ApprovedCouncil status: Decided

Listed Building Consent for the removal of the existing sprinkler system within the North Tower of Tower Bridge while installing a new fire sprinkler system covering: North Tower; North Abutment; High-level Walkways; Reservoir; Engine Rooms; and Shop. The replacement of the gas suppression system within the Machine Rooms below the North Tower. The connection of the sprinkler and gas suppression systems to the Building Management System (BMS). The replacement of the boosted mains and domestic cold-water systems to the North Tower. Installation of external pipework on the eastern elevation of the North Abutment.

Tower Bridge, Tower Bridge Approach, London

London Borough of Tower HamletsReference PA/25/01309/NCListed Building Consent (S8 P&LBC 1990)

Last published check: 20 Nov 2026, 09:20. Check the council record for more recent changes.

Open council website

Status and dates

Last published check: 20 Nov 2026, 09:20 (UK)

  1. Not publishedReceivedNo date on council record
  2. DoneValidated22 Jul 2025
  3. Not publishedConsultationNo date on council record
  4. Date set by councilAgreed decision date17 Oct 2025
  5. DecidedPermit17 Oct 2025

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (6)
  1. Application Validated Date

    Published milestoneCouncil source
  2. Last Advertised In Press Date

    Published milestoneCouncil source
  3. Last Site Notice Posted Date

    Published milestoneCouncil source
  4. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source
Application type
Listed Building Consent (S8 P&LBC 1990)
Ward
St Katharines and Wapping
Documents
6 published

Proposal

Listed Building Consent for the removal of the existing sprinkler system within the North Tower of Tower Bridge while installing a new fire sprinkler system covering: North Tower; North Abutment; High-level Walkways; Reservoir; Engine Rooms; and Shop. The replacement of the gas suppression system within the Machine Rooms below the North Tower. The connection of the sprinkler and gas suppression systems to the Building Management System (BMS). The replacement of the boosted mains and domestic cold-water systems to the North Tower. Installation of external pipework on the eastern elevation of the North Abutment.

Reference
PA/25/01309/NC
Ward
St Katharines and Wapping
Agent
Purcell LLP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • OFFICERS REPORTDelegated Report17 Oct 2025View
  • DECISION_NOTICEDecision Notice17 Oct 2025View
  • HISTORIC ENGLAND ADVICEConsultee Comment19 Aug 2025View
  • HISTORIC ENGLAND AUTHORISATIONConsultee Comment19 Aug 2025View
  • Application FormApplication Form22 Jul 2025View
  • IMPORTANT NOTE!Correspondence22 Jul 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Permit
DECISION_NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.