Council planning record

Hybrid Planning Application for the phased demolition of all existing buildings and structures, site preparation works and the comprehensive employment-led redevelopment of the site comprising: 1) Detailed Planning Application for the construction of flexible employment floorspace (Use Classes E(g)(ii)/(iii), B2 and/or B8, with ancillary office floorspace) and all associated infrastructure works, access arrangements, internal road network, parking, and hard and soft landscaping; and 2) Outline Planning Application (with all matters reserved) for the construction of flexible employment floorspace (Use Classes E(g)(ii)/(iii), B2 and/or B8, with ancillary office floorspace), an on-site training & development facility (Use Classes E(g)(i)/F1(a)), and all associated infrastructure works, access arrangements, internal road network, parking, and hard and soft landscaping.

Prologis Park Griffin House 5 Osborne Road Luton LU1 3YT

PER - Application PermittedReference: 22/01334/HYBEIALuton Borough Council

Last published check: 30 Sept 2026, 11:18. Check the council record for more recent changes.

Application location

Prologis Park Griffin House 5 Osborne Road Luton LU1 3YT

This record has no verified map location.

View council map

Application summary

Status
PER - Application Permitted
Application type
Full and Outline with EIA development
Received
7 Oct 2022
Validated
7 Oct 2022
Determination deadline
Not published
Local authority
Luton Borough Council

Application overview

Hybrid Planning Application for the phased demolition of all existing buildings and structures, site preparation works and the comprehensive employment-led redevelopment of the site comprising: 1) Detailed Planning Application for the construction of flexible employment floorspace (Use Classes E(g)(ii)/(iii), B2 and/or B8, with ancillary office floorspace) and all associated infrastructure works, access arrangements, internal road network, parking, and hard and soft landscaping; and 2) Outline Planning Application (with all matters reserved) for the construction of flexible employment floorspace (Use Classes E(g)(ii)/(iii), B2 and/or B8, with ancillary office floorspace), an on-site training & development facility (Use Classes E(g)(i)/F1(a)), and all associated infrastructure works, access arrangements, internal road network, parking, and hard and soft landscaping.

