Removal of the existing combustible rainscreen system and replacement with a new external wall insulated system. Removal of the existing combustible timber cladding rainscreen system and replacement with a ventilated rainscreen system comprising colour coated cellulose fibre - cement plank or similar. Replacement of the existing phenolic insulation in the wall build-ups of the terrace extension and private balcony enclosures with a non-combustible mineral wool insulation. Installation of cavity barriers around all openings and compartment areas. Installation of cavity closers around all penetrations. Replacement of existing balcony & terrace floor decking. Replacement of the existing combustible soffits to all balconies and first floor overhang. Replacement of existing window cills and copings.
Ink Works Court 3 Bell Yard Mews London Southwark SE1 3UX
Removal of the existing combustible rainscreen system and replacement with a new external wall insulated system. Removal of the existing combustible timber cladding rainscreen system and replacement with a ventilated rainscreen system comprising colour coated cellulose fibre - cement plank or similar. Replacement of the existing phenolic insulation in the wall build-ups of the terrace extension and private balcony enclosures with a non-combustible mineral wool insulation. Installation of cavity barriers around all openings and compartment areas. Installation of cavity closers around all penetrations. Replacement of existing balcony & terrace floor decking. Replacement of the existing combustible soffits to all balconies and first floor overhang. Replacement of existing window cills and copings.
Reference
26/AP/0699
Ward
London Bridge & West Bermondsey
Agent
TEO architects
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.