-DR-A-1020-C03-A3Drawings · PDF | 31 Oct 2024 | View |
| BLOCK 8-12 - SECOND FLOOR PLANDrawings · PDF | 31 Oct 2024 | View |
| BLOCK 8-12 - THIRD FLOOR PLANDrawings · PDF | 31 Oct 2024 | View |
| BLOCK 8-12 - ROOF PLANDrawings · PDF | 31 Oct 2024 | View |
| FLAT BLOCK SECTIONDrawings · PDF | 31 Oct 2024 | View |
| FLAT BLOCK SECTION WITH LOUVRED VENTILATIONDrawings · PDF | 31 Oct 2024 | View |
| FLAT BLOCK SECTION OF CAFE SPACEDrawings · PDF | 31 Oct 2024 | View |
| FLAT BLOCK SECTION WITH LIVE-WORK SPACEDrawings · PDF | 31 Oct 2024 | View |
| T01-T02_HT01 SECTIONDrawings · PDF | 31 Oct 2024 | View |
| T04-T05-T08_HT07 SECTIONDrawings · PDF | 31 Oct 2024 | View |
| T03-T06-T07_HT05 SECTIONDrawings · PDF | 31 Oct 2024 | View |
| T15-T16-T17-T18-T19-T20-T21_HT09 SECTIONDrawings · PDF | 31 Oct 2024 | View |
| Supporting DocumentsSupporting Documents | 31 Oct 2024 | View |
| T01_HT01_HT02 - ELEVATIONSDrawings · PDF | 31 Oct 2024 | View |
| T02_HT01_HT02 - ELEVATIONSDrawings · PDF | 31 Oct 2024 | View |
| T03_HT04 - ELEVATIONSDrawings · PDF | 31 Oct 2024 | View |
| T04-T05-T08_HT07 - ELEVATIONSDrawings · PDF | 31 Oct 2024 | View |
| T06-T07_HT05 - ELEVATIONSDrawings · PDF | 31 Oct 2024 | View |
| T12-T14_HT10 - ELEVATIONDrawings · PDF | 31 Oct 2024 | View |
| T13_HT10 - ELEVATIONSDrawings · PDF | 31 Oct 2024 | View |
| T15-T16-T17_HT09 - ELEVATIONSDrawings · PDF | 31 Oct 2024 | View |
| T18_HT09 - ELEVATIONSDrawings · PDF | 31 Oct 2024 | View |
| T19_HT09 - ELEVATIONSDrawings · PDF | 31 Oct 2024 | View |
| T20-T21_HT09 - ELEVATIONSDrawings · PDF | 31 Oct 2024 | View |
| T01_HT01_HT02 - GROUND & FIRST FLOOR PLANSDrawings · PDF | 31 Oct 2024 | View |
| T01_HT01_HT02 - SECOND & ROOF FLOOR PLANSDrawings · PDF | 31 Oct 2024 | View |
| T02_HT01_HT02 - GROUND & FIRST FLOOR PLANSDrawings · PDF | 31 Oct 2024 | View |
| T02_HT01_HT02 - SECOND & ROOF FLOOR PLANSDrawings · PDF | 31 Oct 2024 | View |
| T03_HT04 - FLOOR PLANSDrawings · PDF | 31 Oct 2024 | View |
| T04-T05-T08_HT07 - FLOOR PLANSDrawings · PDF | 31 Oct 2024 | View |
| T06-T07_HT05 - FLOOR PLANSDrawings · PDF | 31 Oct 2024 | View |
| T12-T14_HT10 - FLOOR PLANSDrawings · PDF | 31 Oct 2024 | View |
| T13_HT10 - FLOOR PLANSDrawings · PDF | 31 Oct 2024 | View |
| T15-T16-T17_HT09 - FLOOR PLANSDrawings · PDF | 31 Oct 2024 | View |
| T18_HT09 - GROUND & FIRST FLOOR PLANSDrawings · PDF | 31 Oct 2024 | View |
| T18_HT09 - SECOND & ROOF FLOOR PLANSDrawings · PDF | 31 Oct 2024 | View |
| T19_HT09 - FLOOR PLANSDrawings · PDF | 31 Oct 2024 | View |
| T20-T21_HT09 - FLOOR PLANSDrawings · PDF | 31 Oct 2024 | View |
| PLANNING RESUBMISSION DESIGN ADDENDUMDrawings · PDF | 31 Oct 2024 | View |
