Status on council recordCouncil status: Decided

Observation requested by London borough of Newham for Hybrid Planning Application for a phased mixed-use development comprising up to 885,000sqmGEA of floorspace and site wide Enabling Works (incl demolition, utility works, dock wall works and associated works): 1. Detailed Component. Site-wide Enabling Works and: i. 442residential units (Use Class C3) and 78,440sqmGEA of flexible nonresidential floorspace including Use Classes E, F1, F2 and Sui Generis (Drinking Establishments and Hot Food Takeaway); in buildings ranging from 2 to 13 storeys above ground; public open space, construction of estate roads and new accesses to the public highway, cycle and car parking, public realm works, the alteration, partial demolition and conversion of Millennium Mills and associated works; ii. site reclamation/dock infillworks to Pontoon Dock; iii. Temp Energy Centre; iv. Temp Construction Site Welfare Building on Pontoon Dock. 2. Outline Component (all matters reserved): comprising up to683,816 sqm GEA Residential (Use Class C3) floorspace (circa. 6,730dwellings) and flexible non-residential floorspace up to 97,892sqmGEA incl Use Classes E, B8, C1, F1, F2 and Sui Generis (Drinking Establishments; Hot Food Takeaways; Live Music Venues; Theatres; Cinemas; Commercial Kitchen and Delivery Centres; and, Infrastructure); public open space,structures in, on, or over the dock area, construction of estate roads and new accesses to the public highway, cycle, motorcycle and car parking areas and associated access, public realm works, and associated works. This Application is for a phased development that will be capable of coming forward in distinct and separable phases and/or Plots in a severable way. This is a major application that affects thesetting of listed buildings/structures and is accompanied by an Env. Statement for the purposes of Env. Impact Assessment (EIA) under the Town and Country Planning (EIA) Regulations 2017. Amendments to parameter plans, detailed design of Phases 1.1D, 1.2D and 1.9 and site wide affordable housing.

Silvertown Quays Bounded By Royal Victoria Dock Connaught Bridge And Mill Road, North Woolwich Road, Silvertown, London, E16 1UR

London Borough of Tower HamletsReference PA/25/01122/NCObservations to Other Authorities

Last published check: 20 Nov 2026, 15:52. Check the council record for more recent changes.

Status and dates

Last published check: 20 Nov 2026, 15:52 (UK)

  1. Not publishedReceivedNo date on council record
  2. DoneValidated23 Jun 2025
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedNo Objection (Observations Applications)14 Jul 2025

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (3)
  1. Application Validated Date

    Published milestoneCouncil source
  2. Decision Issued Date

    Published milestoneCouncil source
Application type
Observations to Other Authorities
Documents
2 published

Proposal

Observation requested by London borough of Newham for Hybrid Planning Application for a phased mixed-use development comprising up to 885,000sqmGEA of floorspace and site wide Enabling Works (incl demolition, utility works, dock wall works and associated works): 1. Detailed Component. Site-wide Enabling Works and: i. 442residential units (Use Class C3) and 78,440sqmGEA of flexible nonresidential floorspace including Use Classes E, F1, F2 and Sui Generis (Drinking Establishments and Hot Food Takeaway); in buildings ranging from 2 to 13 storeys above ground; public open space, construction of estate roads and new accesses to the public highway, cycle and car parking, public realm works, the alteration, partial demolition and conversion of Millennium Mills and associated works; ii. site reclamation/dock infillworks to Pontoon Dock; iii. Temp Energy Centre; iv. Temp Construction Site Welfare Building on Pontoon Dock. 2. Outline Component (all matters reserved): comprising up to683,816 sqm GEA Residential (Use Class C3) floorspace (circa. 6,730dwellings) and flexible non-residential floorspace up to 97,892sqmGEA incl Use Classes E, B8, C1, F1, F2 and Sui Generis (Drinking Establishments; Hot Food Takeaways; Live Music Venues; Theatres; Cinemas; Commercial Kitchen and Delivery Centres; and, Infrastructure); public open space,structures in, on, or over the dock area, construction of estate roads and new accesses to the public highway, cycle, motorcycle and car parking areas and associated access, public realm works, and associated works. This Application is for a phased development that will be capable of coming forward in distinct and separable phases and/or Plots in a severable way. This is a major application that affects thesetting of listed buildings/structures and is accompanied by an Env. Statement for the purposes of Env. Impact Assessment (EIA) under the Town and Country Planning (EIA) Regulations 2017. Amendments to parameter plans, detailed design of Phases 1.1D, 1.2D and 1.9 and site wide affordable housing.

Reference
PA/25/01122/NC

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • DECISION_NOTICEDecision Notice14 Jul 2025View
  • CONSULTATION LETTER FROM NEWHAM LONDON DATED: 23 JUNE 2025Correspondence24 Jun 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

No Objection (Observations Applications)
DECISION_NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.