Council planning record

Installation of six electric vehicle charging stations within the car park of Venue 360. Seven existing parking spaces will become EV charging bays, along with associated equipment. One of the six EV charging bays will be fully accessible, allowing for unrestricted access to one EV charger with 1.2m access on 4 sides of the parking bay.

Venue 360 Gipsy Lane Luton LU1 3JH

PER - Application PermittedReference: 23/00386/FULLuton Borough Council

Last published check: 29 Sept 2026, 13:37. Check the council record for more recent changes.

Application location

Venue 360 Gipsy Lane Luton LU1 3JH

This record has no verified map location.

View council map

Application summary

Status
PER - Application Permitted
Application type
Full Application
Received
6 Apr 2023
Validated
6 Apr 2023
Determination deadline
Not published
Local authority
Luton Borough Council

Application overview

Installation of six electric vehicle charging stations within the car park of Venue 360. Seven existing parking spaces will become EV charging bays, along with associated equipment. One of the six EV charging bays will be fully accessible, allowing for unrestricted access to one EV charger with 1.2m access on 4 sides of the parking bay.

Proposal details

Reference
23/00386/FUL
Ward
SOUTH

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 13 of 13

DocumentPublishedAction
DECISION NOTICEDecision Notice · PDF24 May 2023View
CASE OFFICER REPORTCase Officer Report · PDF24 May 2023View
ENVIRONMENTAL PROTECTIONComment - Consultee · PDF3 May 2023View
APPLICATION FORMApplication Form · PDF6 Apr 2023View
001_10 EQUIPMENT ELEVATIONS - TR7 SUBSTATION_REVACurrent Docs · PDF6 Apr 2023View
001_21 LAMPPOST 3M_REVDCurrent Docs · PDF6 Apr 2023View
001_27 EQUIPMENT ELEVATIONS - FEEDER PILLAR RMC2100 WITH SPACER_REVACurrent Docs · PDF6 Apr 2023View
001_29 EQUIPMENT ELEVATIONS - BYD 160KW CHARGER_REVACurrent Docs · PDF6 Apr 2023View
160KW 200A DC CHARGER SPECIFICATION_ AIR COOLED EVD160KUC01_V03_20221214Current Docs · PDF6 Apr 2023View
10691 - 0021_01-PL PLANNING SITE LAYOUT_REVBCurrent Docs · PDF6 Apr 2023View
10691 - 0021_02 LOCATION PLAN_REVBCurrent Docs · PDF6 Apr 2023View
10691 - 0021_03 BLOCK PLAN_REVBCurrent Docs · PDF6 Apr 2023View
DC01 - DESIGN AND ACCESS STATEMENTCurrent Docs · PDF6 Apr 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Last Site Notice Posted Date

    Published milestoneCouncil source
  5. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  6. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Decision Issued Date

    Published milestoneCouncil source
  9. Permission Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Application Permitted
DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.