Council planning record

Details of Condition 3 (CEMP) as required by full planning permission 23/AP/3273 dated 19/11/2025 for 'Refurbishment of South Dock Marina boatyard to include demolition and removal of all buildings and structures on site, renew services infrastructure, new electricity substation, underground drainage, and hard standings and provide new workshops, studios, toilets showers laundry and associated landscape. Construct new covered boat repair areas with associated gantry and staircase. Removal of the existing crane and replace with new crane, pontoon adjacent to the crane and associated public realm works to the crane area. Addition of new trees to the river walk.'

South Dock Marina St Georges Wharf Rope Street London Southwark SE16

Under consideration/assessmentReference: 26/AP/1893London Borough of Southwark

Last published check: 28 Sept 2026, 08:59. Check the council record for more recent changes.

Application location

South Dock Marina St Georges Wharf Rope Street London Southwark SE16

This record has no verified map location.

View council map

Application summary

Status
Under consideration/assessment
Application type
Approval of Details
Received
30 Jun 2026
Validated
3 Jul 2026
Determination deadline
27 Aug 2026
Local authority
London Borough of Southwark

Application overview

Details of Condition 3 (CEMP) as required by full planning permission 23/AP/3273 dated 19/11/2025 for 'Refurbishment of South Dock Marina boatyard to include demolition and removal of all buildings and structures on site, renew services infrastructure, new electricity substation, underground drainage, and hard standings and provide new workshops, studios, toilets showers laundry and associated landscape. Construct new covered boat repair areas with associated gantry and staircase. Removal of the existing crane and replace with new crane, pontoon adjacent to the crane and associated public realm works to the crane area. Addition of new trees to the river walk.'

Proposal details

Reference
26/AP/1893
Ward
Surrey Docks
Agent
Fuller Long

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 5 of 5

DocumentPublishedAction
VEHICLE SWEPT PATH ANALYSISDocument4 Aug 2026View
CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANDocument · PDF29 Jul 2026View
VALID APPLICATION LETTER WITH INVOICEValid Application Letter · PDF6 Jul 2026View
APPLICATION FORM - WITHOUT PERSONAL DATAApplication - Form (Without Personal data) · PDF30 Jun 2026View
FORM 6Document · PDF30 Jun 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.