Status on council recordCouncil status: Decided

Observation requested by Hackney Council for 'Erection of part 27 storey (125m), part 7 and part 6 storey building plus two levels of basement, to provide office floorspace (Use Class E) with retail floorspace (Use Class E) at ground floor level; landscaping to include market stalls and roof terraces; ancillary floorspace to include cycle parking, refuse/recycling storage and plant, with a loading bay and servicing access from Holywell Lane.' (RECONSULTATION DUE TO DESIGN AMENDMENTS AND SUBMISSION OF ADDITIONAL INFORMATION)

201-207 Shoreditch High Street and 1 Fairchild Street, Hackney, London, E1 6LG

London Borough of Tower HamletsReference PA/24/01081/NCObservations to Other Authorities

Status and dates

Last published check: 25 Nov 2026, 11:23 (UK)

  1. Not publishedReceivedNo date on council record
  2. DoneValidated20 Jun 2024
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedRaise Objections (Observation Applicatio25 Jul 2024

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (3)
  1. Application Validated Date

    Published milestoneCouncil source
  2. Decision Issued Date

    Published milestoneCouncil source
Application type
Observations to Other Authorities
Documents
3 published

Proposal

Observation requested by Hackney Council for 'Erection of part 27 storey (125m), part 7 and part 6 storey building plus two levels of basement, to provide office floorspace (Use Class E) with retail floorspace (Use Class E) at ground floor level; landscaping to include market stalls and roof terraces; ancillary floorspace to include cycle parking, refuse/recycling storage and plant, with a loading bay and servicing access from Holywell Lane.' (RECONSULTATION DUE TO DESIGN AMENDMENTS AND SUBMISSION OF ADDITIONAL INFORMATION)

Reference
PA/24/01081/NC

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • DECISION_NOTICEDecision Notice25 Jul 2024View
  • LETTER TO RESIDENT DATED: 03 JUL 2024Correspondence5 Jul 2024View
  • HACKNEY COUNCIL CONSULTATION LETTERCorrespondence24 Jun 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Raise Objections (Observation Applicatio
DECISION_NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.