Council planning record

Variation of planning condition 2 (approved dwgs) (Changes to comprise: change to the material and appearance of the theatre cladding system; expansion of the picture window,changes to the back-of-house towers (substitution from channel glass to translucent film and use of curtain wall to part elevation), omission of the cladding to the external truck lift and alternative corner protection and amendments to align with submission of information in respect of the detailed design of the public realm ((including changes to facilitate alignment with a prohibition of driving order to part of of Water Street) (application ref no CDN/20/0187)) attached to application ref no 119890/VO/2018 as amended by 121792.

Factory 161 Water Street Manchester M3 4JQ

FinalReference: 130034/JO/2021Manchester City Council

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Valid date

    Published milestoneCouncil source
  2. Decision notice sent date

    Published milestoneCouncil source
  3. Target decision date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Final
Application type
Removal/variation of conditions
Received
Not published
Validated
20 Apr 2021
Determination deadline
25 Aug 2022
Local authority
Manchester City Council

Application overview

Variation of planning condition 2 (approved dwgs) (Changes to comprise: change to the material and appearance of the theatre cladding system; expansion of the picture window,changes to the back-of-house towers (substitution from channel glass to translucent film and use of curtain wall to part elevation), omission of the cladding to the external truck lift and alternative corner protection and amendments to align with submission of information in respect of the detailed design of the public realm ((including changes to facilitate alignment with a prohibition of driving order to part of of Water Street) (application ref no CDN/20/0187)) attached to application ref no 119890/VO/2018 as amended by 121792.

Proposal details

Reference
130034/JO/2021
Alternative references
PP-08645781
Ward
Deansgate
Agent
Miss Frances Hampson

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Factory 161 Water Street Manchester M3 4JQ

This record has no verified map location.

