Council planning record

Lateral reduction of three (3) trees growing along the eastern flank of the building: T2 (Sycamore): Branches to be reduced by approximately 2 metres to achieve and maintain a minimum clearance of 2 metres from the buildingT3 (Sequoia): Branches to be reduced by approximately 2 metres to achieve and maintain a minimum clearance of 2 metres from the building. T5 (Sycamore): Branches to be reduced by approximately 2 metres to achieve and maintain a minimum clearance of 2 metres from the building.

Penarth Court 2 Devonshire Avenue Sutton SM2 5LA

Application GrantedReference: TREE2026/00011London Borough of Sutton

Last published check: 28 Sept 2026, 15:45. Check the council record for more recent changes.

Application location

Penarth Court 2 Devonshire Avenue Sutton SM2 5LA

This record has no verified map location.

View council map

Application summary

Status
Application Granted
Application type
Work to a Preserved Tree
Received
2 Feb 2026
Validated
16 Mar 2026
Determination deadline
11 May 2026
Local authority
London Borough of Sutton

Application overview

Lateral reduction of three (3) trees growing along the eastern flank of the building: T2 (Sycamore): Branches to be reduced by approximately 2 metres to achieve and maintain a minimum clearance of 2 metres from the buildingT3 (Sequoia): Branches to be reduced by approximately 2 metres to achieve and maintain a minimum clearance of 2 metres from the building. T5 (Sycamore): Branches to be reduced by approximately 2 metres to achieve and maintain a minimum clearance of 2 metres from the building.

Proposal details

Reference
TREE2026/00011
Ward
Sutton South
Agent
GraftinGardeners Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 4 of 4

DocumentPublishedAction
DECISION NOTICE GRANT WPTDecision · PDF1 May 2026View
SITE LOCATION PLANSite Plan19 Mar 2026View
Application Form (No personal data)Application Form · PDF2 Feb 2026View
TreesDrawing · PDF2 Feb 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Application Granted
DECISION NOTICE GRANT WPT
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.