Council planning record

Construction of a ground-floor side-rear extension with terrace reinstated above; alterations to the rear outrigger, including raising the eaves and ridge, removal of the chimney stack, replacement windows, and installation of two rooflights; enlargement of the existing rear dormer; erection of bin and bike stores in the front garden, together with new landscaping and a front boundary wall; installation of an EV charger to front elevation and removal of existing front porch door; removal of existing garden buildings and erection of a shed, sauna and pergola in the rear garden, together with new landscaping and decking.

65 Calton Avenue London Southwark SE21 7DF

Under consideration/assessmentReference: 26/AP/2517London Borough of Southwark

Last published check: 21 Sept 2026, 00:19. Check the council record for more recent changes.

Application location

65 Calton Avenue London Southwark SE21 7DF

This record has no verified map location.

View council map

Application summary

Status
Under consideration/assessment
Application type
Householder Application
Received
24 Aug 2026
Validated
3 Sept 2026
Determination deadline
28 Oct 2026
Local authority
London Borough of Southwark

Application overview

Construction of a ground-floor side-rear extension with terrace reinstated above; alterations to the rear outrigger, including raising the eaves and ridge, removal of the chimney stack, replacement windows, and installation of two rooflights; enlargement of the existing rear dormer; erection of bin and bike stores in the front garden, together with new landscaping and a front boundary wall; installation of an EV charger to front elevation and removal of existing front porch door; removal of existing garden buildings and erection of a shed, sauna and pergola in the rear garden, together with new landscaping and decking.

Proposal details

Reference
26/AP/2517
Ward
Dulwich Village
Agent
The Vawdrey House

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 32 of 32

DocumentPublishedAction
PRESS NOTICE - 10/09/2026Press Notice · PDF8 Sept 2026View
VALID APPLICATION LETTER WITH INVOICEValid Application Letter · PDF4 Sept 2026View
FILE COPY - NEIGHBOUR NOTIFICATION+LISTNeighbour Notification List · PDF4 Sept 2026View
HERITAGE STATEMENTHeritage statement · PDF3 Sept 2026View
EXISTING NORTH SIDE ELEVATIONPlan - Existing · PDF3 Sept 2026View
PROPOSED NORTH SIDE ELEVATIONPlan - Proposed · PDF3 Sept 2026View
PROPOSED SHED PLAN AND ELEVATIONSPlan - Proposed · PDF3 Sept 2026View
DESIGN AND ACCESS STATEMENTDesign and Access statement · PDF26 Aug 2026View
FIRE STRATEGY REASONABLE EXCEPTION STATEMENT.Fire Statement · PDF26 Aug 2026View
EXISTING SECTION AAPlan - Existing · PDF26 Aug 2026View
PROPOSED SECTION AAPlan - Proposed · PDF26 Aug 2026View
APPLICATION FORM - WITHOUT PERSONAL DATAApplication - Form (Without Personal data) · PDF24 Aug 2026View
LOCATION PLANSite - Location plan · PDF24 Aug 2026View
PROPOSED ELEVATION (REAR)Plan - Proposed · PDF24 Aug 2026View
PROPOSED ELEVATION (SIDE)Plan - Proposed · PDF24 Aug 2026View
PROPOSED BINS AND BIKE STORES ELEVATIONSPlan - Proposed · PDF24 Aug 2026View
PROPOSED ELEVATION (FRONT)Plan - Proposed · PDF24 Aug 2026View
PROPOSED ROOF PLANPlan - Proposed · PDF24 Aug 2026View
PROPOSED SECOND FLOOR PLANPlan - Proposed · PDF24 Aug 2026View
PROPOSED FIRST FLOOR PLANPlan - Proposed · PDF24 Aug 2026View
PROPOSED GROUND FLOOR PLANPlan - Proposed · PDF24 Aug 2026View
PROPOSED SITE PLANPlan - Proposed · PDF24 Aug 2026View
EXISTING ELEVATION (REAR)Plan - Existing · PDF24 Aug 2026View
EXISTING ELEVATION (SIDE)Plan - Existing · PDF24 Aug 2026View
EXISTING FIRST FLOOR PLANPlan - Existing · PDF24 Aug 2026View
EXISTING SECOND FLOOR PLANPlan - Existing · PDF24 Aug 2026View
EXISTING ELEVATION (FRONT)Plan - Existing · PDF24 Aug 2026View
EXISTING ROOF PLANPlan - Existing · PDF24 Aug 2026View
EXISTING SITE PLANPlan - Existing · PDF24 Aug 2026View
EXISTING FLOOR PLANPlan - Existing · PDF24 Aug 2026View
PROPOSED PERGOLA PLAN AND ELEVATIONSPlan - Proposed · PDF24 Aug 2026View
COMMUNITY INFRASTRUCTURE LEVY - COMPLETED FORMCIL - GIA Form · PDF24 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.