Council planning record

The construction, operation (including maintenance) and decommissioning of an onshore wind electricity generating facility and associated infrastructure, comprising up to 15 Wind Turbine Generators (WTGs), onsite substation, access tracks, underground cabling, temporary construction compounds, temporary concrete batching plant, and landscape and ecological mitigation and enhancement.

Land East Of Bridge Wick Lane Dengie Essex

Application refusedReference: 25/01022/FULMMaldon District Council

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Standard Consultation Date

    Published milestoneCouncil source
  5. Last Advertised In Press Date

    Published milestoneCouncil source
  6. Last Site Notice Posted Date

    Published milestoneCouncil source
  7. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Actual Committee Date

    Published milestoneCouncil source
  10. Decision Issued Date

    Published milestoneCouncil source
  11. Decision Made Date

    Published milestoneCouncil source

Application summary

Status
Application refused
Application type
Full Application Major
Received
17 Nov 2025
Validated
18 Nov 2025
Determination deadline
17 Feb 2026
Local authority
Maldon District Council

Application overview

The construction, operation (including maintenance) and decommissioning of an onshore wind electricity generating facility and associated infrastructure, comprising up to 15 Wind Turbine Generators (WTGs), onsite substation, access tracks, underground cabling, temporary construction compounds, temporary concrete batching plant, and landscape and ecological mitigation and enhancement.

Proposal details

Reference
25/01022/FULM
Alternative references
PP-14350416
Ward
Tillingham
Parish
Dengie
Agent
Tabitha Knowles - DWD

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land East Of Bridge Wick Lane Dengie Essex

This record has no verified map location.

