Council planning record

Hybrid Planning Application for the phased demolition of all existing buildings and structures, site preparation works and the comprehensive employment-led redevelopment of the site comprising: 1) Detailed Planning Application for the construction of flexible employment floorspace (Use Classes E(g)(ii)/(iii), B2 and/or B8, with ancillary office floorspace) and all associated infrastructure works, access arrangements, internal road network, parking, and hard and soft landscaping; and 2) Outline Planning Application (with all matters reserved) for the construction of flexible employment floorspace (Use Classes E(g)(ii)/(iii), B2 and/or B8, with ancillary office floorspace), an on-site training & development facility (Use Classes E(g)(i)/F1(a)), and all associated infrastructure works, access arrangements, internal road network, parking, and hard and soft landscaping. Non Material amendment of planning permission no. 22/01334/HYBEIA dated 12th May 2023 ( Re-distribution of Mezzanine employment floor space from phase 2 to phase 1 and associated external alterations to the elevations.)

Griffin House 5 Osborne Road Luton LU1 3YT

PER - Application PermittedReference: 25/00278/AMENDLuton Borough Council

Last published check: 22 Sept 2026, 00:36. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
PER - Application Permitted
Application type
Non Material Amendments
Received
13 Mar 2025
Validated
13 Mar 2025
Determination deadline
Not published
Local authority
Luton Borough Council

Application overview

Hybrid Planning Application for the phased demolition of all existing buildings and structures, site preparation works and the comprehensive employment-led redevelopment of the site comprising: 1) Detailed Planning Application for the construction of flexible employment floorspace (Use Classes E(g)(ii)/(iii), B2 and/or B8, with ancillary office floorspace) and all associated infrastructure works, access arrangements, internal road network, parking, and hard and soft landscaping; and 2) Outline Planning Application (with all matters reserved) for the construction of flexible employment floorspace (Use Classes E(g)(ii)/(iii), B2 and/or B8, with ancillary office floorspace), an on-site training & development facility (Use Classes E(g)(i)/F1(a)), and all associated infrastructure works, access arrangements, internal road network, parking, and hard and soft landscaping. Non Material amendment of planning permission no. 22/01334/HYBEIA dated 12th May 2023 ( Re-distribution of Mezzanine employment floor space from phase 2 to phase 1 and associated external alterations to the elevations.)

Proposal details

Reference
25/00278/AMEND
Ward
SOUTH
Agent
Mr Christopher Schiele

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Griffin House 5 Osborne Road Luton LU1 3YT

This record has no verified map location.

