ApprovedCouncil status: Decided

The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 - Minor amendments to Schedule 3 Requirements KEMPF3 (Detailed design approval for permanent above-ground structures); KEMPF4 (Detailed design approval for signature ventilation columns); KEMPF5 (Detailed design approval for river wall and foreshore structure); KEMPF6 (Landscaping works) and KEMPF14 (Surface water drainage) as approved by application PA/21/01190/NC.

King Edward Memorial Park Foreshore, Glamis Road, Shadwell E1W 3EQ

London Borough of Tower HamletsReference PA/25/00752/NCThames Tideway Tunnel DOR

Last published check: 20 Nov 2026, 23:32. Check the council record for more recent changes.

Status and dates

Last published check: 20 Nov 2026, 23:32 (UK)

  1. Not publishedReceivedNo date on council record
  2. DoneValidated20 May 2025
  3. ClosedConsultationEnded 18 Jun 2025
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedPermit27 Jun 2025

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (7)
  1. Application Validated Date

    Published milestoneCouncil source
  2. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  3. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Issued Date

    Published milestoneCouncil source
Application type
Thames Tideway Tunnel DOR
Ward
St Katharines and Wapping
Documents
53 published

Proposal

The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 - Minor amendments to Schedule 3 Requirements KEMPF3 (Detailed design approval for permanent above-ground structures); KEMPF4 (Detailed design approval for signature ventilation columns); KEMPF5 (Detailed design approval for river wall and foreshore structure); KEMPF6 (Landscaping works) and KEMPF14 (Surface water drainage) as approved by application PA/21/01190/NC.

Reference
PA/25/00752/NC
Ward
St Katharines and Wapping
Agent
CVB (on behalf of Tideway

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • OFFICERS REPORTDelegated Report27 Jun 2025View
  • DECISION_NOTICEDecision Notice27 Jun 2025View
  • HYLAND EDGAR DRIVER - DESIGN REINSTATEMENT T62 AND T63 DETAILSApproved Plan27 May 2025View
  • HYLAND EDGAR DRIVER - DESIGN KEMPF INTERTIDAL TERRACE PLANTING SCHEDULEApproved Plan27 May 2025View
  • HYLAND EDGAR DRIVER - DESIGN KEMPF PLANTING SCHEDULEApproved Plan27 May 2025View
  • DESIGN KEMPF CONSENTS SURFACE INTERFACE DETAILS - SHAFT MARKERApproved Plan27 May 2025View
  • DESIGN KEMPF CONSENTS FLOOD DEFENCE STRATEGYApproved Plan27 May 2025View
  • HYLAND EDGAR DRIVER - PERMANENT WORKS MEMORIAL BENCHES GLAVIS ROAD APPROACHApproved Plan27 May 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Permit
DECISION_NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.