View council map

Documents 501 of 501

DocumentPublishedAction
Chelmsford City CouncilConsultation Response29 Sept 2026View
Newspaper advert 23.04.26Newspaper clipping4 Aug 2026View
Refused - 3.8.26 - 25-01022-FULMDecision Notice3 Aug 2026View
Public Committee Report - District Planning CommitteeCommittee Report7 Jul 2026View
Applicant Response to Natural EnglandSupporting Information2 Jul 2026View
Annex A to standard lettersConsultation Response9 Jun 2026View
Natural EnglandConsultation Response9 Jun 2026View
Environment Agency 13.05 Pt 2 Submitted 03.06.26Consultation Response5 Jun 2026View
Arboriculture Response 18.05.2026Consultation Response3 Jun 2026View
RSPBConsultation Response28 May 2026View
Mayland Parish CouncilConsultation Response20 May 2026View
Tree Consultant SupportConsultation Response20 May 2026View
Essex County Fire And Rescue ServiceConsultation Response19 May 2026View
County HighwaysConsultation Response19 May 2026View
West Mersea Town CouncilConsultation Response14 May 2026View
Cold Norton Parish CouncilConsultation Response14 May 2026View
Port of London AuthorityConsultation Response14 May 2026View
Ecology ResponseConsultation Response14 May 2026View
Environment AgencyConsultation Response14 May 2026View
Historic EnglandConsultation Response13 May 2026View
St Lawrence PC ResponseConsultation Response11 May 2026View
Latchingdon Parish CouncilConsultation Response6 May 2026View
Tree ConsultantConsultation Response6 May 2026View
RVAA VP 23 3 Marsh House Cottages (Rev 1)Supporting Information30 Apr 2026View
RVAA VP 22 Howe Farm Cottage (Rev 1)Supporting Information30 Apr 2026View
RVAA VP 21 Howe Farmhouse (Rev 1)Supporting Information30 Apr 2026View
RVAA VP 20 Little Grange (Rev 1)Supporting Information30 Apr 2026View
RVAA VP 19 Grange House (Rev 1)Supporting Information30 Apr 2026View
RVAA VP 17 3 East Ware Cottages (Rev 1)Supporting Information30 Apr 2026View
RVAA VP 16 2 East Ware Cotages (Rev 1)Supporting Information30 Apr 2026View
RVAA VP 14 Brook Cottage (Rev 1)Supporting Information30 Apr 2026View
RVAA VP 12 Brook Farm (Rev 1)Supporting Information30 Apr 2026View
RVAA VP 11 Bridgewick Farmhouse North (Rev 1)Supporting Information30 Apr 2026View
RVAA VP 9 Court Farm House (Rev 1)Supporting Information30 Apr 2026View
RVAA VP 8 Middlewick Lodge (Rev 1)Supporting Information30 Apr 2026View
RVAA VP 6 Old Montsale Farm (Rev 1)Supporting Information30 Apr 2026View
RVAA VP 5 Montsale Barn (Rev 1)Supporting Information30 Apr 2026View
RVAA VP 4 New Montsale (Rev 1)Supporting Information30 Apr 2026View
RVAA VP 2 Coney Hall (Rev 1)Supporting Information30 Apr 2026View
LVIA VP 22 Additional Viewpoint at Dengie Church photomontages e-hSupporting Information30 Apr 2026View
RVAA Additional Wirelines for Middle Wick CottagesSupporting Information30 Apr 2026View
LVIA VP 22 Additional Viewpoint at Dengie Church baseline views a-dSupporting Information30 Apr 2026View
Fig 6.24b Local Public Rights of Way and Roads (S)Supporting Information30 Apr 2026View
Fig 6.24a Local Public Rights of Way and Roads (N)Supporting Information30 Apr 2026View
Fig 6.14b Rev 3 RVAA Study Area and Property Locations (S)Supporting Information30 Apr 2026View
Fig 6.14a Rev 3 RVAA Study Area and Property Locations (N)Supporting Information30 Apr 2026View
Fig 6.7 Rev 3 Assessment Viewpoint LocationsSupporting Information30 Apr 2026View
Appendix I - Crane Hardstanding Design and Access StatementSupporting Information30 Apr 2026View
Appendix G - Updated Flood Risk Assessment and Drainage AssessmentSupporting Information30 Apr 2026View
Appendix H - Crane Hardstanding Decision NoticeSupporting Information30 Apr 2026View
Appendix F - Draft Conditions Prepared by the ApplicantSupporting Information30 Apr 2026View
Appendix D - Response to the LDA Design Review of Landscape and Visual EffectsSupporting Information30 Apr 2026View
Appendix C - ES Addendum A - Assessment of Effects for Designated Sites and Ornithology - CopySupporting Information30 Apr 2026View
Appendix B - Response to Historic EnglandSupporting Information30 Apr 2026View
Cover Letter - RedactedSupporting Information30 Apr 2026View
Response to EA ObjectionSupporting Information30 Apr 2026View
Consultation Response Document excl appendices B - ISupporting Information30 Apr 2026View
Consultation Response Document - RedactedSupporting Information30 Apr 2026View
Technical Appendix 8.1 Flood Risk Assessment And Drainage AssessmentSupporting Information30 Apr 2026View
Response to Essex HighwaysSupporting Information29 Apr 2026View
ArcheologyConsultation Response29 Apr 2026View
Office For Nuclear RegulationConsultation Response27 Apr 2026View
National GridConsultation Response27 Apr 2026View
National HighwaysConsultation Response27 Apr 2026View
Crouch Harbour AuthorityConsultation Response22 Apr 2026View
NATSConsultation Response21 Apr 2026View
London Southend AirportConsultation Response21 Apr 2026View
Economic DevelopmentConsultation Response21 Apr 2026View
Environmental HealthConsultation Response16 Apr 2026View
Environment AgencyConsultation Response16 Apr 2026View
SUDSConsultation Response16 Apr 2026View
NHSConsultation Response15 Apr 2026View
Ministry Of DefenceConsultation Response15 Apr 2026View
London Stansted AirportConsultation Response15 Apr 2026View
Health And Safety ExecutiveConsultation Response15 Apr 2026View
25-01022 sn x12Site Notice13 Apr 2026View
16100A-30-R21-01-F - Habitats regulations assessment - report to inform appropriate assessmentSupporting Information13 Apr 2026View
16100A-30-R046-01-F01-ES Addendum C Consideration of the grid connection Cable RouteSupporting Information13 Apr 2026View
16100A-30-R18-01-F ES Addendum B - Assessment of effects for BatsSupporting Information13 Apr 2026View
16100A-30-R16-02-F ES Addendum Appendix B2 Bat collision risk modelling reportSupporting Information13 Apr 2026View
16100A-30-R07-01-F-ES Addendum Appendix B1 Autumn 2025 Bat reportSupporting Information13 Apr 2026View
Appendix 7.7 - Construction Mitigation Monitoring Strategy - 16100A-30-R12-02-FSupporting Information13 Apr 2026View
16100A-30-R13-02-F - ES Volume 3 Appendix 7.6 oLEMP - April 26 update IssueSupporting Information13 Apr 2026View
Please select download file to viewBNG (Excel) Matrix Calcs13 Apr 2026View
16100A-30-R11-03- ES Volume 3 Appendix 7.5 BNG Report note April UpdateSupporting Information13 Apr 2026View
16100A-30-R22-01-F - Appendix A3 Consultation ResponsesSupporting Information13 Apr 2026View
16100A-30-R10-02-F - ES Addendum A Appendix A2 Collision risk modelling ReportSupporting Information13 Apr 2026View
Annex A6_compressedSupporting Information13 Apr 2026View
