Installation of two air source heat pump condenser units at roof level together with associated steel support frame, timber screening and ancillary works.
1A, Essex Lodge, Barnes High Street, London, SW13 9LB
The decision has been made on the application.Reference: PA26/2639London Borough of Richmond upon Thames
Last published check: 2 Oct 2026, 22:32. Check the council record for more recent changes.
Application location
1A, Essex Lodge, Barnes High Street, London, SW13 9LB
This record has no verified map location.
Application summary
Status
The decision has been made on the application.
Application type
Full Application
Received
29 Jul 2026
Validated
10 Aug 2026
Determination deadline
28 Sept 2026
Local authority
London Borough of Richmond upon Thames
Application overview
Installation of two air source heat pump condenser units at roof level together with associated steel support frame, timber screening and ancillary works.
Proposal details
Reference
PA26/2639
Alternative references
PP-15110460
Ward
Mortlake & Barnes Common Ward [MRB]
Agent
Magnien
UPRN
200002811175
Sign in to view all collected council fields and recorded changes.
Heritage Statement is required for properties where the proposal affects designated and/or non-designated heritage assets or their setting (Listed Buildings, Buildings of Townscape Merit, fall within a conservation area or have an Article 4 direction attached to it) http://www.richmond.gov.uk/make_a_planning_application (Step 3) http://www.richmond.gov.uk/media/13312/heritage_statements.pdf
Fire Safety Strategy required The London Plan 2021 - Policy D12 (A) and D5 and https://www.london.gov.uk/sites/default/files/draft_guidance_sheet_d5_b5_evacuation_lifts_070720_web.pdf (london.gov.uk) London Plan policy D12 requires the submission of a Fire Safety Strategy on all planning applications. The Fire Safety Strategy should be presented as a standalone document with a clear structure that addresses the criteria set out in London Plan Policy D12 part A. The submitted drawings should address the requirements set out at paragraphs 3.12.3 and 3.12.4 of the London Plan. Where the applicant considers parts of or the whole policy do not apply, this should be justified in a Reasonable Exception Statement (RES). Draft guidance on Fire Safety Strategies is available at: https://www.london.gov.uk/what-we-do/planning/implementing-london-plan/london-plan-guidance/fire-safety-guidance-pre-consultation-information Where the proposal includes a lift, the applicant should address the requirements of London Plan policy D5 within their Fire Safety Statement.
brocure appears to be for a AC unit and not ASHP - please confirm, submission of a noise report required
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission. REASON: To conform with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004.
The development hereby permitted shall be carried out in accordance with the following approved plans, where applicable. Drawing No. 01-000; 01-001; 02-001; 01-002; 02-002; 02-003 and Location Plan received the 29th July 2026. REASON: To accord with the terms of the application, for the avoidance of doubt and in the interests of proper planning.
The development must be carried out in accordance with the provisions of the Fire Safety Statement / Reasonable Exception Statement received 7th August 2026 unless otherwise approved in writing by the Local Planning Authority. REASON: To ensure that the development incorporates the necessary fire safety measures in accordance with the Mayor's London Plan Policy D12.
The plant hereby approved shall be installed, operated and maintained in accordance with the manufacturer's recommendations and the Noise Impact Assessment prepared by Sound Licensing Ltd, dated 17 September 2026, Ref: 1A ESSEX LODGE, SW13.NIA, including the noise mitigation measures specified within the assessment. REASON: To protect the amenity of occupiers of nearby properties.