Proposal details

Reference
22/01334/HYBEIA
Ward
SOUTH
Agent
Mr Christopher Schiele - Turley

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 155 of 155

DocumentPublishedAction
S106 AgreementCurrent Docs · PDF12 May 2023View
S106 Agreement (signed by Latimer Land (Luton) Limited)Current Docs · PDF12 May 2023View
S106 Agreement (signed by Prologis CCCLII & CCCLICurrent Docs · PDF12 May 2023View
S106 Completion MemoThe BackGround Papers · PDF12 May 2023View
Committee ReportCommittee Report · PDF12 May 2023View
Decision NoticeDecision Notice · PDF12 May 2023View
Final comments from LLFAComment - Consultee · PDF17 Apr 2023View
Archaeological commentComment - Consultee · PDF13 Mar 2023View
Further comments from the LLFA 2Comment - Consultee9 Mar 2023View
Applicant's response to Economic Development CommentsCurrent Docs - ADDITIONAL · PDF9 Mar 2023View
Further comments from HighwaysComment - Consultee8 Mar 2023View
Further comments from Highways 2Comment - Consultee8 Mar 2023View
Initial comments from Environment AgencyComment - Consultee · PDF3 Mar 2023View
Tree Officer CommentsComment - Consultee3 Mar 2023View
Further comments from Environment AgencyComment - Consultee · PDF2 Mar 2023View
Applicant's Tree Briefing NoteCurrent Docs - ADDITIONAL · PDF3 Feb 2023View
Updated construction management planCurrent Docs - AMENDED · PDF2 Feb 2023View
Technical Advice Note 2Current Docs - ADDITIONAL · PDF2 Feb 2023View
Technical Advice Note to National HighwaysCurrent Docs - ADDITIONAL · PDF2 Feb 2023View
Traffic Impact ModelCurrent Docs - ADDITIONAL2 Feb 2023View
Highways England second commentsComment - Consultee · PDF19 Jan 2023View
Thames Water commentsComment - Consultee · PDF1 Dec 2022View
THAMES WATER COMMENTSComment - Consultee · PDF17 Nov 2022View
Economic Development CommentsComment - Consultee · PDF15 Nov 2022View
PUBLIC HEALTH COMMENTSComment - Consultee · PDF15 Nov 2022View
Highways England commentsComment - Consultee · PDF15 Nov 2022View
ENVIRONMENTAL PROTECTION COMMENTSComment - Consultee · PDF15 Nov 2022View
POLICE COMMENTSComment - Consultee · PDF15 Nov 2022View
Natural England commentsComment - Consultee · PDF11 Nov 2022View
Natural England attachment commentsComment - Consultee · PDF11 Nov 2022View
BEDFORDSHIRE FIRE & RESCUE COMMENTS 1Comment - Consultee · PDF9 Nov 2022View
ENVIRONMENTAL PROTECTION COMMENTSComment - Consultee · PDF3 Nov 2022View
Health and Safety Executive commentsComment - Consultee · PDF26 Oct 2022View
APPLICATION FORMApplication Form · PDF17 Oct 2022View
DC01 Units DC1-DC2 Warehouse LayoutCurrent Docs · PDF17 Oct 2022View
DC02 Units DC1-DC2 Roof PlanCurrent Docs · PDF17 Oct 2022View
DC03 Units DC1-DC2 SectionCurrent Docs · PDF17 Oct 2022View
DC04 Units DC1-DC2 Warehouse ElevationsCurrent Docs · PDF17 Oct 2022View
DC05 Unit DC1 Office LayoutCurrent Docs · PDF17 Oct 2022View
DC06 Unit DC2 Office LayoutCurrent Docs · PDF17 Oct 2022View
DC07 Unit DC3 Warehouse LayoutCurrent Docs · PDF17 Oct 2022View
DC08 Unit DC3 Roof PlanCurrent Docs · PDF17 Oct 2022View
DC09 Unit DC3 SectionCurrent Docs · PDF17 Oct 2022View
DC10 Unit DC3 Warehouse ElevationsCurrent Docs · PDF17 Oct 2022View
DC11 Unit DC3 Office LayoutCurrent Docs · PDF17 Oct 2022View
DC12 Units DC4-DC7 Warehouse LayoutCurrent Docs · PDF17 Oct 2022View
DC13 Units DC4-DC7 Roof PlanCurrent Docs · PDF17 Oct 2022View
DC14 Units DC4-DC7 SectionCurrent Docs · PDF17 Oct 2022View
DC15 Units DC4-DC7 Warehouse ElevationsCurrent Docs · PDF17 Oct 2022View
DC16 Unit DC4 Office LayoutCurrent Docs · PDF17 Oct 2022View
DC17 Unit DC5 Office LayoutCurrent Docs · PDF17 Oct 2022View
DC18 Unit DC6 Office LayoutCurrent Docs · PDF17 Oct 2022View
DC19 Unit DC7 Office LayoutCurrent Docs · PDF17 Oct 2022View
DC20 Site Location PlanCurrent Docs · PDF17 Oct 2022View
DC21 Demolition PlanCurrent Docs · PDF17 Oct 2022View
DC22 Phasing PlanCurrent Docs · PDF17 Oct 2022View
DC23 Phase 1 MasterplanCurrent Docs · PDF17 Oct 2022View