Annex A7_compressedSupporting Information13 Apr 2026View
Annex A8_compressedSupporting Information13 Apr 2026View
Annex A5_compressedSupporting Information13 Apr 2026View
ES Addendum Appendix A1 - 16100A-R17-01-F- ES Winter Bird Report 2025-26Supporting Information13 Apr 2026View
16100A-30-R19-01-F - ES Addendum A - Assessment of Effects for Designated Sites and OrnithologySupporting Information13 Apr 2026View
ESSW1-PER-260410 ES Addendum Covering Letter Rev 1_RedactedSupporting Information13 Apr 2026View
Appendix C - SK103 Rev P1 - Indicative Substation Drainage ArrangementSupporting Information1 Apr 2026View
Appendix A - Letter From Flood and Water Management TeamSupporting Information1 Apr 2026View
Appendix B SK101 Rev P1 - Indicative Hardstanding Drainage ArrangementSupporting Information1 Apr 2026View
Appendix B SK102 Rev P1 - Indicative Trackside Drainage ArrangementSupporting Information1 Apr 2026View
Econ Dev responseConsultation Response12 Mar 2026View
Conservation responseConsultation Response12 Mar 2026View
- W. Mortimer And Hazeleigh Parish CouncilConsultation Response23 Feb 2026View
Appendix A - Letter from ECC Flood OfficerFlood risk Assessment Appendices10 Feb 2026View
Appendix C - Indicative Substation Drainage ArrangementFlood risk Assessment Appendices10 Feb 2026View
Appendix B - Indicative Hardstanding Drainage ArrangementFlood risk Assessment Appendices10 Feb 2026View
Historic England ResponseConsultation Response4 Feb 2026View
Environmental Health ResponseConsultation Response4 Feb 2026View
SuDSConsultation Response3 Feb 2026View
Burnham on Crouch Town CouncilConsultation Response3 Feb 2026View
South Woodham Ferrers Town Parish CouncilConsultation Response28 Jan 2026View
Ecology Response SummaryConsultation Response26 Jan 2026View
Essex Wildlife Trust ResponseConsultation Response22 Jan 2026View
Cold Norton Parish CouncilConsultation Response21 Jan 2026View
Ministry Of Defence ResponseConsultation Response21 Jan 2026View
Archaeological ResponseConsultation Response20 Jan 2026View
North Fambridge Parish Council ResponseConsultation Response20 Jan 2026View
RSPB ResponseConsultation Response20 Jan 2026View
Asheldham & Dengie Parish Council ResponseConsultation Response13 Jan 2026View
NHS Estate ResponseConsultation Response9 Jan 2026View
Green Infrastructure ResponseConsultation Response6 Jan 2026View
National Highways ResponseConsultation Response31 Dec 2025View
National Grid ResponseConsultation Response24 Dec 2025View
Essex Bridleways ResponseConsultation Response23 Dec 2025View
London Southend Airport ResponseConsultation Response23 Dec 2025View
Danbury Parish Council ResponseConsultation Response23 Dec 2025View
Stansted Airport ResponseConsultation Response22 Dec 2025View
Althorne Parish Council ResponseConsultation Response22 Dec 2025View
Crouch Harbour ResponseConsultation Response18 Dec 2025View
SPC responseConsultation Response17 Dec 2025View
Port of London Authority responseConsultation Response17 Dec 2025View
Newspaper advert 11 December 2025Newspaper clipping17 Dec 2025View
Mayland Parish Council ResponseConsultation Response16 Dec 2025View
Arboricultural ResponseConsultation Response16 Dec 2025View
Purleigh Parish Council ResponseConsultation Response16 Dec 2025View
OFCOM responseConsultation Response10 Dec 2025View
ES Volume 1 Main TextSupporting Information10 Dec 2025View
Att 1 - NATS response Technical and Operational AssessmentConsultation Response9 Dec 2025View
NATS safeguarding response with attachmentConsultation Response9 Dec 2025View
Marine management servicesConsultation Response9 Dec 2025View
Minerals and Waste responseConsultation Response9 Dec 2025View
HSE responseConsultation Response9 Dec 2025View
10110097_001 Rev P6 - INFRASTRUCTURE LAYOUT CONSTRUCTION PHASELocation/Site Plan27 Nov 2025View
Planning Application Submission DocumentsSupporting Information20 Nov 2025View
ES Volume 3 Appendix 6.6 Residential Visual Amenity Assessment Part 2 of 2 Property AssessmentSupporting Information20 Nov 2025View
ES Volume 3 Appendix 6.1 Landscape Seascape & Visual Impact Assessment Methodology & CriteriaSupporting Information20 Nov 2025View
Statement of Community InvolvementSupporting Information20 Nov 2025View
Shadow Flicker AssessmentSupporting Information20 Nov 2025View
Planning Statement - CopySupporting Information20 Nov 2025View
Non-Technical Summary (1) - Copy ReducedSupporting Information20 Nov 2025View
ES Volume 3 Appendix 16.1 Long List of Cumulative DevelopmentsSupporting Information20 Nov 2025View
ES Volume 3 Appendix 11.1 Operational NoiseSupporting Information20 Nov 2025View
ES Volume 3 Appendix 14.1 GHG Background DataSupporting Information20 Nov 2025View
ES Volume 3 Appendix 10.1 Transport AssessmentSupporting Information20 Nov 2025View
ES Volume 3 Appendix 9.2 Geophysical Survey to Map Potential Archaeological FeaturesSupporting Information20 Nov 2025View
ES Volume 3 Appendix 9.1 Archaeological Desk-Based Assessment and Stage 1 Setting AssessmentSupporting Information20 Nov 2025View
ES Volume 3 Appendix 8.1 Flood Risk Assessment and Drainage AssessmentSupporting Information20 Nov 2025View
ES Volume 3 Appendix 7.9 Summary of Scoped Out Ecological FeaturesSupporting Information20 Nov 2025View
ES Volume 3 Appendix 7.8 Bat Survey Baseline ReportSupporting Information20 Nov 2025View
ES Volume 3 Appendix 7.7 Draft Collision Monitoring and Mitigation StrategySupporting Information20 Nov 2025View
ES Volume 3 Appendix 7.6 outline Landscape and Ecology Management Plan (oLEMP) - CopySupporting Information20 Nov 2025View
ES Volume 3 Appendix 7.5 Biodiversity Net Gain Information NoteSupporting Information20 Nov 2025View
ES Volume 3 Appendix 7.4 Collision Risk Modelling for Birds (2024-2025)Supporting Information20 Nov 2025View
ES Volume 3 Appendix 7.3 Breeding Bird Survey Reports (2024 and 2025)Supporting Information20 Nov 2025View
ES Volume 3 Appendix 7.2 Winter Bird Survey Reports (2022-2024 and 2024-2025)Supporting Information20 Nov 2025View
ES Volume 3 Appendix 7.1 Terrestrial Ecology Baseline - CopySupporting Information20 Nov 2025View
ES Volume 3 Appendix 6.7 Nighttime Landscape and Visual EffectsSupporting Information20 Nov 2025View
ES Volume 3 Appendix 6.6 Residential Visual Amenity Assessment Part 1 of 2Supporting Information20 Nov 2025View
ES Volume 3 Appendix 6.4 Landscape Seascape Sensitivity AppraisalSupporting Information20 Nov 2025View
ES Volume 3 Appendix 6.5 Viewpoint AnalysisSupporting Information20 Nov 2025View
ES Volume 3 Appendix 6.2 Baseline Landscape Character AnalysisSupporting Information20 Nov 2025View
