Council planning record

Erection of a single storey rear extension, a first floor side extension and conversion of loft space involving alterations to existing roofline, a dormer extension at rear and rooflights to front and rear roofslopes.

58 Burdon Lane Cheam SM2 7BY

Pending ConsiderationReference: DM2026/00917London Borough of Sutton

Last published check: 16 Sept 2026, 22:27. Check the council record for more recent changes.

Application location

58 Burdon Lane Cheam SM2 7BY

This record has no verified map location.

View council map

Application summary

Status
Pending Consideration
Application type
Householder Application
Received
3 Aug 2026
Validated
2 Sept 2026
Determination deadline
28 Oct 2026
Local authority
London Borough of Sutton

Application overview

Erection of a single storey rear extension, a first floor side extension and conversion of loft space involving alterations to existing roofline, a dormer extension at rear and rooflights to front and rear roofslopes.

Proposal details

Reference
DM2026/00917
Ward
Cheam
Agent
SD Engineering |

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 13 of 13

DocumentPublishedAction
Elevations - SideRevised Drawing · PDF2 Sept 2026View
SectionsRevised Drawing · PDF2 Sept 2026View
FIRE SAFETY STRATEGYSupporting Document · PDF17 Aug 2026View
Existing and Proposed Front ElevationsDrawing · PDF17 Aug 2026View
Location and Block PlansDrawing · PDF17 Aug 2026View
Existing and Proposed Roof PlansDrawing · PDF17 Aug 2026View
Proposed Second Floor PlanDrawing · PDF17 Aug 2026View
Application Form (No personal data)Application Form · PDF3 Aug 2026View
GROUND FLOOR PLANS (PROPOSED)Drawing · PDF3 Aug 2026View
FIRST FLOOR PLANS (PROPOSED)Drawing · PDF3 Aug 2026View
FIRST FLOOR PLANS (EXISTING)Drawing · PDF3 Aug 2026View
EXISTING AND PROPOSED REAR ELEVATIONSDrawing · PDF3 Aug 2026View
GROUND FLOOR PLANS (EXISTING)Drawing · PDF3 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.