Approval of a Biodiversity Gain Plan will not be required before development commences Biodiversity Net Gain The effect of paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 is that planning permission granted for development of land in England is deemed to have been granted subject to the condition ('biodiversity gain condition') that development may not begin unless: (a) a Biodiversity Gain Plan has been submitted to the planning authority, and (b) the planning authority has approved the plan. The planning authority, for the purposes of determining whether to approve a Biodiversity Gain Plan, if one is required in respect of this permission would be the London Borough of Richmond upon Thames. There are statutory exemptions and transitional arrangements which mean that the biodiversity gain condition does not always apply. These are listed below. Based on the information available this permission is considered to be one which will not require the approval of a biodiversity gain plan before development is begun because one or more of the statutory exemptions or transitional arrangements in the list below is/are considered to apply. Statutory exemptions and transitional arrangements in respect of the biodiversity gain condition. 1. The application for planning permission was made before 12 February 2024. 2. The planning permission relates to development to which section 73A of the Town and Country Planning Act 1990 (planning permission for development already carried out) applies. 3. The planning permission was granted on an application made under section 73 of the Town and Country Planning Act 1990 and (i) the original planning permission to which the section 73 planning permission relates* was granted before 12 February 2024; or (ii) the application for the original planning permission* to which the section 73 planning permission relates was made before 12 February 2024. 4. The permission which has been granted is for development which is exempt being: 4.1 Development which is not 'major development' (within the meaning of article 2(1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015) where: (i) the application for planning permission was made before 2 April 2024; (ii) planning permission is granted which has effect before 2 April 2024; or (iii) planning permission is granted on an application made under section 73 of the Town and Country Planning Act 1990 where the original permission to which the section 73 permission relates* was exempt by virtue of (i) or (ii). 4.2 Development below the de minimis threshold, meaning development which: (i) does not impact an onsite priority habitat (a habitat specified in a list published under section 41 of the Natural Environment and Rural Communities Act 2006); and (ii) impacts less than 25 square metres of onsite habitat that has biodiversity value greater than zero and less than 5 metres in length of onsite linear habitat (as defined in the statutory metric). 4.3 Development which is subject of a householder application within the meaning of article 2(1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015. A 'householder application' means an application for planning permission for development for an existing dwellinghouse, or development within the curtilage of such a dwellinghouse for any purpose incidental to the enjoyment of the dwellinghouse which is not an application for change of use or an application to change the number of dwellings in a building. 4.4 Development of a biodiversity gain site, meaning development which is undertaken solely or mainly for the purpose of fulfilling, in whole or in part, the Biodiversity Gain Planning condition which applies in relation to another development, (no account is to be taken of any facility for the public to access or to use the site for educational or recreational purposes, if that access or use is permitted without the payment of a fee). 4.5 Self and Custom Build Development, meaning development which: (i) consists of no more than 9 dwellings; (ii) is carried out on a site which has an area no larger than 0.5 hectares; and (iii) consists exclusively of dwellings which are self-build or custom housebuilding (as defined in section 1(A1) of the Self-build and Custom Housebuilding Act 2015). 4.6 Development forming part of, or ancillary to, the high speed railway transport network (High Speed 2) comprising connections between all or any of the places or parts of the transport network specified in section 1(2) of the High Speed Rail (Preparation) Act 2013. * 'original planning permission means the permission to which the section 73 planning permission relates' means a planning permission which is the first in a sequence of two or more planning permissions, where the second and any subsequent planning permissions are section 73 planning permissions. Irreplaceable habitat If the onsite habitat includes irreplaceable habitat (within the meaning of the Biodiversity Gain Requirements (Irreplaceable Habitat) Regulations 2024) there are additional requirements for the content and approval of Biodiversity Gain Plans. The Biodiversity Gain Plan must include, in addition to information about steps taken or to be taken to minimise any adverse effect of the development on the habitat, information on arrangements for compensation for any impact the development has on the biodiversity of the irreplaceable habitat. The planning authority can only approve a Biodiversity Gain Plan if satisfied that the adverse effect of the development on the biodiversity of the irreplaceable habitat is minimised and appropriate arrangements have been made for the purpose of compensating for any impact which do not include the use of biodiversity credits. The effect of section 73D of the Town and Country Planning Act 1990 If planning permission is granted on an application made under section 73 of the Town and Country Planning Act 1990 (application to develop land without compliance with conditions previously attached) and a Biodiversity Gain Plan was approved in relation to the previous planning permission ('the earlier Biodiversity Gain Plan') there are circumstances when the earlier Biodiversity Gain Plan is regarded as approved for the purpose of discharging the biodiversity gain condition subject to which the section 73 planning permission is granted. Those circumstances are that the conditions subject to which the section 73 permission is granted: (i) do not affect the post-development value of the onsite habitat as specified in the earlier Biodiversity Gain Plan, and (ii) in the case of planning permission for a development where all or any part of the onsite habitat is irreplaceable habitat the conditions do not change the effect of the development on the biodiversity of that onsite habitat (including any arrangements made to compensate for any such effect) as specified in the earlier Biodiversity Gain Plan.
In accordance with section DM3 of the National Planning Policy Framework, Richmond upon Thames Borough Council takes a positive and proactive approach to the delivery of sustainable development, by: * Providing a formal pre-application service * Providing written policies and guidance, all of which is available to view on the Council's website * Where appropriate, negotiating amendments to secure a positive decision * Determining applications in a timely manner. In this instance: * The application was acceptable as submitted, and approved without delay
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.