Council planning record

Erection of 14-storey building comprising purpose-built student accommodation (PBSA) (Sui Generis) and ground floor Food Hall (Sui Generis Use), and other associated works including external amenity spaces, public realm, secure cycle parking, access and servicing arrangements (Plot 10B)

Land Bounded By River Street To The North, River Street And Vacant Lane To The East, Hulme Street To The South And Plot 10A Of The First Street Masterplan To The West Manchester

FinalReference: 136170/FO/2023Manchester City Council

Last published check: 9 Oct 2026, 01:01. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Valid date

    Published milestoneCouncil source
  2. Date of committee

    Published milestoneCouncil source
  3. Decision notice sent date

    Published milestoneCouncil source
  4. Target decision date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Final
Application type
Full planning permission
Received
Not published
Validated
1 Mar 2023
Determination deadline
3 Nov 2025
Local authority
Manchester City Council

Application overview

Erection of 14-storey building comprising purpose-built student accommodation (PBSA) (Sui Generis) and ground floor Food Hall (Sui Generis Use), and other associated works including external amenity spaces, public realm, secure cycle parking, access and servicing arrangements (Plot 10B)

Proposal details

Reference
136170/FO/2023
Alternative references
PP-11817451
Ward
Deansgate
Agent
Mr Niall Alcock

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land Bounded By River Street To The North, River Street And Vacant Lane To The East, Hulme Street To The South And Plot 10A Of The First Street Masterplan To The West Manchester

This record has no verified map location.

