Council planning record

Variation of conditions 2 (plans), 15 (visibility splays), 16 (construction traffic management plan, 17 (route mitigation plan) and 18 (arboricultural method statement and tree protection plan) from approved planning permission 23/01236/FULM (Erection of a 19 MW Solar PV Array, comprising ground mounted solar PV panels, with co-located 5 MW battery energy storage system (BESS), vehicular access from Keelings Road, internal access tracks, landscaping and associated infrastructure including security fencing, CCTV cameras, and grid connection infrastructure including transformers, substation compound buildings and cabling route to the point of connection) - Revisions to the surface material of the access track.

Land To The South Of Keelings Road Dengie Essex

Application approvedReference: 25/00406/VARMMaldon District Council

Last published check: 28 Sept 2026, 23:55. Check the council record for more recent changes.

Application location

Land To The South Of Keelings Road Dengie Essex

This record has no verified map location.

View council map

Application summary

Status
Application approved
Application type
Variations Major
Received
9 Apr 2025
Validated
24 Apr 2025
Determination deadline
24 Jul 2025
Local authority
Maldon District Council

Application overview

Variation of conditions 2 (plans), 15 (visibility splays), 16 (construction traffic management plan, 17 (route mitigation plan) and 18 (arboricultural method statement and tree protection plan) from approved planning permission 23/01236/FULM (Erection of a 19 MW Solar PV Array, comprising ground mounted solar PV panels, with co-located 5 MW battery energy storage system (BESS), vehicular access from Keelings Road, internal access tracks, landscaping and associated infrastructure including security fencing, CCTV cameras, and grid connection infrastructure including transformers, substation compound buildings and cabling route to the point of connection) - Revisions to the surface material of the access track.

Proposal details

Reference
25/00406/VARM
Ward
Tillingham
Parish
Dengie
Agent
Mr James Flynn - ADAS Planning

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 36 of 36

DocumentPublishedAction
25-00406-VARMDecision Notice24 Jul 2025View
Final officer report 25.00406.VARMFinal Officer Report24 Jul 2025View
3488-TLP-XX-XX-D-L-40001 REV B Northern Boundary SectionMulti Plans23 Jul 2025View
1643-0208-10 REV 03 Access Road SectionsMulti Plans23 Jul 2025View
1643-0208-50 REV 01 33kV Private SwitchgearMulti Plans23 Jul 2025View
1643-0208-74 REV 01 33kV UKPN DNOMulti Plans23 Jul 2025View
1643-0207-40 REV 01 Spares Container DetailMulti Plans23 Jul 2025View
1643-0207-41 REV 02 Welfare Container DetailMulti Plans23 Jul 2025View
1643-0207-03 REV 01 Auxiliary LV Switchroom DetailMulti Plans23 Jul 2025View
1643-0207-17 REV 01 Battery Inverter Station DetailMulti Plans23 Jul 2025View
1643-0207-27 REV 01 Battery Storage Unit DetailMulti Plans23 Jul 2025View
1643-0207-00 REV 01 Transformer Station DetailMulti Plans23 Jul 2025View
1643-0207-02 REV 01 Aux Transformer DetailMulti Plans23 Jul 2025View
1643-0204-00 REV 02 CCTV DetailMulti Plans23 Jul 2025View
1643-0205-01 REV 01 Fence DetailMulti Plans23 Jul 2025View
1643-0206-00 REV 01 Mounting System DetailMulti Plans23 Jul 2025View
3488-TLP-XX-XX-D-L-30001 REV I Landscape Softworks PlanLocation/Site Plan23 Jul 2025View
3488-TLP-XX-XX-D-L-10001 REV G Landscape General Arrangement PlanLocation/Site Plan23 Jul 2025View
1643-0201-40 REV 01 Access Track PlanLocation/Site Plan23 Jul 2025View
1643-0201-20 REV 01 Compound LayoutLocation/Site Plan23 Jul 2025View
1643-0201-01 REV 15 Planning LayoutLocation/Site Plan23 Jul 2025View
1643-0200-05 REV 07 Site Location PlanLocation/Site Plan23 Jul 2025View
Letter From Agent 25-00406-VARMSupporting Information14 Jul 2025View
Arboricultural 25.00406.VARMConsultation Response11 Jul 2025View
25-00406-VARM - SCR MATRIXOfficer response25 Jun 2025View
25-00406-VARM - SCR LETTERScreening opinion letter25 Jun 2025View
ADPC responseConsultation Response21 May 2025View
Highways responseConsultation Response6 May 2025View
Newspaper advert dated 01.05.2025Newspaper clipping2 May 2025View
Arboricultural Method StatementArboricultural Impact Assesment14 Apr 2025View
Arboricultural Planning StatementArboricultural Impact Assesment14 Apr 2025View
Construction Traffic Management PlanSupporting Information14 Apr 2025View
Route Mitigation Plan Rev 05Supporting Information14 Apr 2025View
240516-10-SK02 Rev 02 - Proposed Access Junction Indicative Layout Visibility SplaysMulti Plans14 Apr 2025View
Covering LetterCovering Letter from Applicant/Agent14 Apr 2025View
Application Form RedactedPlanning Application Form14 Apr 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Last Site Notice Posted Date

    Published milestoneCouncil source
  5. Last Advertised In Press Date

    Published milestoneCouncil source
  6. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Decision Issued Date

    Published milestoneCouncil source
  9. Decision Made Date

    Published milestoneCouncil source
  10. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approved
25-00406-VARM
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.