Council planning record

Minor material amendment (S73) pursuant to planning permission 22/AP/2295 dated 12.03.2024 (BY1) for the 'Construction of a lower ground, upper ground and 18 storey building comprising Use Class E (office and retail) floorspace incorporating internal amendments to part of the existing site-wide basement at levels B1 and B2 and all landscaping, public realm and highways improvements together with all associated and ancillary works.'Amendments include:-Height and massing increase-Rooftop reconfiguration-Repositioning of inset balconies (from corners to centre of northern elevation)-Alterations to public realm (planters, benches, paving)-Elevational treatment (cladding, planting, shading fins)-Base of building (concrete raking column structure)-Blackfriars station entrance (reduction of roof 'wings')

Bankside Yards (BY1) 245 Blackfriars Road London SE1

Under consideration/assessmentReference: 26/AP/1338London Borough of Southwark

Last published check: 28 Sept 2026, 17:45. Check the council record for more recent changes.

Application location

Bankside Yards (BY1) 245 Blackfriars Road London SE1

This record has no verified map location.

View council map

Application summary

Status
Under consideration/assessment
Application type
S.73 Vary/Remove Conds/Minor Alterations
Received
11 May 2026
Validated
12 May 2026
Determination deadline
11 Aug 2026
Local authority
London Borough of Southwark

Application overview

Minor material amendment (S73) pursuant to planning permission 22/AP/2295 dated 12.03.2024 (BY1) for the 'Construction of a lower ground, upper ground and 18 storey building comprising Use Class E (office and retail) floorspace incorporating internal amendments to part of the existing site-wide basement at levels B1 and B2 and all landscaping, public realm and highways improvements together with all associated and ancillary works.'Amendments include:-Height and massing increase-Rooftop reconfiguration-Repositioning of inset balconies (from corners to centre of northern elevation)-Alterations to public realm (planters, benches, paving)-Elevational treatment (cladding, planting, shading fins)-Base of building (concrete raking column structure)-Blackfriars station entrance (reduction of roof 'wings')