Documents 117 of 117

DocumentPublishedAction
Plot 10b Statement of Consultation.pdfSupporting Information · PDF1 Mar 2023View
1172-TGA-XX-XX-DR-A-95021-P02 Site Location_Proposed Site Plan.pdfSite Plan · PDF27 Apr 2023View
PL1471.3-ID-002-00 Plot 10B Landscape D&A.pdfDesign & Access Statement · PDF17 May 2023View
Plot 10b Framework Travel Plan.pdfTransport or Travel information · PDF27 Apr 2023View
1471.3-PLA-ZZ-00-DR-L-003 - Softworks.pdfPlan · PDF17 May 2023View
Plot 10b Crime Impact Statement.pdfSupporting Information · PDF17 Feb 2023View
Appendix 6.1 Air Quality Technical Appendix.pdfEnvironmental Statement · PDF17 Feb 2023View
Plot 10b Ecological Phase 1 Habitat Survey and Baseline BNG Assessment.pdfEcology report · PDF1 Mar 2023View
Appendix 5.2 Plot 10b Construction Management Plan.pdfEnvironmental Statement · PDF17 Feb 2023View
1172-TGA-XX-XX-DR-A-95050-P02 General Arrangement - North Elevation.pdfPlan · PDF17 May 2023View
Appendix 1.1 Site Location Plan.pdfEnvironmental Statement · PDF1 Mar 2023View
Plot 10b Waste & Servicing Strategy.pdfWaste Management · PDF27 Apr 2023View
Appendix 8.11 Facade Study.pdfEnvironmental Statement · PDF17 Feb 2023View
Appendix 8.5 10b Technical Analysis Results.pdfEnvironmental Statement · PDF17 Feb 2023View
Student Management Plan.pdfSupporting Information · PDF12 May 2023View
1172-TGA-XX-ZZ-DR-A-95210-P02 Typical Bay Study - Ground Floor Food Hall.pdfPlan · PDF17 May 2023View
1172-TGA-XX-ZZ-DR-A-95212-P02 Typical Bay Study - First Floor to Level 10.pdfPlan · PDF17 May 2023View
Appendix 8.1 10a Massing Images Baseline v Proposed.pdfEnvironmental Statement · PDF17 Feb 2023View
134043 & 136170 Sunlight & Daylight Impacts table 20Apr.pdfDaylight & Sunlight assessment · PDF20 Apr 2023View
Appendix 2.1 EIA Scoping Report.pdfEnvironmental Statement · PDF17 Feb 2023View
Plot 10b Ground Conditions Phase 2 Site Investigation.pdfGround Survey · PDF1 Mar 2023View
Appendix 8.4 10b Massing Images Baseline vs Proposed.pdfEnvironmental Statement · PDF17 Feb 2023View
1172-TGA-XX-XX-DR-A-95060-P01 Context Elevations - Existing West Elevation.pdfPlan · PDF17 Feb 2023View
1471.3-PLA-ZZ-00-DR-L-005 - Levels and Drainage.pdfPlan · PDF17 May 2023View
Plot 10b Student Management Plan.pdfSupporting Information · PDF17 Feb 2023View
Plot 10b TV and Radio Reception Assessment.pdfSupporting Information · PDF1 Mar 2023View
Plot 10b Ground Conditions Phase 1 Desktop Study.pdfGround Survey · PDF17 Feb 2023View
Appendix 8.3 10a Technical Analysis Results.pdfEnvironmental Statement · PDF17 Feb 2023View
Plot 10b Air Quality Technical Note.pdfSupporting Information · PDF27 Apr 2023View
1172-TGA-XX-14-DR-A-95034-P02 General Arrangement - Roof Level.pdfPlan · PDF27 Apr 2023View
179310.pdfLocation Plan · PDF27 Apr 2023View
Appendix 8.10 Mirror Image Analysis.pdfEnvironmental Statement · PDF17 Feb 2023View
1471.3-PLA-ZZ-00-DR-L-007 - Hardworks.pdfPlan · PDF17 May 2023View
TGA_First Street V4_Original.pdfPlan · PDF9 May 2023View
1172-TGA-XX-XX-DR-A-95054-P02 Context Elevations - Existing North Elevation.pdfPlan · PDF17 Feb 2023View
Appendix 8.6 10a and 10b Massing Images Baseline vs Proposed .pdfEnvironmental Statement · PDF17 Feb 2023View
PL1471.3-PLA-ZZ-00-DR-L-009-P03-General Arrangement with Levels.pdfPlan · PDF27 Apr 2023View
Appendix 12.2 Visual Effects Table Baseline and Effect.pdfEnvironmental Statement · PDF17 Feb 2023View
TGA_First Street V5_Updated.pdfPlan · PDF17 May 2023View
