Council planning record

Redevelopment of the site to include demolition of no. 229 and Pocock House, erection of a purpose built student accommodation building (Sui Generis), retention and remodeling of nos. 231 and 233 to provide flexible commercial/community floorspace (Class E / Class F1 / Class F2), with associated public realm, access, car parking, cycle parking, hard and soft landscaping and other ancillary works. For information only: - The proposed PBSA building including additional rooftop plant/enclosure is Maximum 150.655m AOD/147.055m above ground and is 45 storeys. The maximum height of the remodeling of Nos 231 and 233 is 18.745m AOD/15.145m above ground.The development as a whole comprises:- 798 bedrooms: 851 bedspaces - 255 sqm GIA of flexible commercial, learning and non-residential institution floorspace (Class E / F1/F2 use);The application is accompanied by an Environmental Statement (ES) in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended). This can be viewed on Southwark Council's Public Access for Planning Register. Hard copies of the ES are available for inspection at the John Harvard Library, 211 Borough High St, London SE1 1JA (Monday to Friday 9am to 7pm, Saturday 9am-5pm). Hard copies can also be purchased from DP9 Ltd100 Pall Mall, London, SW1Y 5NQ, telephone: 020 7004 1700

229-235 Southwark Bridge Road London Southwark SE1 6NP

Under consideration/assessmentReference: 26/AP/2320London Borough of Southwark

Last published check: 16 Sept 2026, 19:50. Check the council record for more recent changes.

Application location

229-235 Southwark Bridge Road London Southwark SE1 6NP

This record has no verified map location.

View council map

Application summary

Status
Under consideration/assessment
Application type
Major application
Received
3 Aug 2026
Validated
10 Sept 2026
Determination deadline
10 Dec 2026
Local authority
London Borough of Southwark

Application overview

Redevelopment of the site to include demolition of no. 229 and Pocock House, erection of a purpose built student accommodation building (Sui Generis), retention and remodeling of nos. 231 and 233 to provide flexible commercial/community floorspace (Class E / Class F1 / Class F2), with associated public realm, access, car parking, cycle parking, hard and soft landscaping and other ancillary works. For information only: - The proposed PBSA building including additional rooftop plant/enclosure is Maximum 150.655m AOD/147.055m above ground and is 45 storeys. The maximum height of the remodeling of Nos 231 and 233 is 18.745m AOD/15.145m above ground.The development as a whole comprises:- 798 bedrooms: 851 bedspaces - 255 sqm GIA of flexible commercial, learning and non-residential institution floorspace (Class E / F1/F2 use);The application is accompanied by an Environmental Statement (ES) in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended). This can be viewed on Southwark Council's Public Access for Planning Register. Hard copies of the ES are available for inspection at the John Harvard Library, 211 Borough High St, London SE1 1JA (Monday to Friday 9am to 7pm, Saturday 9am-5pm). Hard copies can also be purchased from DP9 Ltd100 Pall Mall, London, SW1Y 5NQ, telephone: 020 7004 1700

Proposal details

Reference
26/AP/2320
Ward
St Georges
Agent
DP9 Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 237 of 237

