Council planning record

Partial demolition, extension and change of use of existing building for coliving use with associated internal and external amenity space (Sui Generis), with flexible commercial space (Class E), associated landscaping, access and servicing, plant and equipment and all other associated works For information: The proposed building re-uses the existing part 5/ part 6 office building (27.40m AOD) with 2no. basement levels and extends it to part 6 storey/ part 10 storeys (40.28m AOD) with 2no.basement levels. The development as a whole comprises: - 395no. coliving (Sui Generis) units, including 10% wheelchair accessible units - 1,626sqm (GIA) of shared amenity space across multiple floors - 1,928sqm (GIA) of flexible commercial floorspace at ground floor and basement level. - Provision of no.297 long-stay cycle parking spaces, including: 5% accessible (minimum of no.15 spaces), 20% standard Sheffield stands (minimum of no.60 spaces) - A BREEAM Excellent targeted development. - A car-free development - Off-street servicing to the rear of the Site for the shared living units and on-street loading to serve the commercial spaces

38-48 Southwark Bridge Road London Southwark SE1 9EJ

Under consideration/assessmentReference: 26/AP/1201London Borough of Southwark

Last published check: 28 Sept 2026, 04:07. Check the council record for more recent changes.

Application location

38-48 Southwark Bridge Road London Southwark SE1 9EJ

This record has no verified map location.

View council map

Application summary

Status
Under consideration/assessment
Application type
Major application
Received
27 Apr 2026
Validated
4 Jun 2026
Determination deadline
3 Sept 2026
Local authority
London Borough of Southwark

Application overview

Partial demolition, extension and change of use of existing building for coliving use with associated internal and external amenity space (Sui Generis), with flexible commercial space (Class E), associated landscaping, access and servicing, plant and equipment and all other associated works For information: The proposed building re-uses the existing part 5/ part 6 office building (27.40m AOD) with 2no. basement levels and extends it to part 6 storey/ part 10 storeys (40.28m AOD) with 2no.basement levels. The development as a whole comprises: - 395no. coliving (Sui Generis) units, including 10% wheelchair accessible units - 1,626sqm (GIA) of shared amenity space across multiple floors - 1,928sqm (GIA) of flexible commercial floorspace at ground floor and basement level. - Provision of no.297 long-stay cycle parking spaces, including: 5% accessible (minimum of no.15 spaces), 20% standard Sheffield stands (minimum of no.60 spaces) - A BREEAM Excellent targeted development. - A car-free development - Off-street servicing to the rear of the Site for the shared living units and on-street loading to serve the commercial spaces