| COVER LETTERSupporting Documents · PDF | 1 Oct 2024 | View |
| AFFORDABLE HOUSING LETTERSupporting Documents · PDF | 10 Sept 2024 | View |
| BLOCK 5 - GROUND & TYPICAL FLOOR PLANDrawings · PDF | 14 Aug 2024 | View |
| ARCHAEOLOGICAL STRIP MAP AND SAMPLESupporting Documents · PDF | 12 Aug 2024 | View |
| WRITTEN SCHEME OF INVESTIGATION FOR A GEOARCHAEOLOGICAL BOREHOLE EVALUATIONSupporting Documents · PDF | 12 Aug 2024 | View |
| PLANNING RE-SUBMISSION DESIGN ADDENDUM - HRSupporting Documents · PDF | 12 Aug 2024 | View |
| PLANNING RESUBMISSION DESIGN ADDENDUM - LRSupporting Documents · PDF | 12 Aug 2024 | View |
| STROOD RMA AND ENABLING WORKS - ISSUE 13Supporting Documents · PDF | 12 Aug 2024 | View |
| SUPERSEDED -PROPOSED DRAINAGESuperseded · PDF | 12 Aug 2024 | View |
| FLOOD RISK ASSESSMENT & DRAINAGE STRATEGYSupporting Documents · PDF | 12 Aug 2024 | View |
| SUPERSEDED -PROPOSED SITE PLANSuperseded · PDF | 12 Aug 2024 | View |
| BAT NOCTURNAL SURVEYS REPORTSupporting Documents · PDF | 12 Aug 2024 | View |
| MARINE CONSERVATION ZONE ASSESSMENTSupporting Documents · PDF | 12 Aug 2024 | View |
| REPTILE SURVEYSupporting Documents · PDF | 12 Aug 2024 | View |
| PHASE 1 HABITAT PLAN V5Drawings | 12 Aug 2024 | View |
| UK HABITAT CLASSIFICATIONDrawings | 12 Aug 2024 | View |
| LANDSCAPE GENERAL ARRANGEMENT PLAN (SHEET 2 OF 4)Drawings · PDF | 12 Aug 2024 | View |
| LANDSCAPE GENERAL ARRANGEMENT PLAN (SHEET 3 OF 4)Drawings · PDF | 12 Aug 2024 | View |
| TRANSPORT TECHNICAL NOTESupporting Documents · PDF | 12 Aug 2024 | View |
| VEHICLE SWEPT PATH ANALYSIS 11.4M REFUSEDrawings · PDF | 12 Aug 2024 | View |
| VEHICLE SWEPT PATH ANALYSIS PANTECHNICONDrawings · PDF | 12 Aug 2024 | View |
| VEHICLE SWEPT PATH ANALYSIS FIRE TENDERDrawings · PDF | 12 Aug 2024 | View |
| VEHICLE SWEPT PATH ANALYSIS ESTATE CAR & AMBULANCEDrawings · PDF | 12 Aug 2024 | View |
| CARPORT PLANS & ELEVATIONSDrawings · PDF | 12 Aug 2024 | View |
| PUMP HOUSE - FLOOR PLANSDrawings · PDF | 12 Aug 2024 | View |
| PUMP HOUSE - ELEVATIONSDrawings · PDF | 12 Aug 2024 | View |
| FLAT BLOCK - SECTIONDrawings · PDF | 12 Aug 2024 | View |
| FLAT BLOCK - SECTION WITH LOUVRED VENTILATIONDrawings · PDF | 12 Aug 2024 | View |
| FLAT BLOCK - SECTION OF CAFE SPACEDrawings · PDF | 12 Aug 2024 | View |
| FLAT BLOCK - SECTION OF LIVE/WORK SPACEDrawings · PDF | 12 Aug 2024 | View |
| T01 & T02 SECTIONDrawings · PDF | 12 Aug 2024 | View |
| T04, T05, T08, T09, T12, T13 & T14 SECTIONDrawings · PDF | 12 Aug 2024 | View |
| T03, T06, T07, T10 & T11 SECTIONDrawings · PDF | 12 Aug 2024 | View |
| T15, T16, T17, T18, T19, T20, T21 SECTIONDrawings · PDF | 12 Aug 2024 | View |
