WithdrawnCouncil status: Not published

Details pursuant to conditions 09, 10, 20, 28, 35, 36, 40, 41, 44, 47, 48, 49, 53, 54, 55, 62, 63, 68, 70, 76, 78, 79, 80, 83 & 90 on planning permission MC2007/0429 for Variation of condition 76 of planning permission MC2004/2030 which required the submission of a detailed strategy for a speed hierarchy of all distributor and access roads within the application site and which required means other than vertical deflection ("speed humps" etc) as the principal method of reducing vehicle speeds to a new condition requiring details of:-traffic calming at detailed stage for any phase or sub-phase of development -how the objectives of the Design Codes can be achieved and requiring developers to test the effectiveness of their traffic calming measures post implantation with a requirement to incorporate additional measures to reduce the measured 85th percentile speed to at or below the maximum detailed in the Design Codes if necessary

Land East Of London/Dover Railway Line Between The Railway Bridge Crossing The Medway And Doust Way Excluding 7-28 Castle View Business Park Acorn Shipyard And The PB Group Premises And Partly Fronting Corporation Street Rochester

Medway CouncilReference MC/10/3284Discharge Condition

Last published check: 1 Nov 2026, 07:35. Check the council record for more recent changes.

Status and dates

Last published check: 1 Nov 2026, 07:35 (UK)

  1. DoneReceived7 Sept 2010
  2. DoneValidated7 Sept 2010
  3. Not publishedConsultationNo date on council record
  4. Date set by councilAgreed decision date19 Oct 2010
  5. ClosedWithdrawnNot published

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (8)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Decision Made Date

    Published milestoneCouncil source
Application type
Discharge Condition
Documents
70 published

Proposal

Details pursuant to conditions 09, 10, 20, 28, 35, 36, 40, 41, 44, 47, 48, 49, 53, 54, 55, 62, 63, 68, 70, 76, 78, 79, 80, 83 & 90 on planning permission MC2007/0429 for Variation of condition 76 of planning permission MC2004/2030 which required the submission of a detailed strategy for a speed hierarchy of all distributor and access roads within the application site and which required means other than vertical deflection ("speed humps" etc) as the principal method of reducing vehicle speeds to a new condition requiring details of:-traffic calming at detailed stage for any phase or sub-phase of development -how the objectives of the Design Codes can be achieved and requiring developers to test the effectiveness of their traffic calming measures post implantation with a requirement to incorporate additional measures to reduce the measured 85th percentile speed to at or below the maximum detailed in the Design Codes if necessary

Reference
MC/10/3284
Agent
Planning Perspectives LLP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Application FormApplication Form28 Sept 2010View
  • ElevationsA3Drawings28 Sept 2010View
  • ElevationsA3Drawings28 Sept 2010View
  • Floor PlanA3Drawings28 Sept 2010View
  • Floor PlanA3Drawings28 Sept 2010View
  • Floor PlanA3Drawings28 Sept 2010View
  • Floor PlanA3Drawings28 Sept 2010View
  • Floor PlanA3Drawings28 Sept 2010View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Withdrawn by Applicant
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.