Council planning record

Full planning permission for: replacement of gas-fired boilers with air source heat pumps to provide heating and hot water; installation of a rooftop air source heat pump acoustic compound; installation of solar PV panels; recovering of existing flat roof sections (excluding pool hall roof); and internal first floor modifications to provide access into the rooftop air source heat pump acoustic compound via a new door.

Teddington Swimming Pool, Vicarage Road, Teddington, TW11 8EZ

The case officer will be assessing the entire case in detail as well as reviewing any comments submitted.Reference: PA26/3033London Borough of Richmond upon Thames

Last published check: 21 Sept 2026, 19:32. Check the council record for more recent changes.

Application location

Teddington Swimming Pool, Vicarage Road, Teddington, TW11 8EZ

This record has no verified map location.

Application summary

Status
The case officer will be assessing the entire case in detail as well as reviewing any comments submitted.
Application type
Full Application
Received
1 Sept 2026
Validated
2 Sept 2026
Determination deadline
28 Oct 2026
Local authority
London Borough of Richmond upon Thames

Application overview

Full planning permission for: replacement of gas-fired boilers with air source heat pumps to provide heating and hot water; installation of a rooftop air source heat pump acoustic compound; installation of solar PV panels; recovering of existing flat roof sections (excluding pool hall roof); and internal first floor modifications to provide access into the rooftop air source heat pump acoustic compound via a new door.

Proposal details

Reference
PA26/3033
Alternative references
PP-15189742
Ward
Teddington Ward [TDD]
Agent
Hodkin
UPRN
100023396308

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 29 of 29

DocumentPublishedAction
Application Form - Without Personal DataApplication Form - Redacted1 Sept 2026View
Location PlanSubmitted Drawing1 Sept 2026View
Desktop Phase 1 Contaminated Land ReportReport1 Sept 2026View
Preliminary Ecological Appraisal and Roost AssessmentReport1 Sept 2026View
Aviation Glint and Glare AssessmentReport1 Sept 2026View
Fire Strategy ReportReport1 Sept 2026View
Topographic & Utility Survey (1 of 2) DS-TP13112-01Submitted Drawing1 Sept 2026View
Community Infrastructure Levy - Completed formCommunity Infrastructure Levy Form1 Sept 2026View
Site Plan 04Submitted Drawing1 Sept 2026View
Design and Access StatementReport1 Sept 2026View
LAYOUT INDICATIVE ONLYSubmitted Drawing1 Sept 2026View
Existing Elevations 1 & 2 28846.108Submitted Drawing1 Sept 2026View
Existing Elevations 5 - 7 28846.110Submitted Drawing1 Sept 2026View
Existing Elevations 3& 4 28846.109Submitted Drawing1 Sept 2026View
Existing Roof Plan 28846.100Submitted Drawing1 Sept 2026View
Existing Floor Plans 28846.105Submitted Drawing1 Sept 2026View
Noise impact assessmentReport1 Sept 2026View
Elevations To Proposed Raised Area 28846.119Submitted Drawing1 Sept 2026View
Proposed Roof Door Details 28846.119Submitted Drawing1 Sept 2026View
Roof Sections to Proposed Raised Areas 28846.118Submitted Drawing1 Sept 2026View
Proposed Elevations 5 - 7 28846.113Submitted Drawing1 Sept 2026View
Proposed Elevations 3 & 4 28846.112Submitted Drawing1 Sept 2026View
Proposed Elevations 1 & 2 28846.111Submitted Drawing1 Sept 2026View
Proposed Floor Plans 28846.107Submitted Drawing1 Sept 2026View
Proposed Roof Acoustic Enclosure and PV Array Plan 28846.104Submitted Drawing1 Sept 2026View
Demolition Floor Plans 28846.106Submitted Drawing1 Sept 2026View
Proposed Roof Covering Plan 28846.102Submitted Drawing1 Sept 2026View
Roof Demolition Plan 28846.101Submitted Drawing1 Sept 2026View
Open space assessmentReport2 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Decision due date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

The case officer will be assessing the entire case in detail as well as reviewing any comments submitted.
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.