ES Volume 3 Appendix 6.3 Baseline Seascape Character AnalysisSupporting Information20 Nov 2025View
ES Volume 3 Appendix 3.1 outline Construction and Decommissioning Environmental Management PlanSupporting Information20 Nov 2025View
ES Volume 3 Appendix 2.2 EIA Scoping OpinionSupporting Information20 Nov 2025View
ES Volume 3 Appendix 2.1 EIA Scoping Report - CopySupporting Information20 Nov 2025View
Covering LetterSupporting Information20 Nov 2025View
Design and Access StatementSupporting Information20 Nov 2025View
Biodiversity Checklist - CopySupporting Information20 Nov 2025View
Aviation and Telecommunications Technical ReportSupporting Information20 Nov 2025View
Figure 5.1 Environmental ConstraintsSupporting Information20 Nov 2025View
Figure 9.2 Rev 03 Designated Heritage AssetsSupporting Information20 Nov 2025View
Post-Development Habitat Retention Turbines 11 12 14 and 15Supporting Information20 Nov 2025View
Post-Development Habitat Retention Turbines 9 10 and 13Supporting Information20 Nov 2025View
Post-Development Habitat Retention Turbines 7 and 8Supporting Information20 Nov 2025View
Post-Development Habitat Retention Turbines 5 and 6Supporting Information20 Nov 2025View
Post-Development Habitat Retention Turbines 3 and 4Supporting Information20 Nov 2025View
Post-Development Habitat Retention Turbines 1 and 2Supporting Information20 Nov 2025View
Post-Development Habitat Retention Access & Layout Areas (South)Supporting Information20 Nov 2025View
Post-Development Habitat Retention Access & Laydown Areas (Central)Supporting Information20 Nov 2025View
Figure 16.1 Rev 02 Long List of Other DevelopmentsSupporting Information20 Nov 2025View
Figure 13.1 Rev 01 Sensitive ReceptorsSupporting Information20 Nov 2025View
Figure 15.1 Rev 02 Human Health Study AreaSupporting Information20 Nov 2025View
Figure 10.4 Rev 02 Abnormal Invisible Load RouteSupporting Information20 Nov 2025View
Figure 10.3 Rev 02 Personal Injury Accident LocationsSupporting Information20 Nov 2025View
Figure 10.2 Rev 02 Traffic Count LocationsSupporting Information20 Nov 2025View
Figure 10.1 Rev 02 Study AreaSupporting Information20 Nov 2025View
Figure 9.3 Rev 02 Non-designated Heritage Assets which are sensitive to setting effectsSupporting Information20 Nov 2025View
15165C-20-I06-01 Rev 02 Figure 11.6 Construction Traffic Noise Study AreaSupporting Information20 Nov 2025View
15165C-20-I05-01 Rev 02 Figure 11.5 Non-Wind Turbine Operational Noise Study AreaSupporting Information20 Nov 2025View
15165C-20-I04-01 Rev 02 Figure 11.4 Construction Noise Study AreaSupporting Information20 Nov 2025View
15165C-20-I03-01 Rev 02 Figure 11.3 Noise Sensitive Receptors and Cumulative DevelopmentsSupporting Information20 Nov 2025View
15165C-20-I02-01 Rev 02 Figure 11.2 Proposed Turbines NSRs and Monitoring LocationsSupporting Information20 Nov 2025View
15165C-20-I01-01 Rev 02 Figure 11.1 35dB LA90 Operational Noise Study AreaSupporting Information20 Nov 2025View
Figure 9.1 Rev 05 Heritage Assets present within the Scoping BoundarySupporting Information20 Nov 2025View
Figure 8.1 Rev 02 Site LocationSupporting Information20 Nov 2025View
Figure 7.7f Rev 02 Lapwing flight lines 2024 2025Supporting Information20 Nov 2025View
Figure 7.7e Rev 02 Lapwing Distribution 2023 2034 and 2024 2025Supporting Information20 Nov 2025View
Figure 7.7d Rev 02 Golden Plover flight lines 2024 2025Supporting Information20 Nov 2025View
Figure 7.7c Rev 02 Golden Plover distribution 2023 2024 and 2024 2025Supporting Information20 Nov 2025View
Figure 7.7b Rev 02 Dark-bellied brent goose flight lines 2024 2025Supporting Information20 Nov 2025View
Figure 7.6 Rev 02 Location of vantage points for bird surveys and 2km viewshedsSupporting Information20 Nov 2025View
Figure 7.7a Rev 02 Dark-bellied brent goose distribution 2023 2024 and 2024 2025Supporting Information20 Nov 2025View
Figure 7.5 Rev 02 Location of bat transect surveys and static detectors 2024 and 2025Supporting Information20 Nov 2025View
Figure 7.4d Rev 02 Baseline habitats (UK Habitat Classification)Supporting Information20 Nov 2025View
Figure 7.4b Rev 02 Baseline habitats (UK Habitat Classification)Supporting Information20 Nov 2025View
Figure 7.4c Rev 02 Baseline habitats (UK Habitat Classification)Supporting Information20 Nov 2025View
Figure 7.4a Rev 02 Baseline habitats (UK Habitat Classification)Supporting Information20 Nov 2025View
Figure 7.3 Rev 01 Non-Statutory Designated Sites within the Study AreaSupporting Information20 Nov 2025View
Figure 7.2b Rev 02 Statutory Designated Sites within the Study Area - National SitesSupporting Information20 Nov 2025View
Figure 7.2a Rev 02 Statutory Designated Sites within the Study Area - International SitesSupporting Information20 Nov 2025View
Figure 7.1 Rev 02 Biodiversity Study AreaSupporting Information20 Nov 2025View
Figure 6.23 Rev 1 Bare Earth Wind Aviation Lighting ZTVSupporting Information20 Nov 2025View
Figure 6.22 Rev 2 Cumulative ZTV - 7 of 7Supporting Information20 Nov 2025View
Figure 6.21 Rev 2 Cumulative ZTV - 6 of 7Supporting Information20 Nov 2025View
Figure 6.20 Rev 2 Cumulative ZTV - 5 of 7Supporting Information20 Nov 2025View
Figure 6.19 Rev 2 Cumulative ZTV - 4 of 7Supporting Information20 Nov 2025View
Figure 6.18 Rev 2 Cumulative ZTV - 3 of 7Supporting Information20 Nov 2025View
Figure 6.17 Rev 2 Cumulative ZTV - 2 of 7Supporting Information20 Nov 2025View
Figure 6.16 Rev 2 Cumulative ZTV - 1 of 7Supporting Information20 Nov 2025View
Figure 6.15 Rev 2 Cumulative Windfarm Sites Location PlanSupporting Information20 Nov 2025View
Figure 6.14b Rev 2 RVAA Study Area and Property Locations (S)Supporting Information20 Nov 2025View
Figure 6.14a Rev 2 RVAA Study Area and Property Locations (N)Supporting Information20 Nov 2025View
Figure 6.13 Rev 2 15km Screened ZTV Blade Tip HeightSupporting Information20 Nov 2025View
Figure 6.12 Rev 2 15km Screened ZTV Hub HeightSupporting Information20 Nov 2025View
Figure 6.11 Rev 2 45km Screened ZTV Blade Tip HeightSupporting Information20 Nov 2025View
Figure 6.10 Rev 2 45km Screened ZTV Hub HeightSupporting Information20 Nov 2025View
Figure 6.9 Rev 2 45km Bare Earth ZTV Blade Tip HeightSupporting Information20 Nov 2025View
Figure 6.8 Rev 2 45km Bare Earth ZTV Hub HeightSupporting Information20 Nov 2025View
Figure 6.7 Rev 2 Assessment Viewpoint LocationsSupporting Information20 Nov 2025View
Figure 6.6 Rev 2 Rochford District Landscape Character AreasSupporting Information20 Nov 2025View
Figure 6.5 Rev 2 Maldon District Landscape Character AreasSupporting Information20 Nov 2025View
Figure 6.4 Rev 2 Essex Landscape Character AreasSupporting Information20 Nov 2025View