Proposal details

Reference
26/AP/1338
Ward
Borough & Bankside
Agent
DP9

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 65 of 65

DocumentPublishedAction
SITE NOTICESite notice · PDF3 Sept 2026View
BY1_GLA CARBON EMISSIONSDocument26 Aug 2026View
AMBIENT LOOP ESERIESDocument · PDF26 Aug 2026View
SWE_2026-07-29_ROOF MARK UP_BY1Document · PDF26 Aug 2026View
BANKSIDE YARDS - BY1 - CYCLE PARKING STRATEGY_V2Parking Provision · PDF26 Aug 2026View
VALID APPLICATION LETTER WITH INVOICEValid Application Letter · PDF2 Jul 2026View
ENVIRONMENT AGENCYStatutory consultee replies · PDF22 Jun 2026View
THAMES WATERStatutory consultee replies · PDF28 May 2026View
LONDON UNDERGROUND INFRASTRUCTURE PROTECTIONStatutory consultee replies · PDF28 May 2026View
FIRE STATEMENTFire Statement · PDF27 May 2026View
BUILDING SAFETY REGULATORStatutory consultee replies · PDF27 May 2026View
APPLICATION FORM - WITHOUT PERSONAL DATAApplication - Form (Without Personal data) · PDF11 May 2026View
ARBORICULTURAL IMPACT ASSESSMENT ADDENDUMTree survey or Arboricultural implications · PDF11 May 2026View
COMMUNITY INFRASTRUCTURE LEVY - COMPLETED FORMCIL - GIA Form · PDF11 May 2026View
BUILDING 1, BANKSIDE YARDS WEST SECTION 73 PLANNING APPLICATION DETAILED CIRCULACircular Economy Statement · PDF11 May 2026View
BANKSIDE YARDS WEST, BUILDING 1 CONSTRUCTION LOGISTICS PLANDocument · PDF11 May 2026View
COVERING LETTERApplication - Covering letter · PDF11 May 2026View
DELIVERY AND SERVICING PLANDocument · PDF11 May 2026View
DESIGN AND ACCESS STATEMENTDesign and Access statement · PDF11 May 2026View
DESIGN AND ACCESS STATEMENTDesign and Access statement · PDF11 May 2026View
DESIGN AND ACCESS STATEMENTDesign and Access statement · PDF11 May 2026View
DESIGN AND ACCESS STATEMENTDesign and Access statement · PDF11 May 2026View
PROPOSED LEVEL 09 GENERAL ARRANGEMENT PLANPlan - Proposed · PDF11 May 2026View
PROPOSED LEVEL 10 GENERAL ARRANGEMENT PLANPlan - Proposed · PDF11 May 2026View
PROPOSED LEVEL 11 GENERAL ARRANGEMENT PLANPlan - Proposed · PDF11 May 2026View
PROPOSED LEVEL 12 GENERAL ARRANGEMENT PLANPlan - Proposed · PDF11 May 2026View
PROPOSED LEVEL 13 GENERAL ARRANGEMENT PLANPlan - Proposed · PDF11 May 2026View
PROPOSED LEVEL 14 GENERAL ARRANGEMENT PLANPlan - Proposed · PDF11 May 2026View
PROPOSED LEVEL 15 GENERAL ARRANGEMENT PLANPlan - Proposed · PDF11 May 2026View
PROPOSED LEVEL 16 GENERAL ARRANGEMENT PLANPlan - Proposed · PDF11 May 2026View
PROPOSED LEVEL 17 GENERAL ARRANGEMENT PLANPlan - Proposed · PDF11 May 2026View
PROPOSED ROOF LEVEL GENERAL ARRANGEMENT PLANPlan - Proposed · PDF11 May 2026View
PROPOSED NORTH ELEVATIONPlan - Proposed · PDF11 May 2026View
PROPOSED EAST ELEVATIONPlan - Proposed · PDF11 May 2026View
PROPOSED SOUTH ELEVATIONPlan - Proposed · PDF11 May 2026View
PROPOSED WEST ELEVATIONPlan - Proposed · PDF11 May 2026View
PROPOSED SECTION A-APlan - Proposed · PDF11 May 2026View
PROPOSED SECTION B-BPlan - Proposed · PDF11 May 2026View
WEST ELEVATION OFFICE BAYPlan - General · PDF11 May 2026View
WEST ELEVATION CORE WINGPlan - General · PDF11 May 2026View
NORTH ELEVATION BALCONYPlan - General · PDF11 May 2026View
NORTH ELEVATION BASEPlan - General · PDF11 May 2026View
EAST ELEVATION BASEPlan - General · PDF11 May 2026View
SOUTH ELEVATIONPlan - General · PDF11 May 2026View
WEST ELEVATION BASEPlan - General · PDF11 May 2026View
DRAWING LISTPlan - Drawing Register · PDF11 May 2026View
PROPOSED SITE PLANPlan - Proposed · PDF11 May 2026View
PLANNING APPLICATION BOUNDARY PLANSPlan - General · PDF11 May 2026View
PROPOSED NORTH ELEVATIONPlan - Proposed · PDF11 May 2026View
PROPOSED LEVEL 07 GENERAL ARRANGEMENT PLANPlan - Proposed · PDF11 May 2026View
PROPOSED LEVEL 08 GENERAL ARRANGEMENT PLANPlan - Proposed · PDF11 May 2026View
ENERGY STRATEGY AND SUSTAINABILITY STATEMENTEnergy statement · PDF11 May 2026View
ENVIRONMENTAL IMPACT ASSESSMENT NON-TECHNICAL SUMMARYEnvironmental statement · PDF11 May 2026View
ENVIRONMENTAL IMPACT ASSESSMENT VOLUME 1: ENVIRONMENTAL STATEMENT ADDENDUM MAINEnvironmental statement · PDF11 May 2026View
ENVIRONMENTAL IMPACT ASSESSMENT VOLUME 2: TOWNSCAPE, CONSERVATION AND VISUAL IMPEnvironmental statement · PDF11 May 2026View
ENVIRONMENTAL IMPACT ASSESSMENT VOLUME 3: ENVIRONMENTAL STATEMENT TECHNICAL APPEEnvironmental statement · PDF11 May 2026View
ENVIRONMENTAL IMPACT ASSESSMENT VOLUME 3: ENVIRONMENTAL STATEMENT TECHNICAL APPEEnvironmental statement · PDF11 May 2026View
ADDENDUM NOTE TO AKT II FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY REPORTS (JUNDrainage strategy · PDF11 May 2026View
OPERATIONAL WASTE MANAGEMENT STRATEGYDocument · PDF11 May 2026View
PLANNING STATEMENTPlanning statement · PDF11 May 2026View
BANKSIDE YARDS BUILDING 1 ? 2026 S73 ENGAGEMENT SUMMARYStatement of community involvement · PDF11 May 2026View
STATEMENT OF COMMUNITY INVOLVEMENTStatement of community involvement · PDF11 May 2026View
TRANSPORT STATEMENTTransport assessment · PDF11 May 2026View
TRAVEL PLANTravel plan · PDF11 May 2026View
WHOLE LIFE CARBON ASSESSMENTDocument · PDF11 May 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Agreed Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.