DocumentPublishedAction
PRESS NOTICE - 17/09/2026Press Notice · PDF15 Sept 2026View
FILE COPY - NEIGHBOUR NOTIFICATION+LISTNeighbour Notification List · PDF15 Sept 2026View
EXISTING SOUTH ELEVATIONPlan - Existing · PDF11 Sept 2026View
CIRCULAR ECONOMY GLA PLANNING SPEADSHEETCircular Economy Statement11 Sept 2026View
VALID APPLICATION LETTER WITH INVOICEValid Application Letter · PDF11 Sept 2026View
DRAWING REGISTER AND ISSUE SHEET REV P10Plan - Drawing Register · PDF3 Sept 2026View
REVISED UNIT SCHEDULE SCAPESchedule of Accommodation · PDF3 Sept 2026View
PROPOSED SECTION - 231-233 SOUTHWARK BRIDGE ROADPlan - Proposed · PDF3 Sept 2026View
ACCOMMODATION SCHEDULESchedule of Accommodation · PDF3 Sept 2026View
BE SEEN SPREADSHEETDocument19 Aug 2026View
GLA CARBON EMISSIONS REPORTING SPREADSHEETDocument19 Aug 2026View
WLC GLA PLANNING SPREADSHEETDocument19 Aug 2026View
FORM 1 CIL ADDITIONAL INFORMATIONCIL - GIA Form · PDF6 Aug 2026View
HERITAGE IMPACT ASSESSMENT - MAY 2026Heritage statement · PDF5 Aug 2026View
ES VOL 3 APP MAY 2026 CHAPTER 1 INTRODUCTIONEnvironmental statement · PDF5 Aug 2026View
ES VOL 3 APP MAY 2026 CHAPTER 8 AIR QUALITYEnvironmental statement · PDF5 Aug 2026View
ES VOL 3 APP MAY 2026 2.1 EIA SCOPING REPORT PART 1 OF 2Environmental statement · PDF5 Aug 2026View
ES VOL 3 APP MAY 2026 2.1 EIA SCOPING REPORT PART 2 OF 2Environmental statement · PDF5 Aug 2026View
APPLICATION FORM - WITHOUT PERSONAL DATAApplication - Form (Without Personal data) · PDF3 Aug 2026View
EXISTING LEVEL 00 FLOOR PLANPlan - Existing · PDF3 Aug 2026View
EXISTING LEVEL 01 FLOOR PLANPlan - Existing · PDF3 Aug 2026View
EXISTING LEVEL 02 FLOOR PLANPlan - Existing · PDF3 Aug 2026View
EXISTING LEVEL 03 FLOOR PLANPlan - Existing · PDF3 Aug 2026View
EXISTING LEVEL 04 FLOOR PLANPlan - Existing · PDF3 Aug 2026View
EXISTING LEVEL B1 FLOOR PLANPlan - Existing · PDF3 Aug 2026View
EXISTING ROOF LEVELPlan - Existing · PDF3 Aug 2026View
EXISTING NORTH ELEVATIONPlan - Existing · PDF3 Aug 2026View
EXISTING WEST ELEVATIONPlan - Existing · PDF3 Aug 2026View
EXISTING EAST ELEVATIONPlan - Existing · PDF3 Aug 2026View
EXISTING SITE LOCATION PLANSite - Location plan · PDF3 Aug 2026View
PROPOSED LEVEL 00 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 01 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 02 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 03 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 04 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED SECTION AAPlan - Proposed · PDF3 Aug 2026View
PROPOSED SECTION BBPlan - Proposed · PDF3 Aug 2026View
PROPOSED SECTION CCPlan - Proposed · PDF3 Aug 2026View
TYPICAL BAY ELEVATION 01Plan - Proposed · PDF3 Aug 2026View
TYPICAL BAY ELEVATION 02Plan - Proposed · PDF3 Aug 2026View
TYPICAL BAY ELEVATION 03Plan - Proposed · PDF3 Aug 2026View
TYPICAL BAY ELEVATION 04Plan - Proposed · PDF3 Aug 2026View
TYPICAL BAY ELEVATION 05Plan - Proposed · PDF3 Aug 2026View
PROPOSED SITE LOCATION PLANSite - Location plan · PDF3 Aug 2026View
PROPOSED LEVEL 05 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 06 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 07 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 08 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 09 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 10 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 11 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 12 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 13 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 14 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 15 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 16 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 17 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 18 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 20 