View council map

Documents 28 of 28

DocumentPublishedAction
Case Officer ReportCase Officer Report · PDF17 Apr 2025View
Decision NoticeDecision Notice · PDF17 Apr 2025View
APPLICATION FORMApplication Form · PDF13 Mar 2025View
19-193-SGP-B1-00-DR-A-131100 (C01)_DC1 AND DC2 WAREHOUSE LAYOUT-C01-PHASE 1Current Docs · PDF13 Mar 2025View
19-193-SGP-B1-RF-DR-A-131102 (C01)_DC1 AND DC2 ROOF PLAN-C01-PHASE 1 NMA 02Current Docs · PDF13 Mar 2025View
19-193-SGP-B1-XX-DR-A-131200 (C01)_DC1 AND DC2 SECTIONS-C01-PHASE 1 NMA 02 PCurrent Docs · PDF13 Mar 2025View
19-193-SGP-B1-XX-DR-A-131300 (C01)_DC1 AND DC2 WAREHOUSE ELEVATIONS-C01-PHASCurrent Docs · PDF13 Mar 2025View
19-193-SGP-B1-ZZ-DR-A-131101 (C01)_DC1 OFFICE LAYOUT-C01-PHASE 1 NMA 02 PACurrent Docs · PDF13 Mar 2025View
19-193-SGP-B1-ZZ-DR-A-131102 (C01)_DC2 OFFICE LAYOUT-C01-PHASE 1 NMA 02 PACurrent Docs · PDF13 Mar 2025View
19-193-SGP-B2-00-DR-A-131100 (C01)_DC3 WAREHOUSE LAYOUT-C01-PHASE 1 NMA 02Current Docs · PDF13 Mar 2025View
19-193-SGP-B2-RF-DR-A-131102 (C01)_DC3 ROOF PLAN-C01-PHASE 1 NMA 02 PACKCurrent Docs · PDF13 Mar 2025View
19-193-SGP-B2-XX-DR-A-131200 (C01)_DC3 SECTION-C01-PHASE 1 NMA 02 PACKCurrent Docs · PDF13 Mar 2025View
19-193-SGP-B2-XX-DR-A-131300 (C01)_DC3 WAREHOUSE ELEVATIONS-C01-PHASE 1 NMCurrent Docs · PDF13 Mar 2025View
19-193-SGP-B2-ZZ-DR-A-131101 (C01)_DC3 OFFICE LAYOUT-C01-PHASE 1 NMA 02 PACurrent Docs · PDF13 Mar 2025View
19-193-SGP-B3-00-DR-A-131100 (C01)_DC4 - DC7 WAREHOUSE LAYOUT-C01-PHASE 1Current Docs · PDF13 Mar 2025View
19-193-SGP-B3-RF-DR-A-131102 (C01)_DC4 - DC7 ROOF PLAN-C01-PHASE 1 NMA 02Current Docs · PDF13 Mar 2025View
19-193-SGP-B3-XX-DR-A- 131200 (C01)_DC4 - DC7 SECTIONS-C01-PHASE 1 NMA 02Current Docs · PDF13 Mar 2025View
19-193-SGP-B3-XX-DR-A-131102 (C01)_DC4 OFFICE PLANS-C01-PHASE 1 NMA 02 PACCurrent Docs · PDF13 Mar 2025View
19-193-SGP-B3-XX-DR-A-131103 (C01)_DC5 OFFICE PLANS-C01-PHASE 1 NMA 02 PACCurrent Docs · PDF13 Mar 2025View
19-193-SGP-B3-XX-DR-A-131104 (C01)_DC6 OFFICE PLANS-C01-PHASE 1 NMA 02 PACCurrent Docs · PDF13 Mar 2025View
19-193-SGP-B3-XX-DR-A-131105 (C01)_DC7 OFFICE PLANS-C01-PHASE 1 NMA 02 PACCurrent Docs · PDF13 Mar 2025View
19-193-SGP-B3-XX-DR-A-131300 (C01)_DC4 - DC7 WAREHOUSE ELEVATIONS-C01-PHASCurrent Docs · PDF13 Mar 2025View
19-193-SGP-MP-XX-DR-A-131006 (C01)_PHASE 2 PARAMETER PLAN-C01-PHASE 1 NMACurrent Docs · PDF13 Mar 2025View
19-193-SGP-MP-XX-DR-A-131003 (C01)_PHASE 1 MASTERPLAN-C01-PHASE 1 NMA 02 P_Current Docs · PDF13 Mar 2025View
19-193-SGP-MP - XX-DR-A-131010 (C01)_PHASE 1 AND 2 MASTERPLAN-C01-PHASE 1 N_Current Docs · PDF13 Mar 2025View
PPL-BCA-ELS-XX-DR-L-2241-21-06E LANDSCAPE PROPOSAL PHASE 1Current Docs · PDF13 Mar 2025View
19-193-SGP-MP-XX-DR-A-131004 (C02)_PHASE 1 HARD LANDSCAPE PLANCurrent Docs · PDF13 Mar 2025View
19-193-SGP-MP-XX-DR-A-131005 (C01)_PHASE 1 BOUNDARY TREATMENT PLAN-C01-PHACurrent Docs · PDF13 Mar 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Application Permitted
Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.