Council planning record

Replacement rear extension, addition of a side dormer, widening of the front and rear dormers, alterations to the window glazing, to increase the height of the coach house extension and internal alterations to layout and features at the lower ground, upper ground, first and second floors.

109, Castelnau, London, SW13 9EL

The case officer will be assessing the entire case in detail as well as reviewing any comments submitted.Reference: PA26/2752London Borough of Richmond upon Thames

Last published check: 28 Sept 2026, 19:26. Check the council record for more recent changes.

Application location

109, Castelnau, London, SW13 9EL

This record has no verified map location.

Application summary

Status
The case officer will be assessing the entire case in detail as well as reviewing any comments submitted.
Application type
Listed Building Consent
Received
7 Aug 2026
Validated
11 Aug 2026
Determination deadline
2 Oct 2026
Local authority
London Borough of Richmond upon Thames

Application overview

Replacement rear extension, addition of a side dormer, widening of the front and rear dormers, alterations to the window glazing, to increase the height of the coach house extension and internal alterations to layout and features at the lower ground, upper ground, first and second floors.

Proposal details

Reference
PA26/2752
Alternative references
PP-15084449_C
Ward
Barnes Ward [BRN]
Agent
Dyne
UPRN
100022290586

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 64 of 64

DocumentPublishedAction
Application Form - Without Personal DataApplication Form - Redacted7 Aug 2026View
Noise impact assessmentReport7 Aug 2026View
London Plan Fire StatementReport7 Aug 2026View
Flood Risk AssessmentReport7 Aug 2026View
Landscape PlanSubmitted Drawing7 Aug 2026View
Lower Ground & Ground Floor Proposed PlansSubmitted Drawing7 Aug 2026View
Second Floor & Coach House Roof Proposed PlansSubmitted Drawing7 Aug 2026View
Roof Proposed PlanSubmitted Drawing7 Aug 2026View
Rear Extension Section & DetailsSubmitted Drawing7 Aug 2026View
Biodiversity Net Gain statementReport7 Aug 2026View
CIL FORMCommunity Infrastructure Levy Form7 Aug 2026View
Design and access statementReport7 Aug 2026View
METHOD STATEMENTReport7 Aug 2026View
SCHEDULE OF WORKSReport7 Aug 2026View
Demolition Lower Ground Floor PlanSubmitted Drawing7 Aug 2026View
Demolition Upper Ground Floor PlanSubmitted Drawing7 Aug 2026View
Demolition First Floor PlanSubmitted Drawing7 Aug 2026View
Demolition Second Floor PlanSubmitted Drawing7 Aug 2026View
Demolition Elevations 1 2Submitted Drawing7 Aug 2026View
Demolition Elevations 3 4Submitted Drawing7 Aug 2026View
Existing Lower & Upper Ground Floor PlanSubmitted Drawing7 Aug 2026View
Existing First & Second Floor PlanSubmitted Drawing7 Aug 2026View
Existing Roof PlanSubmitted Drawing7 Aug 2026View
Existing Site PlanSubmitted Drawing7 Aug 2026View
Existing Lower Ground Floor Reflective Ceiling PlanSubmitted Drawing7 Aug 2026View
Exisitng Upper Ground Floor Reflective Ceiling PlanSubmitted Drawing7 Aug 2026View
Existing First Floor Reflective Ceiling PlanSubmitted Drawing7 Aug 2026View
Existing Second Floor Reflective Ceiling PlanSubmitted Drawing7 Aug 2026View
Existing Elevations 1 2Submitted Drawing7 Aug 2026View
Existing Elevations 3Submitted Drawing7 Aug 2026View
Existing Elevations 4Submitted Drawing7 Aug 2026View
Existing Section AASubmitted Drawing7 Aug 2026View
The location planSubmitted Drawing7 Aug 2026View
Proposed Site PlanSubmitted Drawing7 Aug 2026View
Proposed Lower & Upper Ground FloorSubmitted Drawing7 Aug 2026View
Proposed First & Second Floor PlanSubmitted Drawing7 Aug 2026View
Proposed Roof PlanSubmitted Drawing7 Aug 2026View
Proposed Lower Ground Floor Reflective Ceiling PlanSubmitted Drawing7 Aug 2026View
Proposed Upper Ground Floor Reflective Ceiling PlanSubmitted Drawing7 Aug 2026View
Proposed First Floor Reflective Ceiling PlanSubmitted Drawing7 Aug 2026View
Proposed Second Floor Reflective Ceiling PlanSubmitted Drawing7 Aug 2026View
Proposed Electrical Lower Ground Floor PlanSubmitted Drawing7 Aug 2026View
Proposed Electrical Upper Ground Floor PlanSubmitted Drawing7 Aug 2026View
Proposed Electrical First Floor PlanSubmitted Drawing7 Aug 2026View
Proposed Electrical Second Floor PlanSubmitted Drawing7 Aug 2026View
Proposed Elevations 1 2Submitted Drawing7 Aug 2026View
Proposed Elevations 3 4Submitted Drawing7 Aug 2026View
Proposed Section AASubmitted Drawing7 Aug 2026View
Proposed Coach House Floor DetailSubmitted Drawing7 Aug 2026View
Proposed Attic Floor DetailSubmitted Drawing7 Aug 2026View
Proposed Attic Roof DetailSubmitted Drawing7 Aug 2026View
Proposed Dormer DetailSubmitted Drawing7 Aug 2026View
Proposed Flat Skylight DetailSubmitted Drawing7 Aug 2026View
Proposed Window Joinery Detail Sash ASubmitted Drawing7 Aug 2026View
Proposed Window Joinery Detail Sash BSubmitted Drawing7 Aug 2026View
Proposed Window Joinery Detail Sash CSubmitted Drawing7 Aug 2026View
Proposed Gym DoorSubmitted Drawing7 Aug 2026View
Proposed Door DGL2-4Submitted Drawing7 Aug 2026View
Proposed Bin AC EnclousersSubmitted Drawing7 Aug 2026View
Proposed Vestibule ScreenSubmitted Drawing7 Aug 2026View
Proposed Vestibule Pantry DoorSubmitted Drawing7 Aug 2026View
Proposed Lower Entrance Hall Internal WindowSubmitted Drawing7 Aug 2026View
Proposed Drawing Room DoorsSubmitted Drawing7 Aug 2026View
Heritage Impact AssessmentReport7 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

The case officer will be assessing the entire case in detail as well as reviewing any comments submitted.
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.