Appendix 7.2 Plot 10b Whole Life Carbon Assessment Report.pdfEnvironmental Statement · PDF17 Feb 2023View
1172-TGA-XX-15-DR-A-95035-P02 General Arrangement - Plant Level Roof.pdfPlan · PDF27 Apr 2023View
1172-TGA-XX-ZZ-DR-A-95214-P01 Typical Bay Study - First Floor to Level 10 (West).pdfPlan · PDF17 May 2023View
1172-TGA-XX-XX-DR-A-95051-P02 General Arrangement - East Elevation.pdfPlan · PDF17 May 2023View
1172-TGA-XX-XX-DR-A-95041-P02 General Arrangement - Section BB.pdfPlan · PDF27 Apr 2023View
1172-TGA-XX-XX-DR-A-95056-P02 Context Elevations - North Elevation.pdfPlan · PDF27 Apr 2023View
Appendix 7.3 Climate Change Risk Review.pdfEnvironmental Statement · PDF17 Feb 2023View
Plot 10b Ventilation Statement.pdfSupporting Information · PDF1 Mar 2023View
Appendix 7.1 Plot 10a Whole Life Carbon Assessment Report.pdfEnvironmental Statement · PDF17 Feb 2023View
First Street Plot 10 - Verified View 01 Level 3_May23_Issue01.pdfPlan · PDF17 May 2023View
Plot 10b Written Scheme of Investigation.pdfSupporting Information · PDF1 Mar 2023View
4513-ROC-ZZ-XX-RP-ES-PRA Piling Risk Assessment.pdfGround Survey · PDF30 Jun 2023View
1172-TGA-XX-XX-DR-A-95057-P02 Context Elevations - East Elevation.pdfPlan · PDF27 Apr 2023View
1172-TGA-XX-ZZ-DR-A-95211-P02 Typical Bay Study - Ground to Level 01.pdfPlan · PDF17 May 2023View
1172-TGA-XX-01-DR-A-95031-P02 General Arrangement - Level 01.pdfPlan · PDF27 Apr 2023View
1172-TGA-XX-XX-DR-A-95058-P01 Context Elevations - Existing South Elevation.pdfPlan · PDF17 Feb 2023View
Appendix 12.1 Townscape and Landscape Baseline and Assessment Table.pdfEnvironmental Statement · PDF17 Feb 2023View
1172-TGA-XX-ZZ-DR-A-95033-P02 General Arrangement - Level 04-13 (Typical upper floor layout).pdfPlan · PDF27 Apr 2023View
Plot 10b Daylight and Sunlight Technical Note.pdfDaylight & Sunlight assessment · PDF27 Apr 2023View
Appendix 13.1 Methodology.pdfEnvironmental Statement · PDF17 Feb 2023View
Plot 10 Environmental Statement.pdfEnvironmental Statement · PDF1 Mar 2023View
305377.pdfDecision · PDF25 Jul 2023View
Appendix 8.8 Massing Images Cumulative Scenario.pdfEnvironmental Statement · PDF17 Feb 2023View
Plot 10b Local Labour Agreement.pdfSupporting Information · PDF17 Feb 2023View
Plot 10b Cover Letter.pdfCorrespondence · PDF1 Mar 2023View
TGA_First Street V4_Updated.pdfPlan · PDF9 May 2023View
Plot 10b CMP.pdfSupporting Information · PDF27 Apr 2023View
Plot 10b Wind Microclimate Technical Note.pdfSupporting Information · PDF27 Apr 2023View
1172-TGA-XX-XX-DR-A-95059-P01 Context Elevations - South Elevation.pdfPlan · PDF27 Apr 2023View
1172-TGA-XX-XX-DR-A-95042-P02 General Arrangement - Section CC.pdfPlan · PDF27 Apr 2023View
Committee Final.pdfOfficer Report · PDF25 Jul 2023View
Plot 10b Ground Conditions Ground Gas Addendum.pdfGround Survey · PDF17 Feb 2023View
4513-ROC-ZZ-XX-RP-ES- RMS Phase 3a Site Remediation Strategy.pdfGround Survey · PDF30 Jun 2023View
Plot 10b Gateway One Fire Statement.pdfSupporting Information · PDF1 Mar 2023View
Appendix 8.2 Window Maps.pdfEnvironmental Statement · PDF17 Feb 2023View
Plot 10b Transport Statement.pdfTransport or Travel information · PDF27 Apr 2023View
1172-TGA-XX-ZZ-DR-A-95213-P02 Typical Bay Study - Level 11 to Level 13.pdfPlan · PDF17 May 2023View
Plot 10b Broadband Connectivity Assessment.pdfSupporting Information · PDF1 Mar 2023View
TGA_First Street V1_Original.pdfPlan · PDF9 May 2023View