| BLOCK 13 - ELEVATIONSDrawings · PDF | 12 Aug 2024 | View |
| BLOCK 1 - GROUND & TROPICAL FLOOR PLANSDrawings · PDF | 12 Aug 2024 | View |
| BLOCK 1 - THIRD & ROOF FLOOR PLANSDrawings · PDF | 12 Aug 2024 | View |
| BLOCK 2 - GROUND FLOOR PLANDrawings · PDF | 12 Aug 2024 | View |
| BLOCK 2 - TYPICAL FLOOR PLANDrawings · PDF | 12 Aug 2024 | View |
| BLOCK 2 - ROOF PLANDrawings · PDF | 12 Aug 2024 | View |
| BLOCK 4 - GROUND & TYPICAL FLOOR PLANSDrawings · PDF | 12 Aug 2024 | View |
| BLOCK 5 - THIRD & ROOF PLANDrawings · PDF | 12 Aug 2024 | View |
| BLOCK 6 - GROUND & TYPICAL FLOOR PLANSDrawings · PDF | 12 Aug 2024 | View |
| BLOCK 6 - THIRD & ROOF FLOOR PLANSDrawings · PDF | 12 Aug 2024 | View |
| BLOCK 7 - GROUND FLOOR PLANDrawings · PDF | 12 Aug 2024 | View |
| BLOCK 7 - THIRD FLOOR PLANDrawings · PDF | 12 Aug 2024 | View |
| BLOCK 7 - ROOF PLANDrawings · PDF | 12 Aug 2024 | View |
| BLOCK 7 - TYPICAL FLOOR PLANDrawings · PDF | 12 Aug 2024 | View |
| BLOCK 13 - FLOOR PLANSDrawings · PDF | 12 Aug 2024 | View |
| BLOCK 14 - GROUND & TYPICAL FLOOR PLANDrawings · PDF | 12 Aug 2024 | View |
| BLOCK 14 - ROOF PLANDrawings · PDF | 12 Aug 2024 | View |
| BLOCK 8-12 - GROUND FLOOR PLANDrawings · PDF | 12 Aug 2024 | View |
| BLOCK 8-12 - FIRST FLOOR PLANDrawings · PDF | 12 Aug 2024 | View |
| BLOCK 8-12 - SECOND FLOOR PLANDrawings · PDF | 12 Aug 2024 | View |
| BLOCK 8-12 - THIRD FLOOR PLANDrawings · PDF | 12 Aug 2024 | View |
| BLOCK 8-12 - ROOF PLANDrawings · PDF | 12 Aug 2024 | View |
| SITE LOCATION PLANDrawings · PDF | 12 Aug 2024 | View |
| STREET ELEVATIONS (SHEET 2 OF 4)Drawings · PDF | 12 Aug 2024 | View |
| STREET ELEVATIONS (SHEET 3 OF 4)Drawings · PDF | 12 Aug 2024 | View |
| STREET ELEVATIONS (SHEET 4 OF 4)Drawings · PDF | 12 Aug 2024 | View |
| TERRACE 1 - ELEVATIONSDrawings · PDF | 12 Aug 2024 | View |
| TERRACE 2 - ELEVATIONSDrawings · PDF | 12 Aug 2024 | View |
| T04, T05, T08 ELEVATIONSDrawings · PDF | 12 Aug 2024 | View |
| TERRACE 6 & 7 - ELEVATIONSDrawings · PDF | 12 Aug 2024 | View |
| TERRACE 12 & 14 - ELEVATIONSDrawings · PDF | 12 Aug 2024 | View |
| TERRACE 13 - ELEVATIONSDrawings · PDF | 12 Aug 2024 | View |
| TERRACE 15, 16 & 17 - ELEVATIONSDrawings · PDF | 12 Aug 2024 | View |
| T18 ELEVATIONSDrawings · PDF | 12 Aug 2024 | View |
| TERRACE 19 - ELEVATIONSDrawings · PDF | 12 Aug 2024 | View |
| TERRACE 20 & 21 - ELEVATIONSDrawings · PDF | 12 Aug 2024 | View |
| TERRACE 1 - SECOND FLOOR & ROOF PLANSDrawings · PDF | 12 Aug 2024 | View |
| TERRACE 2 - SECOND FLOOR & ROOF PLANDrawings · PDF | 12 Aug 2024 | View |
| TERRACE 3 - FLOOR PLANSDrawings · PDF | 12 Aug 2024 | View |
| T04, T05, T08 FLOOR PLANSDrawings · PDF | 12 Aug 2024 | View |
