The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 - Minor amendments to Schedule 3 Requirements KEMPF3 (Detailed design approval for permanent above-ground structures); KEMPF4 (Detailed design approval for signature ventilation columns); KEMPF5 (Detailed design approval for river wall and foreshore structure); KEMPF6 (Landscaping works) and KEMPF14 (Surface water drainage) as approved by application PA/21/01190/NC.
King Edward Memorial Park Foreshore, Glamis Road, Shadwell E1W 3EQ
The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 - Minor amendments to Schedule 3 Requirements KEMPF3 (Detailed design approval for permanent above-ground structures); KEMPF4 (Detailed design approval for signature ventilation columns); KEMPF5 (Detailed design approval for river wall and foreshore structure); KEMPF6 (Landscaping works) and KEMPF14 (Surface water drainage) as approved by application PA/21/01190/NC.
Reference
PA/25/00752/NC
Ward
St Katharines and Wapping
Agent
CVB (on behalf of Tideway
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.