Council planning record

Demolition of the existing building except for the retained southern, eastern and western facades. Construction of a 6-storey building and single-storey rooftop extension, to provide 33 new social rent residential units (Class C3). Reprovision of the Chisenhale Dance Space (Class E(d)) at ground floor level, together with associated amenity and play space, servicing, car parking, landscaping and ancillary works.

70-86 Chisenhale Road, London, E3 5RT

RegisteredReference: PA/26/01534/A1London Borough of Tower Hamlets

Last published check: 16 Sept 2026, 16:52. Check the council record for more recent changes.

Application location

70-86 Chisenhale Road, London, E3 5RT

This record has no verified map location.

View council map

Application summary

Status
Registered
Application type
Full Planning Permission
Received
Not published
Validated
2 Sept 2026
Determination deadline
Not published
Local authority
London Borough of Tower Hamlets

Application overview

Demolition of the existing building except for the retained southern, eastern and western facades. Construction of a 6-storey building and single-storey rooftop extension, to provide 33 new social rent residential units (Class C3). Reprovision of the Chisenhale Dance Space (Class E(d)) at ground floor level, together with associated amenity and play space, servicing, car parking, landscaping and ancillary works.

Proposal details

Reference
PA/26/01534/A1
Ward
Bow West
Agent
DP9

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 73 of 73

DocumentPublishedAction
BELOW 18M - HSE GATEWAY 1 THRESHOLD HEIGHTCurrent Plan · PDF14 Sept 2026View
Application FormApplication Form · PDF2 Sept 2026View
DESKTOP STUDY, PRELIMINARY RISK ASSESSMENT AND SIT RECONNAISSANCEReport · PDF2 Sept 2026View
Daylight & SunlightDaylight & Sunlight · PDF2 Sept 2026View
CONSTRUCTION MANAGEMENT PLAN - PART 2Report · PDF2 Sept 2026View
PRELIMINARY ECOLOGICAL APPRAISALReport · PDF2 Sept 2026View
NOISE IMPACT ASSESSMENTReport · PDF2 Sept 2026View
FIRE STATEMENTReport · PDF2 Sept 2026View
CIRCULAR ECONOMY STATEMENTReport · PDF2 Sept 2026View
OPERATIONAL WASTE MANAGEMENT STRATEGYReport · PDF2 Sept 2026View
STATEMENT OF COMMUNITY INVOLVEMENTReport · PDF2 Sept 2026View
PLANNING REPORT (INCLUDING AFFORDABLE HOUSING STATEMENT AND DRAFT PLANNING OBLIGATIONS STATEMENT)Report · PDF2 Sept 2026View
CONSTRUCTION MANAGEMENT PLAN - PART 1Report · PDF2 Sept 2026View
RAPID HEALTH IMPACT ASSESSMENT MATRIXReport · PDF2 Sept 2026View
EXISTING ELEVATION SOUTHCurrent Plan · PDF2 Sept 2026View
EXISTING SECTION NORTH SOUTHCurrent Plan · PDF2 Sept 2026View
EXISTING PLAN GROUND FLOORCurrent Plan · PDF2 Sept 2026View
EXISTING PLAN ROOFCurrent Plan · PDF2 Sept 2026View
EXISTING SITE PLANCurrent Plan · PDF2 Sept 2026View
EXISTING PLAN FIRST FLOORCurrent Plan · PDF2 Sept 2026View
PROPOSED SITE PLANCurrent Plan · PDF2 Sept 2026View
PROPOSED GA PLAN GROUND FLOORCurrent Plan · PDF2 Sept 2026View
PROPOSED GA PLAN FIFTH FLOORCurrent Plan · PDF2 Sept 2026View
PROPOSED GA PLAN FIRST FLOORCurrent Plan · PDF2 Sept 2026View
PROPOSED GA PLAN FOURTH FLOORCurrent Plan · PDF2 Sept 2026View
