Listed Building Consent to remove the existing unauthorised fascia sign and clutter. Install 1no. non-illuminated painted timber fascia sign with hand-painted lettering fixed into mortar joints with minimal reversible stainless steel fixings and making good (Resubmission of 26/502650/LBC).
Listed Building Consent to remove the existing unauthorised fascia sign and clutter. Install 1no. non-illuminated painted timber fascia sign with hand-painted lettering fixed into mortar joints with minimal reversible stainless steel fixings and making good (Resubmission of 26/502650/LBC).
Reference
26/504209/LBC
Alternative references
PP-15342454
Ward
High Street
Agent
JFD Architecture
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.