Awaiting decisionCouncil status: Registered

A phased development comprising demolition of the existing office building (Use Class E) and the construction of a single tall building providing residential accommodation, including affordable housing (Use Class C3), serviced apartments (Use Class C1) and co-living accommodation (Sui Generis) with flexible commercial and community uses (Use Classes E / F2) at lower levels and alongside associated hard and soft landscaping, public realm improvements and associated works.�This application is accompanied by an Environmental Statement.�[Additional details on the description of development for consultation purposes:�The proposed single tall building of 54 storeys (190m AOD height), and two additional basement levels, would provide the following:�195 Build to Rent residential units (Use Class C3),121 Self-contained affordable residential units (Use Class C3),238 Co-living rooms with associated communal spaces and areas (Sui Generis Use Class)266 Serviced apartments rooms (Use Class C1),430 square metres of commercial floorspace (Use Class E), and 192 square metres of community floorspace (Use Class F2).]

The South Quay Building, 77 Marsh Wall, London, E14 9SH

London Borough of Tower HamletsReference PA/25/01729Full Planning Permission

Last published check: 19 Nov 2026, 08:14. Check the council record for more recent changes.

Open council website

Status and dates

Last published check: 19 Nov 2026, 08:14 (UK)

  1. Not publishedReceivedNo date on council record
  2. DoneValidated8 Oct 2025
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. Not yet publishedDecisionNo decision on council record

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (6)
  1. Application Validated Date

    Published milestoneCouncil source
  2. Last Advertised In Press Date

    Published milestoneCouncil source
  3. Last Site Notice Posted Date

    Published milestoneCouncil source
  4. Consultation End Date

    Published milestoneCouncil source
  5. Actual Committee Date

    Published milestoneCouncil source
Application type
Full Planning Permission
Ward
Canary Wharf
Documents
366 published

Proposal

A phased development comprising demolition of the existing office building (Use Class E) and the construction of a single tall building providing residential accommodation, including affordable housing (Use Class C3), serviced apartments (Use Class C1) and co-living accommodation (Sui Generis) with flexible commercial and community uses (Use Classes E / F2) at lower levels and alongside associated hard and soft landscaping, public realm improvements and associated works.�This application is accompanied by an Environmental Statement.�[Additional details on the description of development for consultation purposes:�The proposed single tall building of 54 storeys (190m AOD height), and two additional basement levels, would provide the following:�195 Build to Rent residential units (Use Class C3),121 Self-contained affordable residential units (Use Class C3),238 Co-living rooms with associated communal spaces and areas (Sui Generis Use Class)266 Serviced apartments rooms (Use Class C1),430 square metres of commercial floorspace (Use Class E), and 192 square metres of community floorspace (Use Class F2).]

Reference
PA/25/01729
Ward
Canary Wharf
Agent
DP9

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • CANAL & RIVER TRUSTConsultee Comment26 May 2026View
  • RESPONSE TO THE UPDATED CONSULTATION RESPONSE FROM THE CRTCorrespondence5 May 2026View
  • CANAL AND RIVER TRUSTConsultee Comment24 Apr 2026View
  • ES FINAL REVIEW REPORT 002Report7 Apr 2026View
  • Flood Risk AssessmentFlood Risk Assessment31 Mar 2026View
  • ES REVIEW FEEDBACK - APPLICANTS RESPONSE 1Correspondence31 Mar 2026View
  • CANAL RIVER TRUSTConsultee Comment26 Mar 2026View
  • NON-TECHNICAL SUMMARYEnvironmental Statement17 Mar 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Decision not yet published
OCCUPANCY - APPEAL DECISION MET POLICE EXAMPLES OF APPEAL DECISIONS SUPPORTING THE POLICE MET POLICE EXAMPLES OF APPEAL DECISIONS CONCERNING POLICING CONTRIBUTIONS MET POLICE EXAMPLES OF APPEAL DECISIONS CONCERNING ABSENCE OF POLICY
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.