Documents 111 of 111

DocumentPublishedAction
Sample Panels.pdfPlan · PDF21 May 2021View
MF-PLA-XX-GF-DR-L-10-0004-S4-P05.pdfPlan · PDF14 Apr 2021View
Factory QP Flowchart.pdfNoise assessment or information · PDF15 Dec 2021View
Factory Wind Microclimate.pdfSupporting Information · PDF21 May 2021View
Factory - Planning Samples Tracker LR 03.12.21.pdfSupporting Information · PDF8 Dec 2021View
Report 130034 JO Factory.pdfOfficer Report · PDF23 Aug 2022View
MF-OMA-XX-GF-DR-A-10-0100 Rev P10 PROPOSED GROUND FLOOR PLAN.pdfPlan · PDF21 May 2021View
Public Realm Drawings Tree Details.pdfPlan · PDF14 Apr 2021View
Factory External Lighting - Light Pollution Study.pdfSupporting Information · PDF21 May 2021View
MF-PLA-XX-GF-DR-L-10-5006-D2-P01 Typical Hardworks Details Highway Demarcation by Planit-IE.pdfPlan · PDF21 May 2021View
MF-RYD-WH-L6-DR-A-40-0510 PO1 - Towers Envelope External Section Detail 10.pdfPlan · PDF21 May 2021View
MCC040_10_2019 Consent Approval Letter.pdfSupporting Information · PDF14 Apr 2021View
MF-PLA-XX-GF-DR-L-10-7000.pdfPlan · PDF22 Oct 2021View
Towers Envelope External Plan.pdfPlan · PDF14 Apr 2021View
MF-PLA-XX-XX-DR-L-10-7016.pdfPlan · PDF22 Oct 2021View
Public Realm Biodiversity Options.pdfSupporting Information · PDF21 May 2021View
MF-OMA-XX-RF-DR-A-10-0190 Rev P11 PROPOSED ROOF PLAN.pdfPlan · PDF21 May 2021View
Vol 2 compiled.pdfEnvironmental Statement · PDF14 Apr 2021View
MF-RYD-WH-XX-DR-A-36-001 PO1 TOWERS GA.pdfPlan · PDF21 May 2021View
MF-RYD-TH-XX-DR-A-41-0203 rev PO2 ROOF PLANE 1 TO 2 PROFILE SECTION DETAIL.pdfPlan · PDF21 May 2021View
MF-RYD-WH-L2-DR-A-40-0519 PO1 Towers Envelope External Plan Detail 19.pdfPlan · PDF21 May 2021View
Towers Envelope External Section Detail 04.pdfPlan · PDF14 Apr 2021View
Aviva studios noise emission test receptor proposal.pdfNoise assessment or information · PDF7 Mar 2024View
The Factory - Southern Outfall Methodology Proposal.pdfSupporting Information · PDF14 Apr 2021View
Non-Technical Summary.pdfEnvironmental Statement · PDF14 Apr 2021View
Proposed East Elevation.pdfPlan · PDF21 May 2021View
Theatre GA West Elevation.pdfPlan · PDF21 May 2021View
MF-BHE-XX-XX-RP-CG-0002.pdfGround Survey · PDF23 Aug 2022View
MF-PLA-XX-GF-DR-L-10-0004-S4-P05 Landscape Illustrative Masterplan Ground Floor.pdfPlan · PDF21 May 2021View
MF-LAV-XX-XX-RP-YA-01-0039-T02.pdfNoise assessment or information · PDF20 Jul 2021View
MF-OMA-XX-L3-DR-A-10-0130 Rev P11 PROPOSED LEVEL 03 PLAN.pdfPlan · PDF24 May 2021View
MF-RYD-TH-XX-DR-A-41-0204 rev PO2 ROOF PLANE 1 TO WAREHOUSE GUTTER SECTION DETAIL.pdfPlan · PDF21 May 2021View
053402.pdfDecision · PDF23 Aug 2022View
MF-PLA-XX-GF-DR-L-10-5009-D2-P01 Typical Hardworks Details Thermoplastics Markings by Planit-IE.pdfPlan · PDF21 May 2021View
MF-LAV-XX-XX-RP-YA-01-0039-T06.pdfNoise assessment or information · PDF2 Feb 2022View
MF-RYD-WH-L6-DR-A-40-0504 PO1 - Towers Envelope External Section Detail 04.pdfPlan · PDF21 May 2021View
MF-PLA-XX-XX-DR-L-10-7013.pdfPlan · PDF22 Oct 2021View
Public Realm Design and Access Statement.pdfDesign & Access Statement · PDF21 May 2021View
MF-PLA-XX-GF-DR-L-10-6001-D2-P06 Typical Treet Pit Details T P 1 by Planit-IE.pdfPlan · PDF21 May 2021View