Appendix 10.2 Plot 10a Noise Impact Assessment .pdfEnvironmental Statement · PDF17 Feb 2023View
Plot 10 Non-Technical Summary.pdfEnvironmental Statement · PDF1 Mar 2023View
TGA_First Street V5_Original.pdfPlan · PDF9 May 2023View
1172-TGA-XX-XX-DR-A-95055-P02 Context Elevations - Existing East Elevation.pdfPlan · PDF17 Feb 2023View
Plot 10b Food Hall Management Plan.pdfSupporting Information · PDF17 Feb 2023View
Appendix 8.9 Technical Analysis Results Cumulative Scenario.pdfEnvironmental Statement · PDF17 Feb 2023View
1471.3-PLA-ZZ-00-DR-L-001 - General Arrangement.pdfPlan · PDF17 May 2023View
Plot 10b Planning and Tall Building Statement.pdfSupporting Information · PDF1 Mar 2023View
Appendix 12.4 Viewpoints and Photpgraphy.pdfEnvironmental Statement · PDF17 Feb 2023View
Plot 10b BREEAM Pre-Assessment.pdfSupporting Information · PDF17 Feb 2023View
Plot 10b Heritage Statement.pdfHeritage Statement · PDF1 Mar 2023View
Appendix 6.2 Air Quality Figures.pdfEnvironmental Statement · PDF17 Feb 2023View
1471.3-PLA-ZZ-00-DR-L-006 - Lighting.pdfPlan · PDF17 May 2023View
Plot 10b Energy Strategy.pdfSupporting Information · PDF1 Mar 2023View
1172-TGA-XX-XX-DR-A-95040-P02 General Arrangement - Section AA.pdfPlan · PDF27 Apr 2023View
1172-TGA-XX-ZZ-DR-A-95032-P02 General Arrangement - Level 02-03.pdfPlan · PDF27 Apr 2023View
TGA_First Street V1_Updated.pdfPlan · PDF9 May 2023View
Appendix 13.2 Figures.pdfEnvironmental Statement · PDF17 Feb 2023View
Appendix 2.2 - Committed Development.pdfEnvironmental Statement · PDF17 Feb 2023View
1172-TGA-XX-XX-DR-A-95061-P01 Context Elevations - West Elevation.pdfPlan · PDF27 Apr 2023View
179307.pdfApplication Form · PDF6 Feb 2023View
Appendix 12.3 Figures.pdfEnvironmental Statement · PDF17 Feb 2023View
136170 s106 25 July 23_Redacted.pdfSection 106 Agreement · PDF25 Jul 2023View
1172-TGA-XX-XX-DR-A-95053-P02 General Arrangement - West Elevation.pdfPlan · PDF17 May 2023View
1471.3-PLA-ZZ-00-DR-L-004 - Furniture.pdfPlan · PDF17 May 2023View
Appendix 2.3 - EIA Scoping Opinion.pdfEnvironmental Statement · PDF17 Feb 2023View
Plot 10b Environmental Standards Statement.pdfSupporting Information · PDF1 Mar 2023View
Plot 10b, First Street - Cover Letter Addendum.pdfCorrespondence · PDF27 Apr 2023View
Appendix 10.1 Plan of Sensitive Receptors.pdfEnvironmental Statement · PDF17 Feb 2023View
Plot 10b Flood Risk Assessment and Outline Drainage Strategy.pdfFlood Risk Assessment or Drainage · PDF1 Mar 2023View
First Street Plot 10 - Verified View 03 Level 3_May23_Issue01.pdfPlan · PDF17 May 2023View
Appendix 8.7 10a and 10b Technical Analysis Results.pdfEnvironmental Statement · PDF17 Feb 2023View
Appendix 5.1 Plot 10a Construction Management Plan and TMP.pdfEnvironmental Statement · PDF17 Feb 2023View
Plot 10b Topographical Survey.pdfSupporting Information · PDF17 Feb 2023View
HS-TGA-Z100-SC-XX-00002-Scenario 01.pdfSupporting Information · PDF17 May 2023View
Appendix 10.3 Plot 10b Noise Impact Assessment.pdfEnvironmental Statement · PDF17 Feb 2023View
Plot 10b Design and Access Statement.pdfDesign & Access Statement · PDF17 May 2023View
1172-TGA-XX-XX-DR-A-95052-P02 General Arrangement - South Elevation.pdfPlan · PDF17 May 2023View
1172-TGA-XX-00-DR-A-95030-P03 General Arrangement - Level 00 (Ground Floor).pdfPlan · PDF27 Apr 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approve
305377.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.