Figure 6.3 Rev 2 National Character Areas and Marine Character AreasSupporting Information20 Nov 2025View
Figure 6.2 Rev 2 Landscape TopographySupporting Information20 Nov 2025View
Figure 6.1 Rev 2 Landscape Context and DesignationsSupporting Information20 Nov 2025View
Figure 4.2 Rev 03 - Proposed Development LayoutSupporting Information20 Nov 2025View
Figure 3.1 Rev 03 - Site Location PlanSupporting Information20 Nov 2025View
10110097_002 Rev P5 - Typical Turnine FoundationMulti Plans20 Nov 2025View
10110097_001 Rev P5 - Typical Turbine ElevationMulti Plans20 Nov 2025View
10110097_004 Rev P5 - Typical Existing Road WideningMulti Plans20 Nov 2025View
10110097_003 Rev P5 - Typical Turbine Hardstanding 200m Tip HeightMulti Plans20 Nov 2025View
10110097_007 Rev P5 - Proposed Construction & Batching CompoundMulti Plans20 Nov 2025View
10110097_006 Rev P5 - Typical Watercourse Crossing MethodsMulti Plans20 Nov 2025View
10110097_005 Rev P5 - Typical TrackMulti Plans20 Nov 2025View
10110097_008 Rev P5 - Proposed Substation CompoundMulti Plans20 Nov 2025View
0991-SHRSK-XX-XX-DR-L-1000 Rev 00 - Substation Landscape Mitigation MasterplanLocation/Site Plan20 Nov 2025View
ESSW1-ENG-250811-01 Rev 6 Red Line BoundaryLocation/Site Plan20 Nov 2025View
0991-SHRSK-XX-XX-DR-L-1000 Rev 01 - Figure 4.3 Substation Landscape Mitigation PlanLocation/Site Plan20 Nov 2025View
10110097_002 Rev P6 Infrastructure Layout Operational PhaseLocation/Site Plan20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 3 KC III (Sandbeach Outfall) Baseline Visualisation 3aIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 3 KC III (Sandbeach Outfall) Baseline Visualisation 3bIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 3 KC III (Sandbeach Outfall) Baseline Visualisation 3cIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 3 KC III (Sandbeach Outfall) Baseline Visualisation 3dIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 3 KC III (Sandbeach Outfall) Wireline Visualisation 3eIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 3 KC III (Sandbeach Outfall) Photomontage Visualisation 3fIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 4 KC III (WW2 Observation Pond) Baseline Visualisation 4aIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 4 KC III (WW2 Observation Pond) Baseline Visualisation 4bIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 4 KC III (WW2 Observation Pond) Baseline Visualisation 4cIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 4 KC III (WW2 Observation Pond) Baseline Visualisation 4dIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 4 KC III (WW2 Observation Pond) Wireline Visualisation 4eIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 4 KC III (WW2 Observation Pond) Photomontage Visualisation 4fIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 10 Wallasea Island Project Photomontage Visualisation 10fIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 13 KCIII Coast Path - South of GH Baseline Visualisation 13aIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 13 KCIII Coast Path - South of GH Baseline Visualisation 13bIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 13 KCIII Coast Path - South of GH Baseline Visualisation 13cIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 13 KCIII Coast Path - South of GH Baseline Visualisation 13dIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 13 KCIII Coast Path - South of GH Wireline Visualisation 13eIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 13 KCIII Coast Path - South of GH Photowireline Visualisation 13fIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Viewpoint 4 Marshhouse Decoy Pond Photomontage Visualisation 4fIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 1 Old Monstale Farm Baseline Visualisation 1aIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 1 Old Monstale Farm Baseline Visualisation 1bIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 1 Old Monstale Farm Baseline Visualisation 1cIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 1 Old Monstale Farm Baseline Visualisation 1dIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 1 Old Monstale Farm Baseline Visualisation 1fIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 1 Old Monstale Farm Baseline Visualisation 1eIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 1 Old Monstale Farm Wireline Visualisation 1gIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 1 Old Monstale Farm Photomontage Visualisation 1hIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 2 Court Farm Baseline Visualisation 2aIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 2 Court Farm Baseline Visualisation 2bIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 2 Court Farm Baseline Visualisation 2cIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 2 Court Farm Baseline Visualisation 2dIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 2 Court Farm Photomontage Visualisation 2fIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 2 Court Farm wireline Visualisation 2eIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 2 Court Farm Photomontage Visualisation 2hIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 2 Court Farm Wireline Visualisation 2gIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 2 Court Farm Photomontage Visualisation 2jIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 2 Court Farm Wireline Visualisation 2iIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 3 Bridgewick Farm Baseline Visualisation 3aIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 3 Bridgewick Farm Baseline Visualisation 3bIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 3 Bridgewick Farm Baseline Visualisation 3cIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 3 Bridgewick Farm Baseline Visualisation 3dIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 3 Bridgewick Farm Photomontage Visualisation 3fIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 3 Bridgewick Farm Wireline Visualisation 3eIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 3 Bridgewick Farm Photomontage Visualisation 3hIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 3 Bridgewick Farm Wireline Visualisation 3gIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 3 Bridgewick Farm Wireline Visualisation 3iIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 3 Bridgewick Farm Photomontage Visualisation 3jIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 4 Marshhouse Decoy Pond Baseline Visualisation 4aIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 