MF-OMA-XX-L1-DR-A-10-0110 Rev P10 PROPOSED LEVEL 01 PLAN.pdfPlan · PDF21 May 2021View
MF-OMA-XX-L2-DR-A-10-0120 Rev P10 PROPOSED LEVEL 02 PLAN.pdfPlan · PDF21 May 2021View
Volume 1.pdfEnvironmental Statement · PDF14 Apr 2021View
Tree Officer Responses 2021-03-12.pdfSupporting Information · PDF21 May 2021View
Proposed South Elevation.pdfPlan · PDF21 May 2021View
Material Sample Updated Programme.pdfSupporting Information · PDF21 May 2021View
PL1803-ID-021-00 The Factory - Public Realm Accompanying Document.pdfSupporting Information · PDF21 May 2021View
649646.pdfApplication Form · PDF14 Apr 2021View
MF-RYD-WH-L3-DR-A-40-0535 PO1 Towers Envelope External Plan Detail 35.pdfPlan · PDF21 May 2021View
MF-PLA-XX-GF-DR-L-10-5002-D2-P02 Hardworks Details Interfaces by Planit-IE.pdfPlan · PDF21 May 2021View
MF-LAV-XX-XX-RP-YA-01-0016-vC08 Acoustic Performance Spec.pdfNoise assessment or information · PDF15 Dec 2021View
Towers Envelope External Section Detail.pdfPlan · PDF14 Apr 2021View
MF-PLA-XX-GF-DR-L-10-5000-D2-P05 Hardworks Details Surfaces by Planit-IE.pdfPlan · PDF21 May 2021View
MF-OMA-XX-L6-DR-A-10-0160 Rev P10 PROPOSED LEVEL 06 PLAN.pdfPlan · PDF21 May 2021View
PL1803-ID-026-00 The Factory - Discharge of Condition 4E.pdfSupporting Information · PDF21 May 2021View
MF-OMA-XX-L5-DR-A-10-0150 Rev P10 PROPOSED LEVEL 05 PLAN.pdfPlan · PDF21 May 2021View
Segment 002 of Factory Section 73_AVR Views.pdfPlan · PDF14 Apr 2021View
MF-PLA-XX-XX-DR-L-10-7017.pdfPlan · PDF22 Oct 2021View
Roof Plane 1 to 2 Profile Section Detail.pdfPlan · PDF14 Apr 2021View
MF-PLA-XX-GF-DR-L-10-5001-D2-P03 Hardworks Details Surfaces by Planit-IE.pdfPlan · PDF21 May 2021View
FACTORY PUBLIC REALM ACCESS STATEMENT.pdfDesign & Access Statement · PDF21 May 2021View
MF-OMA-XX-L7-DR-A-10-0170 Rev P10 PROPOSED LEVEL 07 PLAN.pdfPlan · PDF21 May 2021View
MF-PLA-XX-GF-DR-L-10-2000-D2-P04 Softworks General Arrangement Ground Floor by Planit-IE.pdfPlan · PDF21 May 2021View
Public Realm Drawings Hard and Soft LandscapingREDUCED.pdfPlan · PDF14 Apr 2021View
Proposed West Elevation.pdfPlan · PDF21 May 2021View
PL1803-ID-022-00 The Factory - Discharge of Condition 4A.pdfSupporting Information · PDF21 May 2021View
PL1803-WO-001-00 Tree Officer Responses.pdfSupporting Information · PDF21 May 2021View
PL1803-ID-023-00 The Factory - Discharge of Condition 4B.pdfSupporting Information · PDF21 May 2021View
Towers Envelope External Detail.pdfPlan · PDF14 Apr 2021View
MF-BHE-XX-XX-RP-CG-0003.pdfGround Survey · PDF23 Aug 2022View
MF-RYD-TH-XX-DR-A-37-0230 rev PO3 THEATRE ENVELOPE 3D VIEWS.pdfPlan · PDF21 May 2021View
Public Realm Biodiversity Options.pdfPlan · PDF14 Apr 2021View
MF-LAV-XX-XX-RP-YA-01-0039-T04 Acoustic noise study emission.pdfNoise assessment or information · PDF15 Dec 2021View
MF-OMA-XX-L3-DR-A-10-0130_Ver5.pdfPlan · PDF5 Jan 2022View
MF-RYD-WH-L3-DR-A-40-0502 PO1 Towers Envelope External Section Detail 02.pdfPlan · PDF21 May 2021View
Public Realm Transport Statement FOR INFORMATION.pdfTransport or Travel information · PDF21 May 2021View
MF-LAV-XX-XX-RP-YA-01-0041.pdfNoise assessment or information · PDF6 Jan 2022View
MF-LAV-XX-XX-RP-YA-01-0039-T03.pdfNoise assessment or information · PDF19 Nov 2021View