Proposal details

Reference
26/AP/1201
Ward
Borough & Bankside
Agent
DP9

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 125 of 125

DocumentPublishedAction
PART L 2021 GLA CARBON EMISSION REPORTING SPREADSHEET V2.0 0Energy statement27 Aug 2026View
CYCLE PARKING AND ACCESSParking Provision · PDF19 Aug 2026View
25070-MBA-XX-ZZ-RP-EN-1700 - ENERGY STRATEGYEnergy statement · PDF12 Aug 2026View
22223-2026-027-GM(PEABODY ESTATE)Document · PDF27 Jul 2026View
38-48 SBR AND 64 SS - FTPDocument · PDF27 Jul 2026View
38-48 SBR AND 64 SS - RTPDocument · PDF27 Jul 2026View
CIVIL AVIATION AUTHORITYStatutory consultee replies · PDF14 Jul 2026View
LONDON BOROUGH OF TOWER HAMLETSComment - Consultee · PDF30 Jun 2026View
BUILDING SAFETY REGULATIONStatutory consultee replies · PDF29 Jun 2026View
NETWORK RAILStatutory consultee replies · PDF29 Jun 2026View
ENVIRONMENT AGENCYStatutory consultee replies · PDF24 Jun 2026View
TFLStatutory consultee replies · PDF23 Jun 2026View
THAMES WATERStatutory consultee replies · PDF23 Jun 2026View
SITE NOTICESite notice · PDF18 Jun 2026View
PRESS NOTICE - 18/06/2026Press Notice · PDF16 Jun 2026View
LONDON CITY AIRPORTStatutory consultee replies · PDF15 Jun 2026View
CULTURE TEAMStatutory consultee replies · PDF15 Jun 2026View
NATS SAFEGUARDINGStatutory consultee replies · PDF11 Jun 2026View
VALID APPLICATION LETTER WITH INVOICEValid Application Letter · PDF10 Jun 2026View
FILE COPY - NEIGHBOUR NOTIFICATION+LISTNeighbour Notification List · PDF10 Jun 2026View
UK POWER NETWORKSStatutory consultee replies · PDF10 Jun 2026View
AMENDMENT : APPLICATION FORM - WITHOUT PERSONAL DATAApplication - Form (Without Personal data) · PDF4 Jun 2026View
AMENDMENT : SITE LOCATION PLANSite - Location plan · PDF4 Jun 2026View
AMENDMENT : EXISTING EAST ELEVATION - SOUTHWARK BRIDGE ROADPlan - Existing · PDF4 Jun 2026View
STRUCTURAL SURVEYStructural survey · PDF28 May 2026View
FINANCIAL VIABILITY STATEMENTViability report · PDF20 May 2026View
PLANNING STATEMENTPlanning statement · PDF20 May 2026View
DAYLIGHT AND SUNLIGHT REPORT: IMPACTS UPON NEIGHBOURSDocument · PDF6 May 2026View
DESIGN AND ACCESS STATEMENT INC. LANDSCAPEDocument · PDF6 May 2026View
INTERNAL DAYLIGHT AND SUNLIGHT REPORTDocument · PDF6 May 2026View
PHASE 1 LAND CONTAMINATION REPORTGround investigation report · PDF6 May 2026View
SOUTHWARK OFFICE MARKET ? TRENDS, DATA & ANALYSISDocument · PDF27 Apr 2026View
SITE PLANSite - Block plan · PDF27 Apr 2026View
EXISTING PLAN LEVEL 02Plan - Existing · PDF27 Apr 2026View
EXISTING PLAN LEVEL 03Plan - Existing · PDF27 Apr 2026View
EXISTING PLAN LEVEL 04Plan - Existing · PDF27 Apr 2026View
EXISTING PLAN LEVEL 05Plan - Existing · PDF27 Apr 2026View
EXISTING PLAN LEVEL R1Plan - Existing · PDF27 Apr 2026View
EXISTING PLAN LEVEL B1Plan - Existing · PDF27 Apr 2026View
EXISTING PLAN LEVEL B2Plan - Existing · PDF27 Apr 2026View
EXISTING PLAN LEVEL 00Plan - Existing · PDF27 Apr 2026View
