Awaiting decisionCouncil status: Registered

Proposed works at Oast Courts involve the renewal of the main flat roofs, lower roofs, walkways, and balconies. Where necessary, thermal insulation will be upgraded to meet current standards. Rainwater drainage will be improved by increasing the number and size of outlets across all roof levels and balconies, and emergency overflow provisions will be installed to enhance resilience. Additionally, steel capping sheets will be fitted to the parapet walls of the main roof to improve durability and weather protection.

Oast Court, 10 Three Colt Street, London E14

London Borough of Tower HamletsReference PA/25/01855/NCFull Planning Permission

Last published check: 18 Nov 2026, 17:16. Check the council record for more recent changes.

Status and dates

Last published check: 18 Nov 2026, 17:16 (UK)

46days until agreed decision date12 Jan 2027

  1. Not publishedReceivedNo date on council record
  2. DoneValidated10 Nov 2025
  3. Not publishedConsultationNo date on council record
  4. Next date · in 46 daysAgreed decision date12 Jan 2027
  5. Not yet publishedDecisionNo decision on council record

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (7)
  1. Application Validated Date

    Published milestoneCouncil source
  2. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  3. Last Site Notice Posted Date

    Published milestoneCouncil source
  4. Last Advertised In Press Date

    Published milestoneCouncil source
  5. Consultation End Date

    Published milestoneCouncil source
  6. Agreed Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Full Planning Permission
Ward
Limehouse
Documents
87 published

Proposal

Proposed works at Oast Courts involve the renewal of the main flat roofs, lower roofs, walkways, and balconies. Where necessary, thermal insulation will be upgraded to meet current standards. Rainwater drainage will be improved by increasing the number and size of outlets across all roof levels and balconies, and emergency overflow provisions will be installed to enhance resilience. Additionally, steel capping sheets will be fitted to the parapet walls of the main roof to improve durability and weather protection.

Reference
PA/25/01855/NC
Ward
Limehouse
Agent
Ridge and Partners LLP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • BAUDER SOLAR PV LAYOUT PLANCurrent Plan6 Nov 2026View
  • OAST COURT PROPOSED ROOF PLANCurrent Plan6 Nov 2026View
  • DRAINAGE REPORTReport23 Oct 2026View
  • Flood Risk AssessmentFlood Risk Assessment23 Oct 2026View
  • SAMPLES AGAINST THE BRICKPhoto20 May 2026View
  • SAMPLES WITH THE EXISTING TIMBER ENTRANCESPhoto20 May 2026View
  • PAINT SAMPLEPhoto1 May 2026View
  • SAMPLESPhoto24 Apr 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.