Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Ilderton Wharf 1 -7 Rollins Street London Southwark SE15 1EP
Last published check: 27 Sept 2026, 12:11. Check the council record for more recent changes.
Ilderton Wharf 1 -7 Rollins Street London Southwark SE15 1EP
This record has no verified map location.
View council mapNon-material Amendment for full planning permission 24/AP/3575 dated 17/09/2026 for Demolition of the existing buildings on the site and the construction of a linked building with a tower housing purpose built student accommodation (Use Class Sui Generis), a shoulder element housing affordable residential housing (Class C3) both with basement level, and an industrial building including affordable workspace at the southern element of the Site (Classes B2, B8, E(g)(iii), and Sui Generis), alongside the delivery of a flexible Class E unit at ground floor level, and a mixed community cafe and PBSA co-working space (Class E/Sui Generis) at ground floor level on the corner of Ilderton Road and Surrey Canal Road, in addition to the delivery of hard and soft landscaping, pedestrian and vehicle access including the provision of a loading bay on Ilderton Road, cycle parking, blue badge car parking, wider public realm improvements.The amendments include:Reduction of overall height of proposal by 1 storey, units redistributed to preserve total PBSA accommodation of 477 Beds. Reduction in basement floorspaceRelocation of two columns within the buildings colonnade.Reduction in PBSA cycle parking from 350 to 259 cycle parking spaces.C3 residential cycle parking reduced to 221 spaces. The ground floor levels have been rationalised allowing for the omission of the internal ramp and external steps, creating a more usable space in the amenity areas. The car park has been rationalised to improve efficiency of the structure and reduce embodied carbon. Rationalisation of floor plans to redistribute PBSA bedspaces and C3 residential layouts.Elevational alterations.Alteration to condition 23 (noise) wording
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| VALID APPLICATION LETTER WITH INVOICEValid Application Letter · PDF | 25 Sept 2026 | View |
| APPLICATION FORM - WITHOUT PERSONAL DATAApplication - Form (Without Personal data) · PDF | 18 Sept 2026 | View |
| TECHNICAL NOTE- PLANNING CONDITION 23Document · PDF | 18 Sept 2026 | View |
| FIRE STATEMENTFire Statement · PDF | 18 Sept 2026 | View |
| FIRE STATEMENTFire Statement · PDF | 18 Sept 2026 | View |
| DAYLIGHT OR SUNLIGHT ASSESSMENTDaylight/Sunlight assessment · PDF | 18 Sept 2026 | View |
| COVERING LETTERApplication - Covering letter · PDF | 18 Sept 2026 | View |
| NORTH AND SOUTH ELEVATIONSPlan - General · PDF | 18 Sept 2026 | View |
| PROPOSED EAST ELEVATIONPlan - Proposed · PDF | 18 Sept 2026 | View |
| PROPOSED WEST ELEVATIONPlan - Proposed · PDF | 18 Sept 2026 | View |
| ACCOMMODATION AND AREA SCHEDULE SUMMARYDocument · PDF | 18 Sept 2026 | View |
| BASEMENT FLOOR PLANPlan - General · PDF | 18 Sept 2026 | View |
| DRAWING REGISTER)Document · PDF | 18 Sept 2026 | View |
| SECTION B-B AND C-CPlan - General · PDF | 18 Sept 2026 | View |
| ROOF PLANPlan - General · PDF | 18 Sept 2026 | View |
| SECTION A-A PLANPlan - General · PDF | 18 Sept 2026 | View |
| L 25 GENERAL ARRANGEMENTPlan - General · PDF | 18 Sept 2026 | View |
| L23 - L24 GENERAL ARRANGEMENTPlan - General · PDF | 18 Sept 2026 | View |
| L19 - L22 GENERAL ARRANGEMENTPlan - General · PDF | 18 Sept 2026 | View |
| L16 - L18 PLANSPlan - General · PDF | 18 Sept 2026 | View |
| L05-10 GENERAL ARRANGEMENTPlan - General · PDF | 18 Sept 2026 | View |
| L11-13 GENERAL ARRANGEMENTPlan - General · PDF | 18 Sept 2026 | View |
| L14-15 GENERAL ARRANGEMENTPlan - General · PDF | 18 Sept 2026 | View |
| L04 GENERAL ARRANGEMENTPlan - General · PDF | 18 Sept 2026 | View |
| GROUND FLOOR PLANPlan - General · PDF | 18 Sept 2026 | View |
| L03 GENERAL ARRANGEMENTPlan - General · PDF | 18 Sept 2026 | View |
| L01 PLAN GENERAL ARRANGEMENTPlan - General · PDF | 18 Sept 2026 | View |
| L02 GENERAL ARRANGEMENTPlan - General · PDF | 18 Sept 2026 | View |
| WEST ELEVATION PLANSPlan - Proposed · PDF | 18 Sept 2026 | View |
| PROPOSED EAST ELEVATIONPlan - Proposed · PDF | 18 Sept 2026 | View |
| PROPOSED NORTH AND SOUTH ELEVATIONSPlan - Proposed · PDF | 18 Sept 2026 | View |
| SCHEDULE OF ACCOMMODATIONPlan - General · PDF | 18 Sept 2026 | View |
| BLOCK PLANSite - Block plan · PDF | 18 Sept 2026 | View |
| BASEMENT PLANPlan - General · PDF | 18 Sept 2026 | View |
| LEVEL 27 ROOFPlan - General · PDF | 18 Sept 2026 | View |
| LEVEL 26 FLOOR PLANPlan - General · PDF | 18 Sept 2026 | View |
| LEVELS 23-25 FLOOR PLANPlan - General · PDF | 18 Sept 2026 | View |
| LEVELS 11-13 FLOOR PLANPlan - General · PDF | 18 Sept 2026 | View |
| LEVELS 14-22 FLOOR PLANPlan - General · PDF | 18 Sept 2026 | View |
| LEVELS 05-10 FLOOR PLANPlan - General · PDF | 18 Sept 2026 | View |
| LEVEL 04 FLOOR PLANPlan - General · PDF | 18 Sept 2026 | View |
| LEVEL 03 FLOOR PLANPlan - General · PDF | 18 Sept 2026 | View |
| LEVEL 02 FLOOR PLANPlan - General · PDF | 18 Sept 2026 | View |
| LEVEL 01 FLOOR PLANPlan - General · PDF | 18 Sept 2026 | View |
| GROUND FLOOR PLANPlan - General · PDF | 18 Sept 2026 | View |
| SECTION A-APlan - General · PDF | 18 Sept 2026 | View |
| SECTION B-B AND SECTION C-CPlan - General · PDF | 18 Sept 2026 | View |
| GATEWAY ONE FIRE STATEMENTDocument · PDF | 18 Sept 2026 | View |
| DESIGN AND ACCESS STATEMENT ADDENDUM AND JUSTIFICATIONDesign and Access statement · PDF | 18 Sept 2026 | View |
| COMMUNITY INFRASTRUCTURE LEVY - COMPLETED FORMCIL - GIA Form · PDF | 18 Sept 2026 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceWe haven’t collected any decision conditions for this application.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.