EXISTING PLAN LEVEL 01Plan - Existing · PDF27 Apr 2026View
PROPOSED PLAN LEVEL 07Plan - Proposed · PDF27 Apr 2026View
PROPOSED PLAN LEVEL 08Plan - Proposed · PDF27 Apr 2026View
PROPOSED PLAN LEVEL 09Plan - Proposed · PDF27 Apr 2026View
PROPOSED PLAN LEVEL 10Plan - Proposed · PDF27 Apr 2026View
PROPOSED PLAN LEVEL B1Plan - Proposed · PDF27 Apr 2026View
PROPOSED PLAN LEVEL B2Plan - Proposed · PDF27 Apr 2026View
PROPOSED PLAN LEVEL R1Plan - Proposed · PDF27 Apr 2026View
PROPOSED PLAN LEVEL 00Plan - Proposed · PDF27 Apr 2026View
PROPOSED PLAN LEVEL 01Plan - Proposed · PDF27 Apr 2026View
PROPOSED PLAN LEVEL 05Plan - Proposed · PDF27 Apr 2026View
PROPOSED PLAN LEVEL 06Plan - Proposed · PDF27 Apr 2026View
PROPOSED PLAN LEVEL 02-04Plan - Proposed · PDF27 Apr 2026View
PROPOSED CYCLE STORES ARRANGEMENTS 02Plan - Proposed · PDF27 Apr 2026View
PROPOSED TYPICAL CO-LIVING ROOMSPlan - Proposed · PDF27 Apr 2026View
PROPOSED TYPICAL ACCESSIBLE CO-LIVING ROOMSPlan - Proposed · PDF27 Apr 2026View
PROPOSED CYCLE STORES ARRANGEMENTS 01Plan - Proposed · PDF27 Apr 2026View
COVERING LETTERApplication - Covering letter · PDF27 Apr 2026View
COMMUNITY INFRASTRUCTURE LEVY - COMPLETED FORMCIL - GIA Form · PDF27 Apr 2026View
EXISTING SOUTH ELEVATION - SOUTHWARK STREETPlan - Existing · PDF27 Apr 2026View
EXISTING WEST ELEVATION - PEABODY ESTATEPlan - Existing · PDF27 Apr 2026View
EXISTING NORTH ELEVATION - PEABODY ESTATEPlan - Existing · PDF27 Apr 2026View
PROPOSED SOUTH ELEVATION -SOUTHWARK STREETPlan - Proposed · PDF27 Apr 2026View
PROPOSED EAST ELEVATION -SOUTHWARK BRIDGE ROADPlan - Proposed · PDF27 Apr 2026View
PROPOSED WEST ELEVATION -PEABODY ESTATEPlan - Proposed · PDF27 Apr 2026View
PROPOSED NORTH ELEVATION - PEABODY ESTATEPlan - Proposed · PDF27 Apr 2026View
PROPOSED ELEVATION BAY STUDIES TYPE A AND BPlan - Proposed · PDF27 Apr 2026View
PROPOSED ELEVATION BAY STUDIES TYPE C AND DPlan - Proposed · PDF27 Apr 2026View
EXISTING SECTION AAPlan - Existing · PDF27 Apr 2026View
EXISTING SECTION BBPlan - Existing · PDF27 Apr 2026View
PROPOSED SECTION AA, BB, CCPlan - Proposed · PDF27 Apr 2026View
PROPOSED SECTION DDPlan - Proposed · PDF27 Apr 2026View
DEMOLITION PLAN LEVEL 02Plan - General · PDF27 Apr 2026View
DEMOLITION PLAN LEVEL 03Plan - General · PDF27 Apr 2026View
DEMOLITION PLAN LEVEL 04Plan - General · PDF27 Apr 2026View
DEMOLITION PLAN LEVEL 05Plan - General · PDF27 Apr 2026View
DEMOLITION PLAN LEVEL R1Plan - General · PDF27 Apr 2026View
DEMOLITION PLAN LEVEL B1Plan - General · PDF27 Apr 2026View
DEMOLITION PLAN LEVEL B2Plan - General · PDF27 Apr 2026View
DEMOLITION PLAN LEVEL 00Plan - General · PDF27 Apr 2026View
DEMOLITION PLAN LEVEL 01Plan - General · PDF27 Apr 2026View
PROPOSED ELEVATION BAY STUDY CLASS E ENTRANCEPlan - Proposed · PDF27 Apr 2026View
LANDSCAPE GENERAL ARRANGEMENT PLAN - LEVEL 07Plan - General · PDF27 Apr 2026View
LANDSCAPE GENERAL ARRANGEMENT PLAN - LEVEL 08Plan - General · PDF27 Apr 2026View
