Demolition of existing two storey building and erection of three storey building plus basement to form new restaurant (A3 use) and 3 x 2 bed flatsMinor Material Amendments to Planning permission Ref: PA/18/02143, Dated 05/11/2018: Amendments include: Condition 10 The condition is proposed to be varied as follows: "The ground floor Caf� Use (Class E) allowed by this permission, including any extraction equipment, shall not be operated other than between the following hours of: 08:00 - 24:00 hours, Mondays - Thursdays 08:00 - 24.30 hours, Fridays- Saturdays and 08:00 - 23:00 hours, Sundays Non-standard hours 08:00 - 02:00 hours, during the month of Ramadan and on Eid. The application is to allow the approved temporary operatonal hours to be made permanent.
Demolition of existing two storey building and erection of three storey building plus basement to form new restaurant (A3 use) and 3 x 2 bed flatsMinor Material Amendments to Planning permission Ref: PA/18/02143, Dated 05/11/2018: Amendments include: Condition 10 The condition is proposed to be varied as follows: "The ground floor Caf� Use (Class E) allowed by this permission, including any extraction equipment, shall not be operated other than between the following hours of: 08:00 - 24:00 hours, Mondays - Thursdays 08:00 - 24.30 hours, Fridays- Saturdays and 08:00 - 23:00 hours, Sundays Non-standard hours 08:00 - 02:00 hours, during the month of Ramadan and on Eid. The application is to allow the approved temporary operatonal hours to be made permanent.
Reference
PA/25/00582/NC
Ward
Weavers
Agent
Devello Strategic Limited
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.