DC24 Phase 1 Hard Landscape PlanCurrent Docs · PDF17 Oct 2022View
DC25 Phase 1 Boundary Treatment PlanCurrent Docs · PDF17 Oct 2022View
DC26 Phase 2 Parameter PlanCurrent Docs · PDF17 Oct 2022View
DC27 Illustrative Masterplan Phases 1 and 2Current Docs · PDF17 Oct 2022View
DC28 Archaeological Desk Based AssessmentCurrent Docs · PDF17 Oct 2022View
DC29 Energy StrategyCurrent Docs · PDF17 Oct 2022View
DC30 Ecological AssessmentCurrent Docs · PDF17 Oct 2022View
DC31 Heritage StatementCurrent Docs · PDF17 Oct 2022View
DC32 Geo-Environmental AssessmentCurrent Docs · PDF17 Oct 2022View
DC33 - Geo-Environmental Assessment Appendices Part 1Current Docs · PDF17 Oct 2022View
DC34 Geo-Environmental Assessment Appendices Part 2Current Docs · PDF17 Oct 2022View
DC35 Geo-Environmental Assessment Appendices Part 3Current Docs · PDF17 Oct 2022View
DC36 Geo-Environmental Assessment Appendices Part 4Current Docs · PDF17 Oct 2022View
DC37 Geo-Environmental Assessment Appendices Part 5Current Docs · PDF17 Oct 2022View
DC38 Geo-Environmental Assessment Appendices Part 6Current Docs · PDF17 Oct 2022View
DC39 Geo-Environmental Assessment Appendices Part 7Current Docs · PDF17 Oct 2022View
DC40 Geo-Environmental Assessment Appendices Part 8Current Docs · PDF17 Oct 2022View
DC41 Geo-Envrionmental Assessment Appendices Part 9Current Docs · PDF17 Oct 2022View
DC42 Geo-Environmental Assessment Appendices Part 10Current Docs · PDF17 Oct 2022View
DC43 Framework Construction Management PlanCurrent Docs · PDF17 Oct 2022View
DC44 Flood Risk AssessmentCurrent Docs · PDF17 Oct 2022View
DC45 Geo-Environmental Desk Study Part 1Current Docs · PDF17 Oct 2022View
DC46 Geo-Environmental Desk Study Part 2Current Docs · PDF17 Oct 2022View
DC47 Geo-Environmental Desk Study Part 3Current Docs · PDF17 Oct 2022View
DC48 Geo-Environmental Desk Study Part 4Current Docs · PDF17 Oct 2022View
DC49 Geo-Environmental Desk Study Part 5Current Docs · PDF17 Oct 2022View
DC50 Geo-Environmental Desk Study Part 6Current Docs · PDF17 Oct 2022View
DC51 Geo-Environmental Desk Study Part 7Current Docs · PDF17 Oct 2022View
DC52 Geo-Environmental Desk Study Part 8Current Docs · PDF17 Oct 2022View
DC53 Geo-Environmental Desk Study Part 9Current Docs · PDF17 Oct 2022View
DC54 Geo-Environmental Desk Study Part 10Current Docs · PDF17 Oct 2022View
DC55 Geo-Environmental Desk Study Part 11Current Docs · PDF17 Oct 2022View
DC56 Geo-Environmental Desk Study Part 12Current Docs · PDF17 Oct 2022View
DC57 Health Impact AssessmentCurrent Docs · PDF17 Oct 2022View
DC58 Framework Travel PlanCurrent Docs · PDF17 Oct 2022View
DC59 Statement of Community EngagementCurrent Docs · PDF17 Oct 2022View
DC60 Transport StatementCurrent Docs · PDF17 Oct 2022View
DC61 Daylight and Sunlight ReportCurrent Docs · PDF17 Oct 2022View
DC62 Sustainability StatementCurrent Docs · PDF17 Oct 2022View
DC63 Design and Access StatementCurrent Docs · PDF17 Oct 2022View
DC64 Tree SurveyCurrent Docs · PDF17 Oct 2022View
DC65 Landscape Design StatementCurrent Docs · PDF17 Oct 2022View
DC66 Landscape Maintenance and Management PlanCurrent Docs · PDF17 Oct 2022View
DC68 Tree Protection PlanCurrent Docs · PDF17 Oct 2022View
DC69 Drainage StrategyCurrent Docs · PDF17 Oct 2022View
DC70 Arboricultural Impact AssessmentCurrent Docs · PDF17 Oct 2022View
DC71 Noise Technical NoteCurrent Docs · PDF17 Oct 2022View
DC72 ES Contents PageCurrent Docs · PDF17 Oct 2022View
DC73 ES Chapter 1 - IntroductionCurrent Docs · PDF17 Oct 2022View
DC74 ES Chapter 2 - Approach to EIACurrent Docs · PDF17 Oct 2022View
DC75 ES Chapter 3 - Description of Site and Surrounding AreaCurrent Docs · PDF17 Oct 2022View
DC76 ES Chapter 4 - Development SpecificationCurrent Docs · PDF17 Oct 2022View
DC77 ES Chapter 5 - AlternativesCurrent Docs · PDF17 Oct 2022View
DC78 ES Chapter 6 - Socio-Economics and Human HealthCurrent Docs · PDF17 Oct 2022View
DC79 ES Chapter 7 - Air QualityCurrent Docs · PDF17 Oct 2022View
DC80 ES Chapter 8 - Noise and VibrationCurrent Docs · PDF17 Oct 2022View