LANDSCAPE GENERAL ARRANGEMENT PLAN - LEVEL 10Plan - General · PDF27 Apr 2026View
LANDSCAPE GENERAL ARRANGEMENT PLAN - LEVEL 11Plan - General · PDF27 Apr 2026View
LANDSCAPE GENERAL ARRANGEMENT PLAN - LEVEL 00Plan - General · PDF27 Apr 2026View
LANDSCAPE GENERAL ARRANGEMENT PLAN - LEVEL 01Plan - General · PDF27 Apr 2026View
LANDSCAPE GENERAL ARRANGEMENT PLAN - LEVEL 05Plan - General · PDF27 Apr 2026View
LANDSCAPE GENERAL ARRANGEMENT PLAN - LEVEL 06Plan - General · PDF27 Apr 2026View
FIRE STATEMENTFire Statement · PDF27 Apr 2026View
GATEWAY ONE FIRE STATEMENTFire Statement · PDF27 Apr 2026View
TRAVEL PLAN - COMMERCIALDocument · PDF27 Apr 2026View
TRAVEL PLAN - RESIDENTIAL (SHARED LIVING)Document · PDF27 Apr 2026View
TRANSPORT ASSESSMENTTransport assessment · PDF27 Apr 2026View
DELIVERY, SERVICING AND WASTE MANAGEMENT PLANDocument · PDF27 Apr 2026View
AIR QUALITY ASSESSMENTAir quality assessment · PDF27 Apr 2026View
OUTLINE CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANDocument · PDF27 Apr 2026View
HEALTH IMPACT ASSESSMENTDocument · PDF27 Apr 2026View
EQUALITY IMPACT ASSESSMENTDocument · PDF27 Apr 2026View
NOISE IMPACT ASSESSMENTNoise impact assessment · PDF27 Apr 2026View
ARBORICULTURAL ENVIRONMENT STATEMENTDocument · PDF27 Apr 2026View
ECOLOGICAL APPRAISALDocument · PDF27 Apr 2026View
ARCHAEOLOGICAL DESK BASED ASSESSMENTDocument · PDF27 Apr 2026View
ENERGY ASSESSMENTDocument · PDF27 Apr 2026View
SUSTAINABILITY STATEMENTDocument · PDF27 Apr 2026View
UTILITY SERVICES SUMMARYDocument · PDF27 Apr 2026View
FLOOD RISK ASSESSMENT 1 OF 2Document · PDF27 Apr 2026View
FLOOD RISK ASSESSMENT 2 OF 2Document · PDF27 Apr 2026View
EQUALITY IMPACT AND NEEDS ANALYSISDocument · PDF27 Apr 2026View
ENGAGEMENT SUMMARYDocument · PDF27 Apr 2026View
STATEMENT OF COMMUNITY INVOLVEMENTDocument · PDF27 Apr 2026View
COLIVING MANAGEMENT PLANDocument · PDF27 Apr 2026View
HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENTDocument · PDF27 Apr 2026View
3436 - 42 SOUTHWARK BRIDGE RD - FRA AND SUDS - PART-1Flood risk assessment · PDF26 Mar 2026View
3436 - 42 SOUTHWARK BRIDGE RD - FRA AND SUDS - PART-2Flood risk assessment · PDF26 Mar 2026View
3436 - 42 SOUTHWARK BRIDGE RD - FRA AND SUDS - PART-3Flood risk assessment · PDF26 Mar 2026View
3436 - 42 SOUTHWARK BRIDGE RD - FRA AND SUDS - PART-4Flood risk assessment · PDF26 Mar 2026View
3436 - 42 SOUTHWARK BRIDGE RD - FRA AND SUDS - PART-5Flood risk assessment · PDF26 Mar 2026View
3436 - 42 SOUTHWARK BRIDGE RD - FRA AND SUDS - PART-1Flood risk assessment · PDF26 Mar 2026View
3436 - 42 SOUTHWARK BRIDGE RD - FRA AND SUDS - PART-2Flood risk assessment · PDF26 Mar 2026View
3436 - 42 SOUTHWARK BRIDGE RD - FRA AND SUDS - PART-3Flood risk assessment · PDF26 Mar 2026View
3436 - 42 SOUTHWARK BRIDGE RD - FRA AND SUDS - PART-4Flood risk assessment · PDF26 Mar 2026View
3436 - 42 SOUTHWARK BRIDGE RD - FRA AND SUDS - PART-5Flood risk assessment · PDF26 Mar 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.