Council planning record

Installation of 14no Solar Panels to south facing roof of outbuilding

Brook House B4196 Holt Heath Holt Heath WR6 6TA

ApprovalReference: M/25/00220/HPMalvern Hills District Council

Last published check: 15 Sept 2026, 02:03. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Valid Date

    Published milestoneCouncil source
  3. Consultation Start Date

    Published milestoneCouncil source
  4. Advert Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Consultation End

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Date

    Published milestoneCouncil source

Application summary

Status
Approval
Application type
Householder Planning
Received
10 Feb 2025
Validated
10 Mar 2025
Determination deadline
Not published
Local authority
Malvern Hills District Council

Application overview

Installation of 14no Solar Panels to south facing roof of outbuilding

Proposal details

Reference
M/25/00220/HP
Ward
Hallow & Holt Ward
Parish
Holt CP
Agent
Mr Mike Court, Green Future Architects Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Brook House B4196 Holt Heath Holt Heath WR6 6TA

This record has no verified map location.

Documents 21 of 21

DocumentPublishedAction
Application form01. Application Form10 Feb 2025View
Preliminary Roost Assessment02. Supporting Information10 Mar 2025View
0015s P0 080 Photo Sheet 103. Photo10 Feb 2025View
0015s P0 081 Photo Sheet 203. Photo10 Feb 2025View
0015s P0 083 Product Data03. Photo10 Feb 2025View
0015s Water Management Strategy17. Validation10 Feb 2025View
0015s Planning And Heritage Statement17. Validation10 Feb 2025View
Site Location Plan.pdf04. Site / Location Plan20 Feb 2025View
Site Ownership Plan.pdf04. Site / Location Plan20 Feb 2025View
Existing Elevations05. Existing Plans10 Feb 2025View
Existing Block Plan05. Existing Plans19 Feb 2025View
Proposed Elevations06. Proposed Plans10 Feb 2025View
Proposed Block Plan06. Proposed Plans19 Feb 2025View
Proposed Block Plan 500.pdf06. Proposed Plans19 Feb 2025View
Existing and Proposed Floor Plan 50.pdf06. Proposed Plans19 Feb 2025View
Drainage Engineer - Engineers - S.W. Land Drainage Partnership09. Response - Statutory Consultee13 Mar 2025View
Worcestershire County Council (Footpaths) - WCC - Footpaths09. Response - Statutory Consultee18 Mar 2025View
Caroline Lightfoot 1 Pool Cottages, Holt Heath, WORCESTER, WR6 6NA09. Response - Statutory Consultee16 Apr 2025View
Worcestershire County Council (Footpaths)09a. Response - Statutory Consultee Attachment18 Mar 2025View
Delegated Report11. Decision Information1 May 2025View
Decision Notice12. Decision Notice1 May 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approval
Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.