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 21 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 22 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 23 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 24 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 25 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 26 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 27 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 28 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 29 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 30 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 31 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 19 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 32 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 33 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 34 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 35 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 36 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 37 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 38 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 39 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 40 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 41 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 42 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 43 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED ROOF LEVELPlan - Proposed · PDF3 Aug 2026View
PROPOSED OVERRUN LEVELPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 00-03 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
PROPOSED NORTH ELEVATIONPlan - Proposed · PDF3 Aug 2026View
PROPOSED WEST ELEVATIONPlan - Proposed · PDF3 Aug 2026View
PROPOSED EAST ELEVATIONPlan - Proposed · PDF3 Aug 2026View
PROPOSED SOUTH ELEVATIONPlan - Proposed · PDF3 Aug 2026View
PROPOSED LEVEL 44 FLOOR PLANPlan - Proposed · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT - JULY 2026Design and Access statement · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT - JULY 2026Design and Access statement · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT - JULY 2026Design and Access statement · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT - JULY 2026Design and Access statement · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT - JULY 2026Design and Access statement · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT - JULY 2026Design and Access statement · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT - JULY 2026Design and Access statement · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT - JULY 2026Design and Access statement · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT - JULY 2026Design and Access statement · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT - JULY 2026Design and Access statement · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT - JULY 2026Design and Access statement · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT - JULY 2026Design and Access statement · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT - JULY 2026Design and Access statement · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT - JULY 2026Design and Access statement · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT - JULY 2026Design and Access statement · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT - JULY 2026Design and Access statement · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT - JULY 2026Design and Access statement · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT - JULY 2026Design and Access statement · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT - JULY 2026Design and Access statement · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT - JULY 2026Design and Access statement · PDF3 Aug 2026View
FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY - JULY 2026Flood risk assessment · PDF3 Aug 2026View
FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY - JULY 2026Flood risk assessment · PDF3 Aug 2026View
FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY - JULY 2026Flood risk assessment · PDF3 Aug 2026View
FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY - JULY 2026Flood risk assessment · PDF3 Aug 2026View
FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY - JULY 2026Flood risk assessment · PDF3 Aug 2026View
FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY - JULY 2026Flood risk assessment · PDF3 Aug 2026View
FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY - JULY 2026Flood risk assessment · PDF3 Aug 2026View
FINANCIAL VIABILITY ASSESSMENT WITH APPENDICESViability report · PDF3 Aug 2026View
FINANCIAL VIABILITY ASSESSMENT WITH APPENDICESViability report · PDF3 Aug 2026View
FINANCIAL VIABILITY ASSESSMENT WITH APPENDICESViability report · PDF3 Aug 2026View
FINANCIAL VIABILITY ASSESSMENT WITH APPENDICESViability report · PDF3 Aug 2026View
FINANCIAL VIABILITY ASSESSMENT WITH APPENDICESViability report · PDF3 Aug 2026View
HERITAGE IMPACT ASSESSMENT - MAY 2026Heritage statement · PDF3 Aug 2026View
HERITAGE IMPACT ASSESSMENT - MAY 2026Heritage statement · PDF3 Aug 2026View
HERITAGE IMPACT ASSESSMENT - MAY 2026Heritage statement · PDF3 Aug 2026View
HERITAGE IMPACT ASSESSMENT - MAY 2026Heritage statement · PDF3 Aug 2026View
HERITAGE IMPACT ASSESSMENT - MAY 2026Heritage statement · PDF3 Aug 2026View
HERITAGE IMPACT ASSESSMENT - MAY 2026Heritage statement · PDF3 Aug 2026View
HERITAGE IMPACT ASSESSMENT - MAY 2026Heritage statement · PDF3 Aug 2026View
HERITAGE IMPACT ASSESSMENT - MAY 2026Heritage statement · PDF3 Aug 2026View
LANDSCAPE GIA PLAN - GROUND FLOORLandscaping details · PDF3 Aug 2026View
LANDSCAPE ILLUSTRATIVE MASTERPLANLandscaping details · PDF3 Aug 2026View
LANDSCAPE GIA PLAN - ROOF LEVELSLandscaping details · PDF3 Aug 2026View
LANDSCAPE GIA PLAN - ROOF TERRACELandscaping details · PDF3 Aug 2026View
ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026Environmental statement · PDF3 Aug 2026View
ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026Environmental statement · PDF3 Aug 2026View
ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026Environmental statement · PDF3 Aug 2026View
ENVIRONMENTAL STATEMENT VOLUME 2 HTVIA - JULY 2026Environmental statement · PDF3 Aug 2026View
ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026Environmental statement · PDF3 Aug 2026View
ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026Environmental statement · PDF3 Aug 2026View
ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026Environmental statement · PDF3 Aug 2026View
ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026Environmental statement · PDF3 Aug 2026View
ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026Environmental statement · PDF3 Aug 2026View
ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026Environmental statement · PDF3 Aug 2026View
ENVIRONMENTAL STATEMENT VOLUME 2 HTVIA - JULY 2026Environmental statement · PDF3 Aug 2026View
ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026Environmental statement · PDF3 Aug 2026View
ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026Environmental statement · PDF3 Aug 2026View
ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026Environmental statement · PDF3 Aug 2026View
ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026Environmental statement · PDF3 Aug 2026View
ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026Environmental statement · PDF3 Aug 2026View
ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026Environmental statement · PDF3 Aug 2026View
ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026Environmental statement · PDF3 Aug 2026View
