Awaiting decisionCouncil status: Registered

DISCHARGE OF CONDITIONS 3 (STONEWORK SURVEY), 4 (RAILINGS REMOVAL AND MONUMENT REPAIR DETAILS) AND 5 (LIMESTONE WALL AND PAVING DETAILS) ON APPLICATION 2026/0305/LBW (LISTED BUILDING CONSENT FOR THE REMOVAL OF THE EXISTING METAL RAILINGS FIXED TO THE LOWEST STEP. FIXING POCKETS TO BE REVIEWED AFTER REMOVAL AND TO BE INFILLED WITH MOLTEN LEAD OR MATCHING STONE INDENTS. REMOVAL OF LIGHTING FIXED TO THE MONUMENT TO BE REPLACED WITH LIGHTING MOUNTED ON BOLLARDS ADJACENT TO THE MONUMENT. NEW RAILINGS SET AWAY FROM THE MONUMENT - METAL HERITAGE RAILINGS ON A STONE PLINTH TO MATCH THE MONUMENT. NEW SEATING, SOFT PLANTING AND HERITAGE INFORMATION BOARDS INSTALLED AROUND THE PERIMETER OF THE MEMORIAL.)

Bentinck Memorial Market Place Mansfield Nottinghamshire

Mansfield District CouncilReference 2026/0578/CONDischarge of Condition(s)

Last published check: 20 Nov 2026, 20:14. Check the council record for more recent changes.

Status and dates

Last published check: 20 Nov 2026, 20:14 (UK)

26days until target decision date21 Dec 2026

  1. DoneReceived23 Oct 2026
  2. DoneValidated26 Oct 2026
  3. ClosedConsultationEnded 18 Nov 2026
  4. Next date · in 26 daysTarget decision date21 Dec 2026
  5. Not yet publishedDecisionNo decision on council record

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (5)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Determination Deadline

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Discharge of Condition(s)
Ward
Central
Documents
6 published

Proposal

DISCHARGE OF CONDITIONS 3 (STONEWORK SURVEY), 4 (RAILINGS REMOVAL AND MONUMENT REPAIR DETAILS) AND 5 (LIMESTONE WALL AND PAVING DETAILS) ON APPLICATION 2026/0305/LBW (LISTED BUILDING CONSENT FOR THE REMOVAL OF THE EXISTING METAL RAILINGS FIXED TO THE LOWEST STEP. FIXING POCKETS TO BE REVIEWED AFTER REMOVAL AND TO BE INFILLED WITH MOLTEN LEAD OR MATCHING STONE INDENTS. REMOVAL OF LIGHTING FIXED TO THE MONUMENT TO BE REPLACED WITH LIGHTING MOUNTED ON BOLLARDS ADJACENT TO THE MONUMENT. NEW RAILINGS SET AWAY FROM THE MONUMENT - METAL HERITAGE RAILINGS ON A STONE PLINTH TO MATCH THE MONUMENT. NEW SEATING, SOFT PLANTING AND HERITAGE INFORMATION BOARDS INSTALLED AROUND THE PERIMETER OF THE MEMORIAL.)

Reference
2026/0578/CON
Alternative references
PP-15295041
Ward
Central
Agent
Aspbury Planning Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Application form - without personal dataAPPLICATION FORM23 Oct 2026View
  • Condition report and schedule of repairsSUPPORTING INFORMATION23 Oct 2026View
  • Bentinck memorial proposalDRAWING23 Oct 2026View
  • Bentinck memorial detail sectionsDRAWING23 Oct 2026View
  • Landscape nbsSUPPORTING INFORMATION23 Oct 2026View
  • Covering letterSUPPORTING INFORMATION23 Oct 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Decision not yet published

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.