PROPOSED GA PLAN SECOND FLOORCurrent Plan · PDF2 Sept 2026View
PROPOSED GA SECTION NORTH SOUTHCurrent Plan · PDF2 Sept 2026View
PROPOSED GA PLAN ROOFCurrent Plan · PDF2 Sept 2026View
PROPOSED GA SECTION WEST EASTCurrent Plan · PDF2 Sept 2026View
PROPOSED GA ELEVATION SOUTHCurrent Plan · PDF2 Sept 2026View
PROPOSED GA ELEVATION NORTHCurrent Plan · PDF2 Sept 2026View
PROPOSED GA ELEVATION EAST & WESTCurrent Plan · PDF2 Sept 2026View
UNIT PLAN 1B2P-ACurrent Plan · PDF2 Sept 2026View
UNIT PLAN 2B4P-ACurrent Plan · PDF2 Sept 2026View
UNIT PLAN 2B4P-BCurrent Plan · PDF2 Sept 2026View
UNIT PLAN 1B2P-BCurrent Plan · PDF2 Sept 2026View
UNIT PLAN 2B3P-ACurrent Plan · PDF2 Sept 2026View
UNIT PLAN 2B4P-CCurrent Plan · PDF2 Sept 2026View
UNIT PLAN 2B4P-WCH-ACurrent Plan · PDF2 Sept 2026View
UNIT PLAN 3B5P-BCurrent Plan · PDF2 Sept 2026View
UNIT PLAN 3B5P-ACurrent Plan · PDF2 Sept 2026View
UNIT PLAN 2B4P-WCH-BCurrent Plan · PDF2 Sept 2026View
BAY STUDY SOUTH ELEVATIONCurrent Plan · PDF2 Sept 2026View
BAY STUDY NORTH ELEVATIONCurrent Plan · PDF2 Sept 2026View
PROPOSED SCHEDULE OF ACCOMMODATIONCorrespondence · PDF2 Sept 2026View
PART 3Design & Access Statement · PDF2 Sept 2026View
PART 2Design & Access Statement · PDF2 Sept 2026View
PART 5Design & Access Statement · PDF2 Sept 2026View
PART 6Design & Access Statement · PDF2 Sept 2026View
PART 4Design & Access Statement · PDF2 Sept 2026View
PART 1Design & Access Statement · PDF2 Sept 2026View
GA PLAN ROOFCurrent Plan · PDF2 Sept 2026View
GA PLAN GROUND FLOORCurrent Plan · PDF2 Sept 2026View
LANDSCAPE SECTIONSCurrent Plan · PDF2 Sept 2026View
LANDSCAPE MAINTENANCE SCHEDULEReport · PDF2 Sept 2026View
Drawing/Document Issue RegisterDrawing/Document Issue Register · PDF2 Sept 2026View
EXISTING SITE LOCATION PLANCurrent Plan · PDF2 Sept 2026View
PROPOSED GA PLAN THIRD FLOORCurrent Plan · PDF2 Sept 2026View
STRUCTURAL REPORT - PART 5Report · PDF2 Sept 2026View
STRUCTURAL REPORT - PART 2Report · PDF2 Sept 2026View
STRUCTURAL REPORT - PART 3Report · PDF2 Sept 2026View
HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT - PART 2Report · PDF2 Sept 2026View
STRUCTURAL REPORT - PART 4Report · PDF2 Sept 2026View
HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT - PART 1Report · PDF2 Sept 2026View
AIR QUALITY ASSESSMENTReport · PDF2 Sept 2026View
COVER LETTER DATED: 25 AUG 2026Correspondence · PDF2 Sept 2026View
DRAINAGE STRATEGYReport · PDF2 Sept 2026View
ENERGY STATEMENT AND OVERHEATING ASSESSMENTReport · PDF2 Sept 2026View
EQUALITY IMPACT ASSESSMENT INITIAL SCREENING TOOLReport · PDF2 Sept 2026View
Flood Risk AssessmentFlood Risk Assessment · PDF2 Sept 2026View
STRUCTURAL REPORT - PART 1Report · PDF2 Sept 2026View
TRANSPORT ASSESSMENTReport · PDF2 Sept 2026View
RESIDENTIAL TRAVEL PLANReport · PDF2 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Validated Date

    Published milestoneCouncil source
  2. Last Advertised In Press Date

    Published milestoneCouncil source
  3. Consultation End Date

    Scheduled

    Future date published by the council.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.