ApprovedCouncil status: Application Granted

Non material amendment to approved application DM2025/00266 which allowed the 'Demolition of the existing buildings, erection of a warehouse, storage building, welfare building, weighbridge office, sprinkler pump and control room, sprinkler tanks, relocation of electrical substation and provision of new boundary treatments, access gates, parking spaces and cycle storage for use of the site as a waste transfer and recycling station,' to provide a front extension to facilitate sprinkler valve room, increase substation footprint, enlargement of sprinkler pump room, provision of external staircases to rear and vehicle access gate to front, relocation of welfare building, replacement of two sprinkler tanks with one tank, removal of high windows to rear, alteration and relocation of shutter doors, alteration to parking layout and solar panel layout and alterations to cladding colour.

122 - 124 Beddington Lane Beddington CR0 4YZ

London Borough of SuttonReference DM2026/00783Non-Material Amendment

Last published check: 20 Oct 2026, 20:03. Check the council record for more recent changes.

Status and dates

Last published check: 20 Oct 2026, 20:03 (UK)

  1. DoneReceived29 Jun 2026
  2. DoneValidated29 Jun 2026
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date27 Jul 2026
  5. DecidedApplication Granted20 Jul 2026

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Non-Material Amendment
Ward
Beddington
Documents
18 published

Proposal

Non material amendment to approved application DM2025/00266 which allowed the 'Demolition of the existing buildings, erection of a warehouse, storage building, welfare building, weighbridge office, sprinkler pump and control room, sprinkler tanks, relocation of electrical substation and provision of new boundary treatments, access gates, parking spaces and cycle storage for use of the site as a waste transfer and recycling station,' to provide a front extension to facilitate sprinkler valve room, increase substation footprint, enlargement of sprinkler pump room, provision of external staircases to rear and vehicle access gate to front, relocation of welfare building, replacement of two sprinkler tanks with one tank, removal of high windows to rear, alteration and relocation of shutter doors, alteration to parking layout and solar panel layout and alterations to cladding colour.

Reference
DM2026/00783
Ward
Beddington
Agent
Quod

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • DECISION NOTICE GRANT NMADecision20 Jul 2026View
  • OFFICER REPORTOfficer Report20 Jul 2026View
  • ENVIRONMENT AGENCY COMMENTSConsultee Comment16 Jul 2026View
  • Application Form (No personal data)Application Form29 Jun 2026View
  • Landscaping (Proposed)Drawing29 Jun 2026View
  • Site PlanDrawing29 Jun 2026View
  • Roof Plan (Proposed)Drawing29 Jun 2026View
  • Window level Plan (Proposed)Drawing29 Jun 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Application Granted
DECISION NOTICE GRANT NMA

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.