Council planning record

Details pursuant to conditions C3 - External Materials, C4 - Fenestration, C5 - Railings, C6 - Method Statement; C7 - Floor Finishes, C8 - Schedule of Repairs & C10 - Internal Doors of varied Listed Building Consent reference PA26/0875.

59, Petersham Road, Richmond, TW10 6UT

The case officer will be assessing the entire case in detail as well as reviewing any comments submitted.Reference: PA26/2690London Borough of Richmond upon Thames

Last published check: 27 Sept 2026, 18:56. Check the council record for more recent changes.

Application location

59, Petersham Road, Richmond, TW10 6UT

This record has no verified map location.

Application summary

Status
The case officer will be assessing the entire case in detail as well as reviewing any comments submitted.
Application type
Condition Approval
Received
3 Aug 2026
Validated
28 Aug 2026
Determination deadline
20 Oct 2026
Local authority
London Borough of Richmond upon Thames

Application overview

Details pursuant to conditions C3 - External Materials, C4 - Fenestration, C5 - Railings, C6 - Method Statement; C7 - Floor Finishes, C8 - Schedule of Repairs & C10 - Internal Doors of varied Listed Building Consent reference PA26/0875.

Proposal details

Reference
PA26/2690
Alternative references
PP-15128284
Ward
Ham, Petersham & Richmond Riverside Ward [HMP]
Agent
Hagerty
UPRN
100022313720

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 37 of 37

DocumentPublishedAction
Superseded Application Form - Without Personal DataApplication Form - Redacted1 Aug 2026View
Superseded Fenestration Covering letterCovering letter1 Aug 2026View
Superseded Proposed Garden Level WindowsSubmitted Drawing1 Aug 2026View
Superseded Internal Doors Covering letterCovering letter1 Aug 2026View
Superseded Proposed Internal DoorsSubmitted Drawing1 Aug 2026View
Superseded Proposed Floor FinishesSubmitted Drawing1 Aug 2026View
Superseded Floor Finishes Covering LetterCovering letter1 Aug 2026View
Superseded Proposed MaterialsSubmitted Drawing1 Aug 2026View
Superseded External Materials Covering LetterCovering letter1 Aug 2026View
Superseded Method Statement for protection of the internal fabricReport1 Aug 2026View
Superseded Method Statement Demoltion of Front StepsReport1 Aug 2026View
Superseded Method Statements Covering letterCovering letter1 Aug 2026View
Superseded Method Statement for Protection of the historic rear elevationReport1 Aug 2026View
Superseded Proposed Railings to PodSubmitted Drawing1 Aug 2026View
Superseded Railings Cover LetterCovering letter1 Aug 2026View
Superseded Replacement of External Timber Window Sills Method StatementReport1 Aug 2026View
Superseded Cast Iron Downpipe Method StatementReport1 Aug 2026View
Superseded Method Statement for Repairing Existing Timber PanellingReport1 Aug 2026View
Superseded Schedule of Repairs Covering letterCovering letter1 Aug 2026View
Application FormApplication Form25 Aug 2026View
CONDITION C10 Internal DoorsCovering letter25 Aug 2026View
CONDITION C8 Schedule of RepairsCovering letter25 Aug 2026View
CONDITION C7 Internal Floor FinishesCovering letter25 Aug 2026View
CONDITION C6 Method StatementCovering letter25 Aug 2026View
CONDITION C4 FenestrationCovering letter25 Aug 2026View
CONDITION C3 External MaterialsCovering letter25 Aug 2026View
Method Statement Demolition of Front StepsReport25 Aug 2026View
Method Statement for Restoring and Repairing Existing Timber PanellingReport25 Aug 2026View
Preservation of Existing Internal Fabric Method StatementReport25 Aug 2026View
Preservation of the Existing External Fabric Method StatementReport25 Aug 2026View
Method Statement Cast Iron Downpipe ReplacementsReport25 Aug 2026View
Proposed Window Details (22.15.JAN25.WINDOWS.01)Submitted Drawing25 Aug 2026View
Proposed Pod Railings (22.15.JAN25.RAILINGS)Submitted Drawing25 Aug 2026View
Proposed Materials (22.15.JAN25.MATERIALS.01)Submitted Drawing25 Aug 2026View
Proposed Internal Doors (22.15.JAN25.INTDOORS.01 Rev 02)Submitted Drawing25 Aug 2026View
Proposed Floor Finishes All Floors (22.15.JAN25.FLOOR.01)Submitted Drawing25 Aug 2026View
Proposed Balcony Repairs and Glazing Replacement Details (22.15.BALCONY Rev 01)Submitted Drawing25 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Decision due date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

The case officer will be assessing the entire case in detail as well as reviewing any comments submitted.
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.