ES VOL 3 APPENDICES - MAY 2026 CHAPTER 1Environmental statement · PDF3 Aug 2026View
ES VOL 3 APPENDICES - MAY 2026 2.2 EIA SCEnvironmental statement · PDF3 Aug 2026View
ES VOL 3 APPENDICES - MAY 2026 CHAPTER 9Environmental statement · PDF3 Aug 2026View
ES VOL 3 APP MAY 2026 10.1 ARCHAEOLOGICAL DESK BASED ASSESSMENTEnvironmental statement · PDF3 Aug 2026View
ES VOL 3 APP MAY 2026 11.1 FLOOD RISK ASSESSMENT PART 1 OF 7Environmental statement · PDF3 Aug 2026View
ES VOL 3 APP MAY 2026 11.1 FLOOD RISK ASSESSMENT PART 2 OF 7Environmental statement · PDF3 Aug 2026View
ES VOL 3 APP MAY 2026 11.1 FLOOD RISK ASSESSMENT PART 3 OF 7Environmental statement · PDF3 Aug 2026View
ES VOL 3 APP MAY 2026 11.1 FLOOD RISK ASSESSMENT PART 4 OF 7Environmental statement · PDF3 Aug 2026View
ES VOL 3 APP MAY 2026 11.1 FLOOD RISK ASSESSMENT PART 5 OF 7Environmental statement · PDF3 Aug 2026View
ES VOL 3 APP MAY 2026 11.1 FLOOD RISK ASSESSMENT PART 6 OF 7Environmental statement · PDF3 Aug 2026View
ES VOL 3 APP MAY 2026 11.1 FLOOD RISK ASSESSMENT PART 7 OF 7Environmental statement · PDF3 Aug 2026View
ES VOL 3 APP MAY 2026 12.1 DAYLIGHT AND SUNLIGHT DRAWINGSEnvironmental statement · PDF3 Aug 2026View
ES VOL 3 APP MAY 2026 12.2 DRAWINGS OF WINDOWS ASSESSED PART 1 OEnvironmental statement · PDF3 Aug 2026View
ES VOL 3 APP MAY 2026 12.2 DRAWINGS OF WINDOWS ASSESSED PART 2 OEnvironmental statement · PDF3 Aug 2026View
ES VOL 3 APP MAY 2026 12.3 AND 12.4 DAYLIGHT AND SUNLIGHT ANALYSEnvironmental statement · PDF3 Aug 2026View
ES VOL 3 APP MAY 2026 12.5 OVERSHADOWING ASSESSMENTEnvironmental statement · PDF3 Aug 2026View
ES VOL 3 APP MAY 2026 2.3 INFORMAL EIA SCOPING REVIEWEnvironmental statement · PDF3 Aug 2026View
ES VOL 3 APP MAY 2026 2.4 HEALTH IMPACT ASSESSMENTEnvironmental statement · PDF3 Aug 2026View
ES VOL 3 APP MAY 2026 2.5 CUMULATIVE SCHEMES ASSESSEDEnvironmental statement · PDF3 Aug 2026View
ES VOL 3 APP MAY 2026 4.1 PLANNING APPLICATION DRAWINGS PART 1Environmental statement · PDF3 Aug 2026View
ES VOL 3 APP MAY 2026 4.1 PLANNING APPLICATION DRAWINGS PART 2Environmental statement · PDF3 Aug 2026View
ES VOL 3 APP MAY 2026 12.6 SOLAR GLARE SCEENING EXERCISE PART 1Environmental statement · PDF3 Aug 2026View
ES VOL 3 APP MAY 2026 12.6 SOLAR GLARE SCEENING EXERCISE PART 2Environmental statement · PDF3 Aug 2026View
ES VOL 3 APP MAY 2026 12.6 SOLAR GLARE SCEENING EXERCISE PART 3Environmental statement · PDF3 Aug 2026View
ES VOL 3 APP MAY 2026 12.6 SOLAR GLARE SCEENING EXERCISE PART 4Environmental statement · PDF3 Aug 2026View
ES VOL 3 APP MAY 2026 12.6 SOLAR GLARE SCEENING EXERCISE PART 5Environmental statement · PDF3 Aug 2026View
ES VOL 3 APP MAY 2026 12.6 SOLAR GLARE SCEENING EXERCISE PART 6Environmental statement · PDF3 Aug 2026View
ES VOL 3 APP MAY 2026 12.6 SOLAR GLARE SCEENING EXERCISE PART 7Environmental statement · PDF3 Aug 2026View
ES VOL 3 APP MAY 2026 12.7 SOLAR GLARE DETAILED ASSESSMENT PARTEnvironmental statement · PDF3 Aug 2026View
ES VOL 3 APP MAY 2026 12.7 SOLAR GLARE DETAILED ASSESSMENT PARTEnvironmental statement · PDF3 Aug 2026View
EDUCATION NEEDS ASSESSMENT - JULY 2026Document · PDF3 Aug 2026View
ENGAGEMENT SUMMARY - JULY 2026Document · PDF3 Aug 2026View
ARCHAEOLOGICAL DESK-BASED ASSESSMENT - JULY 2026Document · PDF3 Aug 2026View
EQUALITY IMPACT ASSESSMENT - JULY 2026Document · PDF3 Aug 2026View
LANDSCAPE DRAWING ISSUE REGISTERLandscaping details · PDF3 Aug 2026View
PBSA NEEDS ASSESSMENT - JULY 2026Document · PDF3 Aug 2026View
PLANNING STATEMENT - JULY 2026Document · PDF3 Aug 2026View
STUDENT MANAGEMENT PLAN - JULY 2026Document · PDF3 Aug 2026View
TRANSPORT ASSESSMENT - JULY 2026Transport assessment · PDF3 Aug 2026View
TRAVEL PLAN - JULY 2026Document · PDF3 Aug 2026View
VENTILATION STATEMENT - JULY 2026Vent/extraction statement · PDF3 Aug 2026View
WHOLE LIFE CYCLE CARBON ASSESSMENT - JULY 2026Document · PDF3 Aug 2026View
CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN - JULY 2026Construction Environmental Management Plan CEMP · PDF3 Aug 2026View
DELIVERY AND SERVICING PLAN - JULY 2026Document · PDF3 Aug 2026View
SUSTAINABILITY STATEMENT - JULY 2026Document · PDF3 Aug 2026View
DRAWING REGISTER AND ISSUE SHEETPlan - Drawing Register · PDF3 Aug 2026View
ENERGY STATEMENT - JULY 2026Energy statement · PDF3 Aug 2026View
GEO AND GEOENV PRELIMINARY RISK ASSESSMENT (DESK STUDY) - JUNE 2Environmental statement · PDF3 Aug 2026View
ENERGY STATEMENT - JULY 2026Energy statement · PDF3 Aug 2026View
LONDON PLAN FIRE STATEMENT - JULY 2026Fire Statement · PDF3 Aug 2026View
GEO AND GEOENV PRELIMINARY RISK ASSESSMENT (DESK STUDY) - JUNE 20Environmental statement · PDF3 Aug 2026View
LONDON PLAN FIRE STATEMENT - JULY 2026Fire Statement · PDF3 Aug 2026View
UTILITIES ASSESSMENT REPORT - JULY 2026Utilities statement · PDF3 Aug 2026View
LONDON PLAN FIRE STATEMENT - JULY 2026Fire Statement · PDF3 Aug 2026View
LANDSCAPE DESIGN AND ACCESS STATEMENT - JUNE 2026Landscaping and open space statement · PDF3 Aug 2026View
UTILITIES ASSESSMENT REPORT - JULY 2026Utilities statement · PDF3 Aug 2026View
ACCOMMODATION SCHEDULEDocument · PDF3 Aug 2026View
LANDSCAPE DESIGN AND ACCESS STATEMENT - JUNE 2026Landscaping and open space statement · PDF3 Aug 2026View
GEO AND GEOENV PRELIMINARY RISK ASSESSMENT (DESK STUDY) - JUNE 20Environmental statement · PDF3 Aug 2026View
UTILITIES ASSESSMENT REPORT - JULY 2026Utilities statement · PDF3 Aug 2026View
GEO AND GEOENV PRELIMINARY RISK ASSESSMENT (DESK STUDY) - JUNE 20Environmental statement · PDF3 Aug 2026View
GEO AND GEOENV PRELIMINARY RISK ASSESSMENT (DESK STUDY) - JUNE 20Environmental statement · PDF3 Aug 2026View
UTILITIES ASSESSMENT REPORT - JULY 2026Utilities statement · PDF3 Aug 2026View
GEO AND GEOENV PRELIMINARY RISK ASSESSMENT (DESK STUDY) - JUNE 20Environmental statement · PDF3 Aug 2026View
GEO AND GEOENV PRELIMINARY RISK ASSESSMENT (DESK STUDY) - JUNE 20Environmental statement · PDF3 Aug 2026View
GEO AND GEOENV PRELIMINARY RISK ASSESSMENT (DESK STUDY) - JUNE 20Environmental statement · PDF3 Aug 2026View
GEO AND GEOENV PRELIMINARY RISK ASSESSMENT (DESK STUDY) - JUNE 20Environmental statement · PDF3 Aug 2026View
GEO AND GEOENV PRELIMINARY RISK ASSESSMENT (DESK STUDY) - JUNE 2Environmental statement · PDF3 Aug 2026View
GEO AND GEOENV PRELIMINARY RISK ASSESSMENT (DESK STUDY) - JUNE 2Environmental statement · PDF3 Aug 2026View
GEO AND GEOENV PRELIMINARY RISK ASSESSMENT (DESK STUDY) - JUNE 20Environmental statement · PDF3 Aug 2026View
ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026Environmental statement · PDF3 Aug 2026View
ENVIRONMENTAL STATEMENT VOLUME 2 HTVIA - JULY 2026Environmental statement · PDF3 Aug 2026View
ENVIRONMENTAL STATEMENT VOLUME 2 HTVIA - JULY 2026Environmental statement · PDF3 Aug 2026View
ENVIRONMENTAL STATEMENT VOLUME 2 HTVIA - JULY 2026Environmental statement · PDF3 Aug 2026View
ENVIRONMENTAL STATEMENT VOLUME 2 HTVIA - JULY 2026Environmental statement · PDF3 Aug 2026View
ENVIRONMENTAL STATEMENT VOLUME 2 HTVIA - JULY 2026Environmental statement · PDF3 Aug 2026View
ECOLOGICAL IMPACT ASSESSMENT - JULY 2026Biodiversity survey / ecology assessment · PDF3 Aug 2026View
GATEWAY 1 FIRE STATEMENT - JULY 2026Fire Statement · PDF3 Aug 2026View
SITE WASTE MANAGEMENT PLAN - JULY 2026Document · PDF3 Aug 2026View
STATEMENT OF COMMUNITY INVOLVEMENT - JULY 2026Statement of community involvement · PDF3 Aug 2026View
CIRCULAR ECONOMY STATEMENT - JULY 2026Economic statement · PDF3 Aug 2026View
CIRCULAR ECONOMY STATEMENT - JULY 2026Economic statement · PDF3 Aug 2026View
LANDSCAPE DESIGN AND ACCESS STATEMENT - JUNE 2026Landscaping and open space statement · PDF3 Aug 2026View
COVER LETTERApplication - Covering letter · PDF30 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.