| TERRACE 6 & 7 - FLOOR PLANSDrawings · PDF | 12 Aug 2024 | View |
| TERRACE 12 & 14 - FLOOR PLANSDrawings · PDF | 12 Aug 2024 | View |
| TERRACE 13 - FLOOR PLANSDrawings · PDF | 12 Aug 2024 | View |
| TERRACE 15, 16 & 17 - FLOOR PLANSDrawings · PDF | 12 Aug 2024 | View |
| TERRACE 18 - GROUND AND FIRST FLOOR PLANSDrawings · PDF | 12 Aug 2024 | View |
| TERRACE 18 - SECOND FLOOR AND ROOF PLANSDrawings · PDF | 12 Aug 2024 | View |
| TERRACE 19 - FLOOR PLANSDrawings · PDF | 12 Aug 2024 | View |
| TERRACE 20 & 21 - FLOOR PLANSDrawings · PDF | 12 Aug 2024 | View |
| BLOCK 1 - ELEVATIONS (SHEET 1 OF 2)Drawings · PDF | 12 Aug 2024 | View |
| BLOCK 1 - ELEVATIONS (SHEET 2 OF 2)Drawings · PDF | 12 Aug 2024 | View |
| BLOCK 2 - ELEVATIONS (SHEET 1 OF 2)Drawings · PDF | 12 Aug 2024 | View |
| BLOCK 2 - ELEVATIONS (SHEET 2 OF 2)Drawings · PDF | 12 Aug 2024 | View |
| BLOCK 5 - ELEVATIONS (SHEET 1 OF 2)Drawings · PDF | 12 Aug 2024 | View |
| BLOCK 5 - ELEVATIONS (SHEET 2 OF 2)Drawings · PDF | 12 Aug 2024 | View |
| BLOCK 6 - ELEVATIONS (SHEET OF 2)Drawings · PDF | 12 Aug 2024 | View |
| BLOCK 6 - ELEVATIONS (SHEET 2 OF 2)Drawings · PDF | 12 Aug 2024 | View |
| BLOCK 7 - ELEVATIONS (SHEET 1 OF 3)Drawings · PDF | 12 Aug 2024 | View |
| BLOCK 7 - ELEVATIONS (SHEET 2 OF 3)Drawings · PDF | 12 Aug 2024 | View |
| BLOCK 7 - ELEVATIONS (SHEET 3 OF 3)Drawings · PDF | 12 Aug 2024 | View |
| BLOCK 14 - ELEVATIONS (SHEET 1 OF 2)Drawings · PDF | 12 Aug 2024 | View |
| BLOCK 14 - ELEVATIONS (SHEET 2 OF 2)Drawings · PDF | 12 Aug 2024 | View |
| TERRACE 1 - GROUND & FIRST FLOOR PLANSDrawings · PDF | 12 Aug 2024 | View |
| TERRACE 2 - GROUND & FIRST FLOOR PLANSDrawings · PDF | 12 Aug 2024 | View |
| BLOCK 8-12 - ELEVATIONS (SHEET 1 OF 4)Drawings · PDF | 12 Aug 2024 | View |
| BLOCK 8-12 - ELEVATIONS (SHEET 2 OF 4)Drawings · PDF | 12 Aug 2024 | View |
| BLOCK 8-12 - ELEVATIONS (SHEET 3 OF 4)Drawings · PDF | 12 Aug 2024 | View |
| BLOCK 8-12 - ELEVATIONS (SHEET 4 OF 4)Drawings · PDF | 12 Aug 2024 | View |
| FINANCIAL LIABILITY ASSESSMENTSupporting Documents | 3 May 2024 | View |
| RESIDENT LAND VALUE SPREAD SHEET BASE OPTIONSupporting Documents | 3 May 2024 | View |
| SCHEME VIABILITY APPRAISALSupporting Documents | 3 May 2024 | View |
| POTENTIAL SCHEMESupporting Documents | 3 May 2024 | View |
| BCIS STUDYSupporting Documents · PDF | 3 May 2024 | View |
| GROUND FLOOR SITE LAYOUTDrawings · PDF | 3 May 2024 | View |
| FINAL SUBMISSION DOC LISTSupporting Documents | 26 Apr 2024 | View |
| GEO-ENVIRONMENTAL ASSESSMENTSupporting Documents · PDF | 15 Apr 2024 | View |
| PART 1 6020B FORMER CIVIC SITE STROOD TVA V2Supporting Documents · PDF | 27 Mar 2024 | View |
