Proposed works at Cubitt Town School comprise the installation of new Air Source Heat Pumps (ASHPs) to replace the existing gas-fired heating and hot water systems. The upgrade will deliver a low -carbon solution in line the borough's sustainability objectives. Additionally a photovotaic (PV) panel array with a capacity of up to 100kWp will be installed, supporting onsite renewable energy generation.
Cubitt Town Junior And Infants Primary School, Glengall Grove, London, E14 3NE
Proposed works at Cubitt Town School comprise the installation of new Air Source Heat Pumps (ASHPs) to replace the existing gas-fired heating and hot water systems. The upgrade will deliver a low -carbon solution in line the borough's sustainability objectives. Additionally a photovotaic (PV) panel array with a capacity of up to 100kWp will be installed, supporting onsite renewable energy generation.
Reference
PA/25/01777/NC
Ward
Blackwall and Cubitt Town
Agent
RAFT CIC
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.