ApprovedCouncil status: Granted

Listed building consent for internal refurbishment of Flat 5 including replacement kitchen, replacement ensuite, installation of a dressing room, alterations to the existing modern suspended plasterboard ceiling including replacement to allow for re-wiring and changes to the existing ceiling layout, partial replacement of the existing modern raised flooring

5 Tempus Wharf 29 Bermondsey Wall West London Southwark SE16 4RW

London Borough of SouthwarkReference 26/AP/2231Listed Building Consent

Last published check: 21 Sept 2026, 20:54. Check the council record for more recent changes.

Open council website

Status and dates

Last published check: 21 Sept 2026, 20:54 (UK)

  1. DoneReceived28 Jul 2026
  2. DoneValidated30 Jul 2026
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date23 Sept 2026
  5. DecidedListed Building Consent - GRANTED11 Sept 2026

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (7)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Decision Made Date

    Published milestoneCouncil source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Listed Building Consent
Ward
North Bermondsey
Documents
20 published

Proposal

Listed building consent for internal refurbishment of Flat 5 including replacement kitchen, replacement ensuite, installation of a dressing room, alterations to the existing modern suspended plasterboard ceiling including replacement to allow for re-wiring and changes to the existing ceiling layout, partial replacement of the existing modern raised flooring

Reference
26/AP/2231
Ward
North Bermondsey
Agent
Mohns & Sanders

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • DECISION NOTICE - LBC - GRANTDecision - Notice11 Sept 2026View
  • OFFICER ASSESSMENTDecision - Officer Report11 Sept 2026View
  • PROPOSED PLASTERBOARD JUNCTIONSDecision - Plans26 Aug 2026View
  • PROPOSED SECONDARY GLAZING TO THE EN-SUITEDecision - Plans26 Aug 2026View
  • SITE NOTICESite notice5 Aug 2026View
  • FILE COPY - NEIGHBOUR NOTIFICATION+LISTNeighbour Notification List3 Aug 2026View
  • VALID APPLICATION LETTER WITH INVOICEValid Application Letter2 Aug 2026View
  • PROPOSED SECTIONS / ELEVATIONS C-C, D-DDecision - Plans30 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Listed Building Consent - GRANTED
DECISION NOTICE - LBC - GRANT OFFICER ASSESSMENT PROPOSED PLASTERBOARD JUNCTIONS PROPOSED SECONDARY GLAZING TO THE EN-SUITE PROPOSED SECTIONS / ELEVATIONS C-C, D-D PROPOSED FLOOR PLAN PROPOSED RCP PLAN PROPOSED FLOOR PLAN PROPOSED STRIP OUT
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.