| PART 2 6020B FORMER CIVIC SITE STROOD TVA V2Supporting Documents · PDF | 27 Mar 2024 | View |
| PLANNING STATEMENT FINALSupporting Documents · PDF | 25 Mar 2024 | View |
| PLANNING STATEMENT APPENDIX ASupporting Documents · PDF | 25 Mar 2024 | View |
| PRELIMINARY ECOLOGICAL APPRAISALSupporting Documents · PDF | 22 Mar 2024 | View |
| BLOCK 1- GROUND AND TYPICAL FLOOR PLANSDrawings · PDF | 22 Mar 2024 | View |
| BLOCK 1- THIRD AND ROOF PLANDrawings · PDF | 22 Mar 2024 | View |
| BLOCK 1- ELEVATIONSDrawings · PDF | 22 Mar 2024 | View |
| BLOCK 1- ELEVATIONSDrawings · PDF | 22 Mar 2024 | View |
| BLOCK 8-12-GROUND FLOOR PLANDrawings · PDF | 22 Mar 2024 | View |
| BLOCK 8-12-FIRST FLOOR PLANDrawings · PDF | 22 Mar 2024 | View |
| BLOCK 8-12-SECOND FLOOR PLANDrawings · PDF | 22 Mar 2024 | View |
| BLOCK 8-12- THIRD FLOOR PLANDrawings · PDF | 22 Mar 2024 | View |
| TERRACE 4 ELEVATIONSDrawings · PDF | 15 Mar 2024 | View |
| TERRACE 11 ELEVATIONSDrawings · PDF | 15 Mar 2024 | View |
| BLOCK 8 12- FIRST FLOOR PLANDrawings · PDF | 15 Mar 2024 | View |
| TERRACE 11 FLOOR PLANSDrawings · PDF | 15 Mar 2024 | View |
| DESIGN AND ACCESS STATEMENTSupporting Documents · PDF | 15 Mar 2024 | View |
| 3.5 CHARACTER AREA DASSupporting Documents · PDF | 15 Mar 2024 | View |
| 5.14 MATERIALS PALETTE DASSupporting Documents · PDF | 15 Mar 2024 | View |
| 7.11 LANDSCAPE STRATEGIES DASSupporting Documents · PDF | 15 Mar 2024 | View |
| T03 T06 T07 T10 T11 SECTIONDrawings · PDF | 15 Mar 2024 | View |
| ARCHAEOLOGICAL WATCHING BRIEFSupporting Documents · PDF | 4 Mar 2024 | View |
| GEOMODEL UPDATEDSupporting Documents · PDF | 4 Mar 2024 | View |
| ARCHEOLOGICAL DESK BASED ASSESSMENTSupporting Documents · PDF | 4 Mar 2024 | View |
| DETAILED RISK ASSESSMENT AND REMEDIAL METHOD STATEMENTSupporting Documents · PDF | 4 Mar 2024 | View |
| GEO-ENVIRONMENTAL ASSESSMENTSupporting Documents · PDF | 4 Mar 2024 | View |
| HERITAGE IMPACT ASSESSMENTSupporting Documents · PDF | 4 Mar 2024 | View |
| LANDSCAPE GENERAL ARRANGEMENT PLAN (SHEET 4 OF 4)Drawings · PDF | 4 Mar 2024 | View |
| EXISTING TOPOGRAPHYDrawings · PDF | 4 Mar 2024 | View |
| NOISE IMPACT ASSESSMENTSupporting Documents · PDF | 4 Mar 2024 | View |
| ENERGY & SUSTAINABILITY STATEMENTSupporting Documents · PDF | 4 Mar 2024 | View |
| TRANSPORT ASSESSMENT (PART 1)Supporting Documents · PDF | 4 Mar 2024 | View |
| TRANSPORT ASSESSMENT (PART 2)Supporting Documents · PDF | 4 Mar 2024 | View |
| INTERIM FRAMEWORK TRAVEL PLANSupporting Documents · PDF | 4 Mar 2024 | View |
| REDACTEDApplication Form · PDF | 9 Feb 2024 | View |
| PHOTOGRAPHDrawings · PDF | 9 Feb 2024 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.