Council planning record

Discharge of listed building conditions 4 (lock steps and planters), 5 (external materials (ramp)), 6 (interface between the existing lock tail bridge and the proposed bridge), 7 (balustrades), 8 (interface, levels and relationship between the regraded ramp), 9 (Lock landing area and mooring rings) and 10 (Proposed Balustrades - Interface with the Bascule Bridge) associated with Listed Building Consent 131346/LO/2021

Ashton Canal Towpath Manchester

FinalReference: CDN/22/0917Manchester City Council

Last published check: 9 Oct 2026, 11:36. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Valid date

    Published milestoneCouncil source
  2. Target decision date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  3. Decision notice sent date

    Published milestoneCouncil source

Application summary

Status
Final
Application type
Approval of details reserved by a condition
Received
Not published
Validated
16 Dec 2022
Determination deadline
10 Feb 2023
Local authority
Manchester City Council

Application overview

Discharge of listed building conditions 4 (lock steps and planters), 5 (external materials (ramp)), 6 (interface between the existing lock tail bridge and the proposed bridge), 7 (balustrades), 8 (interface, levels and relationship between the regraded ramp), 9 (Lock landing area and mooring rings) and 10 (Proposed Balustrades - Interface with the Bascule Bridge) associated with Listed Building Consent 131346/LO/2021

Proposal details

Reference
CDN/22/0917
Alternative references
PP-11777917
Ward
Ancoats & Beswick
Agent
Mr John Cooper

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Ashton Canal Towpath Manchester

This record has no verified map location.

Documents 42 of 42

DocumentPublishedAction
145283.pdfPlan · PDF19 May 2023View
145279.pdfPlan · PDF16 Dec 2022View
145282.pdfPlan · PDF16 Dec 2022View
ICB-HBA-00-00-DR-A-24-0401.pdfPlan · PDF19 May 2023View
145298.pdfPlan · PDF16 Dec 2022View
145288.pdfPlan · PDF16 Dec 2022View
145269.pdfPlan · PDF16 Dec 2022View
145290.pdfPlan · PDF16 Dec 2022View
145275.pdfPlan · PDF16 Dec 2022View
145296.pdfPlan · PDF16 Dec 2022View
145289.pdfPlan · PDF16 Dec 2022View
145268.pdfPlan · PDF16 Dec 2022View
145278.pdfPlan · PDF16 Dec 2022View
145299.pdfPlan · PDF16 Dec 2022View
145271.pdfPlan · PDF19 May 2023View
257678.pdfDecision · PDF23 May 2023View
145277.pdfPlan · PDF16 Dec 2022View
145276.pdfPlan · PDF16 Dec 2022View
145270.pdfPlan · PDF16 Dec 2022View
145300.pdfPlan · PDF19 May 2023View
145272.pdfPlan · PDF16 Dec 2022View
145280.pdfPlan · PDF16 Dec 2022View
145301.pdfSupporting Information · PDF16 Dec 2022View
145273.pdfPlan · PDF16 Dec 2022View
145284.pdfPlan · PDF16 Dec 2022View
ICB-HBA-00-00-DR-A-42-0401.pdfPlan · PDF19 May 2023View
145287.pdfPlan · PDF19 May 2023View
145281.pdfPlan · PDF16 Dec 2022View
145293.pdfPlan · PDF16 Dec 2022View
145297.pdfPlan · PDF16 Dec 2022View
145291.pdfPlan · PDF16 Dec 2022View
145263.pdfApplication Form · PDF16 Dec 2022View
145267.pdfPlan · PDF16 Dec 2022View
145294.pdfPlan · PDF16 Dec 2022View
145266.pdfCorrespondence · PDF16 Dec 2022View
145274.pdfPlan · PDF16 Dec 2022View
ICB-HBA-00-00-DR-A-24-0402.pdfPlan · PDF19 May 2023View
145285.pdfPlan · PDF16 Dec 2022View
Response CRTR-PLAN-2023-38438.pdfSupporting Information · PDF19 May 2023View
145295.pdfPlan · PDF16 Dec 2022View
145292.pdfPlan · PDF16 Dec 2022View
145286.pdfPlan · PDF16 Dec 2022View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approve
257678.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.