Council planning record

LISTED BUILDING APPLICATION FOR CHANGE OF USE FROM RETAIL (A1)TO RESTAURANT, CAFE AND WINE BAR WITH LIVE ENTERTAINMENT (SUI GENERIS) REMOVAL OF EXISTING METAL FIRE ESCAPE, PART BUILDING TO SIDE, GROUND FLOOR SHOPFRONT AND REPLACEMENT WITH NEW SHOPFRONT. CONSTRUCTION OF NEW SIDE EXTENSION TO PROVIDE MEANS OF ESCAPE, INTERNAL AND EXTERNAL WORKS AND ALTERATIONS WITH REPAIRS TO THE FRONT AND SIDE ELEVATIONS (UPPER FLOORS)

11 Leeming Street Mansfield Nottinghamshire NG18 1NA

DecidedReference: 2018/0301/LBWMansfield District Council

Last published check: 2 Oct 2026, 07:11. Check the council record for more recent changes.

Application location

11 Leeming Street Mansfield Nottinghamshire NG18 1NA

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Listed Building Consent
Received
2 May 2018
Validated
8 May 2018
Determination deadline
3 Jul 2018
Local authority
Mansfield District Council

Application overview

LISTED BUILDING APPLICATION FOR CHANGE OF USE FROM RETAIL (A1)TO RESTAURANT, CAFE AND WINE BAR WITH LIVE ENTERTAINMENT (SUI GENERIS) REMOVAL OF EXISTING METAL FIRE ESCAPE, PART BUILDING TO SIDE, GROUND FLOOR SHOPFRONT AND REPLACEMENT WITH NEW SHOPFRONT. CONSTRUCTION OF NEW SIDE EXTENSION TO PROVIDE MEANS OF ESCAPE, INTERNAL AND EXTERNAL WORKS AND ALTERATIONS WITH REPAIRS TO THE FRONT AND SIDE ELEVATIONS (UPPER FLOORS)

Proposal details

Reference
2018/0301/LBW
Alternative references
PP-06700419
Ward
Vale
Agent
Westfield Planning Ltd.

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 20 of 20

DocumentPublishedAction
Site appraisal sheetAPPRAISAL · PDF7 Sept 2018View
Decision noticeDECISION NOTICE · PDF7 Sept 2018View
Conservation commentsCONSULTEE COMMENT10 Jul 2018View
Design & access/heritage statementSUPPORTING INFORMATION · PDF2 May 2018View
Planning statementSUPPORTING INFORMATION · PDF2 May 2018View
Existing basement floor planDRAWING · PDF2 May 2018View
Existing ground floor planDRAWING · PDF2 May 2018View
Existing first floor planDRAWING · PDF2 May 2018View
Existing second floor planDRAWING · PDF2 May 2018View
Existing front elelvationDRAWING · PDF2 May 2018View
Proposed basement floor planDRAWING · PDF2 May 2018View
Proposed ground floor planDRAWING · PDF2 May 2018View
Proposed first floor planDRAWING · PDF2 May 2018View
Propsoed second floor planDRAWING · PDF2 May 2018View
Proposed front elevationDRAWING · PDF2 May 2018View
Proposed cross sectionDRAWING · PDF2 May 2018View
Xisting/proposed cross sectionDRAWING · PDF2 May 2018View
Location planDRAWING · PDF2 May 2018View
Historic building reportSUPPORTING INFORMATION · PDF2 May 2018View
Application form - without personal dataAPPLICATION FORM · PDF2 May 2018View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  4. Last Site Notice Posted Date

    Published milestoneCouncil source
  5. Last Advertised In Press Date

    Published milestoneCouncil source
  6. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Decision Issued Date

    Published milestoneCouncil source
  13. Decision Made Date

    Published milestoneCouncil source
  14. Permission Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Grant LB Consent with Conditions
Decision notice

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.