Change of use on the First and Second Floors from Class E Use (Offices) to Class C3 (Residential), creating a two-bedroom, three person flat. The Ground Floor would be retained as Class E Use (Offices).
79A, High Street, Teddington, TW11 8HG
The decision has been made on the application.Reference: PA26/2722London Borough of Richmond upon Thames
Last published check: 3 Oct 2026, 05:54. Check the council record for more recent changes.
Application location
79A, High Street, Teddington, TW11 8HG
This record has no verified map location.
Application summary
Status
The decision has been made on the application.
Application type
GPD P3G - E Bet Loan to Mixed + 2 Flats
Received
5 Aug 2026
Validated
5 Aug 2026
Determination deadline
30 Sept 2026
Local authority
London Borough of Richmond upon Thames
Application overview
Change of use on the First and Second Floors from Class E Use (Offices) to Class C3 (Residential), creating a two-bedroom, three person flat. The Ground Floor would be retained as Class E Use (Offices).
Proposal details
Reference
PA26/2722
Alternative references
PP-14951333
Ward
Teddington Ward [TDD]
Agent
Nixon
UPRN
10094588413
Sign in to view all collected council fields and recorded changes.
Development under Schedule 2, Part 2 Class G is permitted subject to the condition that: (a) some or all of the parts of the building used for a use within, as the case may be, article 3(6)(n) (betting office) or 3(6)(o) (pay day loan shop) of, or Class E of Schedule 2 to, the Use Classes Order is situated on a floor below the lowest part of the building used as a flat; (b ) where the development consists of a change of use of any building with a display window at ground floor level, the ground floor must not be used in whole or in part as a flat; (c) a flat must not be used otherwise than as a dwelling (whether or not as a sole or main residence)— (i) by a single person or by people living together as a family, or (ii) by not more than 6 residents living together as a single household (including a household where care is provided for residents)
The sound insulation measures detailed within the submitted Acoustic Assessment (July 2026) shall be implemented in full prior to first occupation of the residential unit and retained thereafter. Prior to first occupation, a post-completion acoustic compliance report prepared by a suitably qualified acoustic consultant shall be submitted to and approved in writing by the Local Planning Authority demonstrating that the separating floor construction achieves the airborne sound insulation standard applicable to a material change of use under Approved Document E of the Building Regulations, namely a minimum performance of DnT,w + Ctr $4 43 dB, or any subsequent equivalent standard. REASON: To safeguard the amenity of future residential occupants.
For the avoidance of doubt the Drawing(s) No(s) to which this decision refers are as follows:- HST79A-01, HST79A-02, HST79A-04 & HST79A-08 received on 05 Aug 2026.
If you wish to name or number a new development, sub-divide an existing property, or change the name or number(s) of an existing property or development, you will need to apply to the London Borough of Richmond Upon Thames. Further details of this process, fees, and the necessary information and forms that need to be submitted can be found on the Council's website http://www.richmond.gov.uk/street_numbering_and_naming.
The applicant is advised that this permission may result in a chargeable scheme under the Borough's and the Mayor of London's Community Infrastructure Levy.
The applicant is advised that no internal or external alterations to the building can be undertaken without express Listed Building Consent.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.