DC81 ES Chapter 9 - Cumulative Effects AssessmentCurrent Docs · PDF17 Oct 2022View
DC82 ES Chapter 10 - Summary of ES and SoMCurrent Docs · PDF17 Oct 2022View
DC83 ES Figure 1.1 - Site Location Plan ES and SoMCurrent Docs · PDF17 Oct 2022View
DC84 ES Figure 4.1 - Parameter PlanCurrent Docs · PDF17 Oct 2022View
DC85 ES Figure 6.1 - Study Area PlanCurrent Docs · PDF17 Oct 2022View
DC86 ES Figure 7.1 - Location of Human Health ReceptorsCurrent Docs · PDF17 Oct 2022View
DC87 ES Figure 7.2 - Location of Ecological ReceptorsCurrent Docs · PDF17 Oct 2022View
DC88 ES Figure 7.3 - Location of AQMAs and Local Air Quality Monitoring SitesCurrent Docs · PDF17 Oct 2022View
DC89 ES Figure 8.1 - Noise Monitoring LocationsCurrent Docs · PDF17 Oct 2022View
DC90 ES Figure 8.2 - ML1 Photograph 1.0Current Docs · PDF17 Oct 2022View
DC91 ES Figure 8.3 - ML2 Photograph 1.0Current Docs · PDF17 Oct 2022View
DC92 ES Figure 8.4 - ML3 Photograph 1.0Current Docs · PDF17 Oct 2022View
DC93 ES Figure 8.5 - Ambient Sound Level Graph 1.0Current Docs · PDF17 Oct 2022View
DC94 ES Figure 8.6 - Background Sound Level Graph 1.0Current Docs · PDF17 Oct 2022View
DC95 ES Figure 8.7 - Receptor Locations 1.0Current Docs · PDF17 Oct 2022View
DC96 ES Figure 8.8 - Noise Model Plots and Barrier Positions 1.0Current Docs · PDF17 Oct 2022View
DC97 ES Figure 9.1 - Approved Projects 1.0Current Docs · PDF17 Oct 2022View
DC98 ES Appendix 1.1 - Statement of Technical CompetenceCurrent Docs · PDF17 Oct 2022View
DC99 ES Appendix 2.2 - EIA Scoping OpinionCurrent Docs · PDF17 Oct 2022View
DC100 ES Appendix 2.3 - Built Heritage Response to EIA Scoping OpinionCurrent Docs · PDF17 Oct 2022View
DC101 ES Appendix 2.4 - Built Heritage Response from LBCCurrent Docs · PDF17 Oct 2022View
DC102 ES Appendix 2.5 - Noise Response to EIA Scoping OpinionCurrent Docs · PDF17 Oct 2022View
DC103 ES Appendix 2.6 - Noise Response from LBCCurrent Docs · PDF17 Oct 2022View
DC104 ES Appendix 7.1 - Construction Dust MitigationCurrent Docs · PDF17 Oct 2022View
DC105 ES Appendix 7.2 - Legislation and PolicyCurrent Docs · PDF17 Oct 2022View
DC106 ES Appendix 7.3 - Additional ES ScenariosCurrent Docs · PDF17 Oct 2022View
DC107 ES Appendix 7.4 - Traffic Data SummaryCurrent Docs · PDF17 Oct 2022View
DC108 ES Appendix 7.5 - Model Verification CalculationsCurrent Docs · PDF17 Oct 2022View
DC109 ES Appendix 7.6 - Model Results - Main AssessmentCurrent Docs · PDF17 Oct 2022View
DC110 ES Appendix 8.1 - Acoustic GlossaryCurrent Docs · PDF17 Oct 2022View
DC111 ES Appendix 8.2 - Noise Model InputsCurrent Docs · PDF17 Oct 2022View
DC112 ES Appendix 8.3 - Luton Airport Aviation Noise ContoursCurrent Docs · PDF17 Oct 2022View
DC113 ES Non-Technical SummaryCurrent Docs · PDF17 Oct 2022View
DC114 Cover LetterCurrent Docs · PDF17 Oct 2022View
DC115 Planning StatementCurrent Docs · PDF17 Oct 2022View
DC116 Planning Application Form ClarificationsCurrent Docs · PDF17 Oct 2022View
DC117 Landscape and Townscape Visual Impact AssessmentCurrent Docs · PDF17 Oct 2022View
DC118 Landscape MasterplanCurrent Docs · PDF17 Oct 2022View
DC119 Landscape Sections A-HCurrent Docs · PDF17 Oct 2022View
DC120 Landscape Sections I-NCurrent Docs · PDF17 Oct 2022View
DC121 Landscape Proposals Phase 1Current Docs · PDF17 Oct 2022View
DC67 Tree Constraints PlanCurrent Docs · PDF17 Oct 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  4. Standard Consultation Date

    Published milestoneCouncil source
  5. Last Site Notice Posted Date

    Published milestoneCouncil source
  6. Last Advertised In Press Date

    Published milestoneCouncil source
  7. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Actual Committee Date

    Published milestoneCouncil source
  10. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision Issued Date

    Published milestoneCouncil source
  12. Permission Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Application Permitted
Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.