4 Marshhouse Decoy Pond Baseline Visualisation 4bIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 4 Marshhouse Decoy Pond Baseline Visualisation 4cIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 4 Marshhouse Decoy Pond Baseline Visualisation 4dIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 4 Marshhouse Decoy Pond Wireline Visualisation 4eIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 5 Grange Road Baseline Visualisation 5aIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 5 Grange Road Baseline Visualisation 5bIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 5 Grange Road Baseline Visualisation 5cIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 5 Grange Road Baseline Visualisation 5dIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 5 Grange Road Wireine Visualisation 5eIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 5 Grange Road Photomontage Visualisation 5fIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 5 Grange Road Wireline Visualisation 5gIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 5 Grange Road Photomontage Visualisation 5hIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 6 Tillingham Church Baseline Visualisation 6aIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 6 Tillingham Church Baseline Visualisation 6bIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 6 Tillingham Church Baseline Visualisation 6cIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 6 Tillingham Church Baseline Visualisation 6dIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 6 Tillingham Church Wireline Visualisation 6eIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 6 Tillingham Church Photomontage Visualisation 6fIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 7 Asheldham Baseline Visualisation 7aIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 7 Asheldham Baseline Visualisation 7bIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 7 Asheldham Baseline Visualisation 7cIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 7 Asheldham Baseline Visualisation 7dIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 7 Asheldham Photowireline Visualisation 7fIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 7 Asheldham Wireline Visualisation 7eIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 7 Asheldham Photomontage Visualisation 7fIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 7 Asheldham Wireline Visualisation 7gIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 7 Asheldham Photowireline Visualisation 7hIllustrative drawings20 Nov 2025View
0991-CH-Visuals - Cultural Heritage Viewpoint 7 Asheldham Photomontage Visualisation 7hIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 1 KCIII Coast Path - Coate Outfall Baseline Visualisation 1aIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 1 KCIII Coast Path - Coate Outfall Baseline Visualisation 1bIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 1 KCIII Coast Path - Coate Outfall Baseline Visualisation 1cIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 1 KCIII Coast Path - Coate Outfall Baseline Visualisation 1dIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 1 KCIII Coast Path - Coate Outfall Photomontage Visualisation 1fIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 1 KCIII Coast Path - Coate Outfall Wireline Visualisation 1eIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 1 KCIII Coast Path - Coate Outfall Wireline Visualisation 1gIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 1 KCIII Coast Path - Coate Outfall Photomontage Visualisation 1hIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 1 KCIII Coast Path - Coate Outfall Wireline Visualisation 1iIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 1 KCIII Coast Path - Coate Outfall Photomontage Visualisation 1jIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 2 Grange Road - Tillingham Marshes Baseline Visualisation 2aIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 2 Grange Road - Tillingham Marshes Baseline Visualisation 2bIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 2 Grange Road - Tillingham Marshes Baseline Visualisation 2cIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 2 Grange Road - Tillingham Marshes Baseline Visualisation 2dIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 2 Grange Road - Tillingham Marshes Photomontage Visualisation 2fIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 2 Grange Road - Tillingham Marshes Wireline Visualisation 2eIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 2 Grange Road - Tillingham Marshes Photomontage Visualisation 2hIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 2 Grange Road - Tillingham Marshes Wireline Visualisation 2gIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 5 Turncole Farm Baseline Visualisation 5aIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 5 Turncole Farm Baseline Visualisation 5bIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 5 Turncole Farm Baseline Visualisation 5cIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 5 Turncole Farm Baseline Visualisation 5dIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 5 Turncole Farm Photomontage Visualisation 5fIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 5 Turncole Farm Wireline Visualisation 5eIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 5 Turncole Farm Photomontage Visualisation 5hIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 5 Turncole Farm Wireline Visualisation 5gIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 6 Tillingham Baseline Visualisation 6aIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 6 Tillingham Baseline Visualisation 6bIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 6 Tillingham Baseline Visualisation 6cIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 6 Tillingham Baseline Visualisation 6dIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 6 Tillingham Photomontage Visualisation 6fIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 6 Tillingham Wireline Visualisation 6eIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 6 Tillingham (Night) Photomontage Visualisation 6gIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 7 Southminster Baseline Visualisation 7aIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 7 Southminster Baseline Visualisation 7bIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 7 Southminster Baseline Visualisation 7cIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 7 Southminster Baseline Visualisation 7dIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 7 Southminster Photomontage Visualisation 7fIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 7 Southminster Wireline Visualisation 7eIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 8 Chapel of St Peter-on-the-wall Baseline Visualisation 8aIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 8 Chapel of St Peter-on-the-wall Baseline Visualisation 8bIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 8 Chapel of St Peter-on-the-wall Baseline Visualisation 8cIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 8 Chapel of St Peter-on-the-wall Baseline Visualisation 8dIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 8 Chapel of St Peter-on-the-wall Photomontage Visualisation 8fIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 8 Chapel of St Peter-on-the-wall Wireline Visualisation 8eIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 9 Burnham On Crouch Photomontage Visualisation 9fIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 9 Burnham On Crouch Wireline Visualisation 9eIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 9 Burnham On Crouch (Night) Photomontage Visualisation 9gIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 9 Burnham On Crouch Baseline Visualisation 9aIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 9 Burnham On Crouch Baseline Visualisation 9bIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 9 Burnham On Crouch Baseline Visualisation 9cIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 9 Burnham On Crouch Baseline Visualisation 9dIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 10 Wallasea Island Wild Coast Project Baseline Visualisation 10aIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 10 Wallasea Island Wild Coast Project Baseline Visualisation 10bIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 10 Wallasea Island Wild Coast Project Baseline Visualisation 10cIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 10 Wallasea Island Wild Coast Project Baseline Visualisation 10dIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 10 Wallasea Island Wild Coast Project Wireline Visualisation 10eIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 11 Tollesbury Baseline Visualisation 11aIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 11 Tollesbury Baseline Visualisation 11bIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 11 Tollesbury Baseline Visualisation 11cIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 11 Tollesbury Baseline Visualisation 11dIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 11 Tollesbury Photomontage Visualisation 11fIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 11 Tollesbury Wireline Visualisation 11eIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 12 Mayland Hill Baseline Visualisation 12aIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 12 Mayland Hill Baseline Visualisation 12bIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 12 Mayland Hill Baseline Visualisation 12cIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 12 Mayland Hill Baseline Visualisation 12dIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 12 Mayland Hill Photomontage Visualisation 12fIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 12 Mayland Hill Wireline Visualisation 12eIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 14 Canewdon Photowireline Visualisation 14fIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 14 Canewdon Wireline Visualisation 14eIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 14 Canewdon Baseline Visualisation 14aIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 14 Canewdon Baseline Visualisation 14bIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 14 Canewdon Baseline Visualisation 14cIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 14 Canewdon Baseline Visualisation 14dIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 15 East Mersea Baseline Visualisation 15aIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 15 East Mersea Baseline Visualisation 15bIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 15 East Mersea Baseline Visualisation 15dIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 15 East Mersea Baseline Visualisation 15cIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 15 East Mersea Photowireline Visualisation 15fIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 15 East Mersea Wireline Visualisation 15eIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 16 St Osyth Beach Baseline Visualisation 16aIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 16 St Osyth Beach Baseline Visualisation 16bIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 16 St Osyth Beach Baseline Visualisation 16cIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 16 St Osyth Beach Baseline Visualisation 16dIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 16 St Osyth Beach Photowireline Visualisation 16fIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 16 St Osyth Beach Wireline Visualisation 16eIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 17 KCIII Coast Path - Maldon Baseline Visualisation 17aIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 17 KCIII Coast Path - Maldon Baseline Visualisation 17bIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 17 KCIII Coast Path - Maldon Baseline Visualisation 17cIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 17 KCIII Coast Path - Maldon Baseline Visualisation 17dIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 17 KCIII Coast Path - Maldon Wireline Visualisation 17eIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 17 KCIII Coast Path - Maldon Photowireline Visualisation 17fIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 18 Southend On Sea Wireline Visualisation 18eIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 18 Southend On Sea Photowireline Visualisation 18fIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals - Viewpoint 19 Beacon Hill - Great Totham Baseline Visualisation 19aIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals Viewpoint 19 Beacon Hill - Great Totham Baseline Visualisation 19bIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals Viewpoint 19 Beacon Hill - Great Totham Baseline Visualisation 19cIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals Viewpoint 19 Beacon Hill - Great Totham Baseline Visualisation 19dIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals Viewpoint 19 Beacon Hill - Great Totham Wireline Visualisation 19eIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals