Status on council recordCouncil status: Not published
Liquid Natural Gas (LNG) importation storage, vaporisation and distribution facility, comprising; demolition of an existing jetty structure (Jetty 8) including stripping and removal of jetty approach walkway, cutting of jetty approach piles approximately 1m below current river bed level and removal of resulting piles; Construction of a new jetty (New Jetty 8) comprising equipment to unload LNG from ships, berthing and mooring dolphins, emergency walkways, a jetty approach to accommodate vehicular access, an instrument control room and appropriate emergency equipment; Construction of jetty approach consisting of a LNG pipe rack and vehicular access elevated above the existing Port Victoria Pier and sea wall. Existing internal access road extended to connect vehicular deck access via a deck access ramp; Reinstatement by dredging of existing berth box to accommodate LNG carriers; Erection of equipment landwards of the existing sea wall comprising a nitrogen generator, jetty control room, security gatehouse, diesel generator and electricity sub-station; Construction of pipeline to connect jetty head passing above the sea wall to the existing LNG transfer pipeline. This will comprise of (I) a LNG transfer pipeline; (II) a recirculation line; (III) a vapour return pipeline; (IV) horizontal expansion loops; (V) support structures in the form of trestles to carry the pipeline above the existing sea wall; (VI) a concrete channel containing the pipeline and running from the sea wall to the existing LNG transfer pipe; and (VII) a pipeline running from the jetty to a vent stack; Construction of two LNG storage tanks, each having a capacity of 190,000m3; Installation of six additional submerged combustion vaporisers; Provision of related infrastructure; Temporary lay down area in the northern and central zones
National Grid Property Holdings Limited Site Grain Road Isle Of Grain Rochester Kent
Liquid Natural Gas (LNG) importation storage, vaporisation and distribution facility, comprising; demolition of an existing jetty structure (Jetty 8) including stripping and removal of jetty approach walkway, cutting of jetty approach piles approximately 1m below current river bed level and removal of resulting piles; Construction of a new jetty (New Jetty 8) comprising equipment to unload LNG from ships, berthing and mooring dolphins, emergency walkways, a jetty approach to accommodate vehicular access, an instrument control room and appropriate emergency equipment; Construction of jetty approach consisting of a LNG pipe rack and vehicular access elevated above the existing Port Victoria Pier and sea wall. Existing internal access road extended to connect vehicular deck access via a deck access ramp; Reinstatement by dredging of existing berth box to accommodate LNG carriers; Erection of equipment landwards of the existing sea wall comprising a nitrogen generator, jetty control room, security gatehouse, diesel generator and electricity sub-station; Construction of pipeline to connect jetty head passing above the sea wall to the existing LNG transfer pipeline. This will comprise of (I) a LNG transfer pipeline; (II) a recirculation line; (III) a vapour return pipeline; (IV) horizontal expansion loops; (V) support structures in the form of trestles to carry the pipeline above the existing sea wall; (VI) a concrete channel containing the pipeline and running from the sea wall to the existing LNG transfer pipe; and (VII) a pipeline running from the jetty to a vent stack; Construction of two LNG storage tanks, each having a capacity of 190,000m3; Installation of six additional submerged combustion vaporisers; Provision of related infrastructure; Temporary lay down area in the northern and central zones
Reference
MC/06/1428
Alternative references
MC2006/1428
Parish
St James Isle Of Grain
Agent
Planning Perspectives
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.