MF-PLA-XX-GF-DR-L-10-1000-D2-P10 Hardworks General Arrangement Ground Floor by Planit-IE.pdfPlan · PDF21 May 2021View
Red Bubble Proposed Application Drawings.pdfPlan · PDF21 May 2021View
Segment 001 of Factory_Marked Up Drawings Showing Change.pdfPlan · PDF14 Apr 2021View
MF-PLA-XX-GF-DR-L-10-5005-D2-P01 Typical Hardworks Details Wayfinding Paving by Planit-IE.pdfPlan · PDF21 May 2021View
MF-PLA-XX-XX-DR-L-10-7011.pdfPlan · PDF22 Oct 2021View
MF-OMA-XX-L4-DR-A-10-0140 Rev P11 PROPOSED LEVEL 04 PLAN.pdfPlan · PDF21 May 2021View
MF-PLA-XX-GF-DR-L-10-5007-D2-P05 Hardworks Details Interfaces by Planit-IE.pdfPlan · PDF21 May 2021View
Factory Planning Update for Facades.pdfSupporting Information · PDF21 May 2021View
FACTORY_facade sample schedule 210709.pdfSupporting Information · PDF9 Jul 2021View
20200512_S.73 Air Quality Technical Note - The Factory.pdfSupporting Information · PDF21 May 2021View
MF-LAV-XX-XX-RP-YA-01-0051-C03.pdfNoise assessment or information · PDF7 Mar 2024View
MF-PLA-XX-XX-DR-L-10-7012.pdfPlan · PDF22 Oct 2021View
28.04.2020. The Factory, Bonded Warehouse. Addendum Heritage Note. SLHA. Issued .pdfHeritage Statement · PDF21 May 2021View
Factory Section 73 Cover Letter.pdfCorrespondence · PDF14 Apr 2021View
Public Realm Transport Appendices FOR INFORMATION.pdfTransport or Travel information · PDF21 May 2021View
Factory Quality Management Plan Brief.pdfNoise assessment or information · PDF15 Dec 2021View
Public Realm Drawings Details of Steps and Handrails.pdfPlan · PDF14 Apr 2021View
MF-OMA-XX-L8-DR-A-10-0180 Rev P9 PROPOSED LEVEL 08 PLAN.pdfPlan · PDF21 May 2021View
MF-PLA-XX-GF-DR-L-10-7005-D2-P03 Typical Furniture and Hardworks Details Handrails and Steps by Planit-IE.pdfPlan · PDF21 May 2021View
PL1803-ID-024-00 The Factory - Discharge of Condition 4C.pdfSupporting Information · PDF21 May 2021View
MF-PLA-XX-GF-DR-L-10-7001-D2-P01 Typical Furniture Details BDP Steps Interface Seating by Planit-IE.pdfPlan · PDF21 May 2021View
MF-PLA-XX-GF-DR-L-10-1001-D2-P08 Kerbs and Edging General Arrangement Ground Floor by Planit-IE.pdfPlan · PDF21 May 2021View
Factory EIA Preface.pdfEnvironmental Statement · PDF14 Apr 2021View
Segment 002 of Factory_Marked Up Drawings Showing Changes.pdfPlan · PDF14 Apr 2021View
Towers Envelope External Section Detail 10.pdfPlan · PDF14 Apr 2021View
Transport Technical Note.pdfTransport or Travel information · PDF21 May 2021View
MF-PLA-XX-GF-DR-L-10-7014-D2-P10 River Wall Detail by Planit-IE.pdfPlan · PDF21 May 2021View
Tower GA Plan.pdfPlan · PDF14 Apr 2021View
Red Line Plan.pdfLocation Plan · PDF21 May 2021View
Segment 001 of Factory Section 73_AVR Views.pdfPlan · PDF14 Apr 2021View
MF-PLA-XX-GF-DR-L-10-6002-D2-P06 Typical Tree Pit Details Ground Floor by Planit-IE.pdfPlan · PDF21 May 2021View
Proposed North Elevation.pdfPlan · PDF21 May 2021View
Roof Plane 1 to Warehouse Gutter Section Detail.pdfPlan · PDF14 Apr 2021View
MF-PLA-XX-GF-DR-L-10-5008-D2-P04 Hardworks Details Permeable Paving Arrangement by Planiit-IE.pdfPlan · PDF21 May 2021View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approve
053402.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.