Proposed two-storey rear extension comprising a rear side alley extension, reconstruction of the existing lean-to, a conservatory, and a first-floor extension to the existing outrigger. Replacement of front door and four new rooflights at rear. Internal alteration and refurbishment include repair and secondary glazing to front elevation, new timber floorboard on ground level, replacement of fireplace with stone hearth at front room, replacement door of back room hallway with panelled door, new door and fanlight to form lobby with front door, restoration of existing stair timber treads on ground level, replacement of panelled door with fire rated door, new pocket door between back room and kitchen extension, new joinery fitted to front bedroom on first floor.
Proposed two-storey rear extension comprising a rear side alley extension, reconstruction of the existing lean-to, a conservatory, and a first-floor extension to the existing outrigger. Replacement of front door and four new rooflights at rear. Internal alteration and refurbishment include repair and secondary glazing to front elevation, new timber floorboard on ground level, replacement of fireplace with stone hearth at front room, replacement door of back room hallway with panelled door, new door and fanlight to form lobby with front door, restoration of existing stair timber treads on ground level, replacement of panelled door with fire rated door, new pocket door between back room and kitchen extension, new joinery fitted to front bedroom on first floor.
Reference
PA/26/00644/NC
Ward
Bethnal Green East
Agent
Site Office Ltd
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.