Status on council recordCouncil status: Decided

Observations request by the London Borough of Southwark in removal of the existing sprinkler system within the North and South towers of Tower Bridge while installing a new fire sprinkler system covering: North and South Towers; North and South Abutments; Highlevel Walkways; Reservoir, Engine Rooms and Shop. The replacement of the gas suppression system within the 4no. Machine Rooms below the North and South towers. The connection of the sprinkler and gas suppression systems to the BMS. The replacement of the boosted mains and domestic cold-water systems to the North and South towers.

Tower Bridge, Tower Bridge Road, London SE1

London Borough of Tower HamletsReference PA/25/01354/NCObservations to Other Authorities

Last published check: 20 Nov 2026, 06:24. Check the council record for more recent changes.

Status and dates

Last published check: 20 Nov 2026, 06:24 (UK)

  1. Not publishedReceivedNo date on council record
  2. DoneValidated28 Jul 2025
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedNo Objection (Observations Applications)21 Aug 2025

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (3)
  1. Application Validated Date

    Published milestoneCouncil source
  2. Decision Issued Date

    Published milestoneCouncil source
Application type
Observations to Other Authorities
Documents
2 published

Proposal

Observations request by the London Borough of Southwark in removal of the existing sprinkler system within the North and South towers of Tower Bridge while installing a new fire sprinkler system covering: North and South Towers; North and South Abutments; Highlevel Walkways; Reservoir, Engine Rooms and Shop. The replacement of the gas suppression system within the 4no. Machine Rooms below the North and South towers. The connection of the sprinkler and gas suppression systems to the BMS. The replacement of the boosted mains and domestic cold-water systems to the North and South towers.

Reference
PA/25/01354/NC

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • DECISION_NOTICEDecision Notice21 Aug 2025View
  • SOUTHWARK COUNCIL CONSULTATION REQUESTCorrespondence29 Jul 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

No Objection (Observations Applications)
DECISION_NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.