Viewpoint 19 Beacon Hill - Great Totham Photowireline Visualisation 19fIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals Viewpoint 20 Clacton Pier Baseline Visualisation 20aIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals Viewpoint 20 Clacton Pier Baseline Visualisation 20bIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals Viewpoint 20 Clacton Pier Baseline Visualisation 20cIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals Viewpoint 20 Clacton Pier Baseline Visualisation 20dIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals Viewpoint 20 Clacton Pier Wireline Visualisation 20eIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals Viewpoint 20 Clacton Pier Photowireline Visualisation 20fIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals Viewpoint 21 West Mersea Baseline Visualisation 21aIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals Viewpoint 21 West Mersea Baseline Visualisation 21bIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals Viewpoint 21 West Mersea Baseline Visualisation 21cIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals Viewpoint 21 West Mersea Baseline Visualisation 21dIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals Viewpoint 21 West Mersea Photomontage Visualisation 21fIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals Viewpoint 21 West Mersea Wireline Visualisation 21eIllustrative drawings20 Nov 2025View
0991-LVIA-Visuals Viewpoint 21 West Mersea (Night) Photomontage Visualisation 21gIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 2 Convey Hall Existing ViewIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 2 Convey Hall Photowireline DrawingIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 4 New Montsale Existing ViewIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 4 New Montsale Photowireline DrawingIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 5 Montsale Barn Existing ViewIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 5 Montale Barn Photowireline DrawingIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 6a Old Montsale Farm Existing ViewIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 6a Old Montsale Farm Photowireline DrawingIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 6b Old Montsale Farm Existing ViewIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 6b Old Montsale Farm Photowireline DrawingIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 8a Middlewick Lodge Existing ViewIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 8a Middlewick Lodge Photowireline DrawingIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 8b Middlewick Lodge Existing ViewIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 8b Middlewick Lodge Photowireline DrawingIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 9a Court Farm House Existing ViewIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 9a Court Farm House Photowireline DrawingIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 9b Court Farm House Existing ViewIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 9b Court Farm House Photowireline DrawingIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 11a Bridgewick Farmhouse North Existing ViewIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 11a Bridgewick Farmhouse North Photowireline DrawingIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 11b Bridgewick Farmhouse North Existing ViewIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 11b Bridgewick Farmhouse North Photowireline DrawingIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 12a Brook Farm Existing ViewIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 12a Brook Farm Photowireline DrawingIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 12b Brook Farm Existing ViewIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 12b Brook Farm Photowireline DrawingIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 14a 1 Brook Cottage Existing ViewIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 14a 1 Brook Cottage Photowireline DrawingIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 14b 1 Brook Cottage Farm Existing ViewIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 14b 1 Brook Cottage Photowireline DrawingIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 18a 2 East Ware Cottages Existing ViewIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 18b 2 East Ware Cottages Existing ViewIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 18a 2 East Ware Cottages Photowireline DrawingIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 18b 2 East Ware Cottages Photowireline DrawingIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 17a 3 East Ware Cottages Existing ViewIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 17a 3 East Ware Cottages Photowireline DrawingIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 17b 3 East Ware Cottages Existing ViewIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 17b 3 East Ware Cottages Photowireline DrawingIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 18a Grange House Existing ViewIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 18a Grange House Photowireline DrawingIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 19b Grange House Existing ViewIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 19b Grange House Photowireline DrawingIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 20a Little Grange Existing ViewIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 20a Little Grange Photowireline DrawingIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 20b Little Grange Existing ViewIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 20b Little Grange Photwireline DrawingIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 21 Howe Farmhouse Existing ViewIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 21 Howe Farmhouse Photowireline DrawingIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 22 Howe Farm Cottage Existing ViewIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 22 Howe Farm Cottage Photowireline DrawingIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 23 3 Marsh House Cottage Existing ViewIllustrative drawings20 Nov 2025View
0991-RVAA-VP's Resdiential Viewpoint 23 3 Marsh House Cottage Photowireline DrawingIllustrative drawings20 Nov 2025View
ApplicationFormRedactedPlanning Application Form19 Nov 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Refused
Refused - 3.8.26 - 25-01022-FULM Appendix H - Crane Hardstanding Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.